Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Missouri was posted on June 4, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Wentzville Middle School and Heritage Elementary Tuckpointing

Closed
RFP-F-431State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The project involves comprehensive masonry repair and sealing work at Wentzville Middle School and Heritage Elementary School, with a total contract value estimated between $50,000 and $150,000. The scope includes cleaning all brick and limestone surfaces using Enviro Klean by Prosoco and hot water at approximately 180 degrees Fahrenheit under 400 psi, followed by tuckpointing about 5% of the brickwork with Type N mortar, ensuring it is set at least seven days prior to washing. The work also entails grinding mortar joints to a minimum of half an inch with dustless vacuum methods in accordance with OSHA guidelines, then lightly rinsing to remove debris, and matching tooling, texture, and color to existing mortar. Additionally, the project involves removing and replacing damaged bricks, sealing window perimeters with silicone sealant that is highly elastic and requires priming and adhesion testing, and sealing all expansion joints and building perimeters to the sidewalk. The scope further includes caulking around all penetrations and doors, painting exposed steel with DTMC, and ensuring proper application of sealers and caulks to prevent water infiltration. All major work and mobilization are expected to be completed before August 18, 2025. The project emphasizes quality control through sealant adhesion testing and adherence to safety standards, with detailed procedures for surface preparation, sealant application, and masonry repairs to ensure durability and aesthetic consistency.

General Info

Agency

Missouri → Wentzville R-IV School District

Place of Performance

MO, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMissouri → Wentzville R-IV School District
ContactsNo contacts available
OfficeN/A
Organization / Agency
Missouri → Wentzville R-IV School District
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Wentzville Middle School Tuckpointing Specs and Scope:Bio clean Brick and LimestoneBio Clean all masonry with Enviro Klean by Prosoco and hot water, approximately 180 degrees at no more than 400 p.s.i.Tuckpoint 5% of BrickGrind with a dustless vacuum per OSHA GuidelinesGrind min. 1⁄2” in depth or to sound mortarLightly rinse ground mortar joints to remove any contaminants or loose materialInstall Type “N” mortar.Tooling, texture, and color to match existingMortar to set no less than seven (7) days prior to washing with detergents to expose sand Cut out and recaulk window perimetersRemove existing sealant from window perimetersClean and prep both edgesSolvent wipeInstall backing to the proper depthApply silicone sealant with no less than 100% elasticity, tooled to a concave finishDepending on the manufacturer, sealant priming may be requiredPull and adhesion testing of the sealant will be required before installationCut out and re-caulk all expansion jointsRemove existing sealantClean and prep both edgesSolvent wipeInstall backing to the proper depthApply silicone sealant with no less than 100% elasticity, tooled to a concave finish Depending on the manufacturer, sealant priming may be requiredPull and adhesion testing of the sealant will be required prior to installationCaulk the building perimeter to the sidewalkRemove existing sealantMechanically remove the existing urethane sealantClean and prep both edgesSolvent wipeInstall backing to the proper depthApply, tooled to a concave finishPull and adhesion testing of the sealant will be required prior to installationCaulk around all the man doorsPaint exposed steel with DTMCaulk around all penetrationsReplace bricks as identified in the pre-bidTooth out the existing damaged brick, and install a new one to match the existingSeal MasonrySeal with Chemstop by EuclidSealer should be applied from the lower level up once you have a 3” rundown, you can proceed toseal vertically for proper application (Do not start from top and work down, this will incur streaking)DeliveryAll major work and mobilization are to be complete before August 18th, 2025Heritage Elementary School Specs and Scope:Bio clean Brick and LimestoneBio Clean all masonry with Enviro Klean by Prosoco and hot water, approximately 180 degrees at no more than 400 p.s.i.Tuckpoint 5% of BrickGrind with a dustless vacuum per OSHA GuidelinesGrind min. 1⁄2” in depth or to sound mortarLightly rinse ground mortar joints to remove any contaminants or loose materialInstall Type “N” mortar.Tooling, texture, and color to match existingMortar to set no less than seven (7) days prior to washing with detergents to expose sand Cut out and recaulk window perimetersRemove existing sealant from window perimetersClean and prep both edgesSolvent wipeInstall backing to the proper depthApply silicone sealant with no less than 100% elasticity, tooled to a concave finishDepending on the manufacturer, sealant priming may be requiredPull and adhesion testing of the sealant will be required before installationCut out and re-caulk all expansion jointsRemove existing sealantClean and prep both edgesSolvent wipeInstall backing to the proper depthApply silicone sealant with no less than 100% elasticity, tooled to a concave finish Depending on the manufacturer, sealant priming may be requiredPull and adhesion testing of the sealant will be required prior to installationCaulk the building perimeter to the sidewalkRemove existing sealantMechanically remove the existing urethane sealantClean and prep both edgesSolvent wipeInstall backing to the proper depthApply, tooled to a concave finishPull and adhesion testing of the sealant will be required prior to installation

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS