This Solicitation opportunity from Washington was posted on September 16, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The West Duwamish Wet Weather Storage project involves the construction of a combined sewer overflow control facility and an interceptor diversion structure in the West Duwamish area of Washington. The scope includes modifying the existing Terminal 115 Overflow Structure and upgrading mechanical, electrical, and instrumentation and control systems at the West Michigan Street Regulator Station to enhance capacity and operational efficiency. This initiative aims to improve stormwater and wastewater management, reducing overflow events and environmental impact in the region.
The contract is valued between $50 million and $100 million and was posted on September 16, 2025, with a response deadline of September 30, 2025. It is managed by King County and is open for bidding without specific set-aside restrictions. Interested parties can contact Julie Thiele via email for further details. The project underscores a significant infrastructure investment to bolster sewer system resilience and environmental compliance in Washington.
HighAI Summary for First Material Modification to 2013 Consent Decree - King County CSO Control: This document is the First Material Modification to the Consent Decree originally entered on July 3, 2013, between the United States, the State of Washington, and King County regarding combined sewer overflow (CSO) control measures. It details agreed changes including extended deadlines for construction completion to December 31, 2037, revised definitions related to performance criteria and moving averages, and updated requirements for CSO control measures and reporting. The modification addresses increased CSO volumes and climate change impacts, requiring court approval as a material change to the original decree.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for KC001462 Addendum 2 for West Duwamish Wet Weather Storage: This document is Addendum Number 2 for Contract KC001462, West Duwamish Wet Weather Storage project, dated 08/28/2025. It amends multiple sections and volumes of the original bidding documents, including the Form of Bid, Bidding Schedule, Responsibility Detail Form, Supplemental Terms and Conditions, Work Restrictions, Permits and Easements, and various technical specifications and drawings. The addendum replaces or deletes specified pages and sections across seven volumes, ensuring bidders have updated contract terms and technical details. Bidders must acknowledge this addendum in the E-Procurement system for their bids to be accepted.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for KC001462 Addendum 4 for West Duwamish Wet Weather Storage: This document is Addendum Number 4 for Contract KC001462 concerning the West Duwamish Wet Weather Storage project. Dated 9/16/2025, it amends the bidding documents by replacing several sections and drawings across multiple volumes, including specifications for piping systems, ball valves, submersible wastewater pumps, tipping buckets, and various structural and water service details. The addendum includes revised technical specifications and drawings that bidders must acknowledge in the E-Procurement system. It references updated standards and design requirements, emphasizing compliance with City of Seattle and WSDOT standards.
XLSX
XLSX, High priority: read this firstbidding-schedule
HighAI Summary for KC001462 Bidding Schedule Amendment 1: This document is an Excel workbook titled KC001462-bidding-schedule-ad-1.xlsx containing bidding schedules formatted for four procurement types: Lump Sum, Unit Price, Base Bid with Alternates, and Work Order. It provides instructions for client agencies to complete the appropriate worksheet based on their procurement type and upload the draft bidding schedule with their Invitation to Bid (ITB) package. The Lump Sum worksheet includes bid items such as the West Duwamish Wet Weather Storage Project, Trench Excavation Safety Systems, and Seattle Department of Transportation Street Use Permit, with a total bid price calculated as the sum of these items. The document is intended to assist in preparing bid submissions for the specified project.
XLSX
XLSX, High priority: read this firstbidding-schedule
HighAI Summary for KC001462 Bidding Schedule for ITB: This document is a bidding schedule workbook named KC001462, designed for use with Invitation to Bid (ITB) packages. It contains four worksheets formatted for different procurement types: Lump Sum, Unit Price, Base Bid with Alternates, and Work Order. The instructions guide client agencies to complete the appropriate worksheet based on their procurement type and upload the draft bidding schedule with their ITB package. The Lump Sum worksheet includes bid items such as the West Duwamish Wet Weather Storage Project, Trench Excavation Safety Systems, and a Seattle Department of Transportation Street Use Permit allowance, with a total bid price of $60,000.
XLSX
XLSX, High priority: read this firstbidding-schedule
HighAI Summary for KC001462 Bidding Schedule Worksheet: This document is a bidding schedule worksheet for procurement, containing four worksheets formatted for different procurement types: Lump Sum, Unit Price, Base Bid with Alternates, and Work Order. It provides instructions for client agencies to complete the appropriate worksheet based on their procurement type and upload the draft bidding schedule with their Invitation to Bid (ITB) package. The Lump Sum worksheet includes bid items such as all work indicated in the contract documents, trench excavation safety systems, and a street use permit, with a total bid price summation.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for KC001462 West Duwamish Wet Weather Storage Addendum 1: Addendum Number 1 for Contract KC001462 West Duwamish Wet Weather Storage project dated 8/11/2025. This document amends the original bidding documents including revisions to the Invitation to Bid, Form of Bid, Bidding Schedule, Responsibility Detail Form, and Reference Material across multiple volumes. It notifies prospective bidders of changes and requires acknowledgment in the E-Procurement system. The addendum includes updated bid submission instructions, pre-bid conference and site tour details, subcontracting opportunities, apprenticeship requirements, and federal funding compliance information.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for KC001462 West Duwamish Wet Weather Storage Addendum 3: Addendum Number 3 for Contract KC001462, West Duwamish Wet Weather Storage project, dated 9/10/2025. This document amends multiple sections and drawings across seven volumes of the bidding documents, including Invitation to Bid, Bidding Schedule, Wage Rates, Supplemental Terms and Conditions, and various technical specifications and drawings. It includes revisions to bidding documents, technical specifications, and construction drawings, and requires bidders to acknowledge the addendum in the E-Procurement system. The addendum also reminds bidders to review clarifications and provides updated contact information and bid due dates.
PDF
PDF, High priority: read this firstitb
HighAI Summary for KC001462 West Duwamish Wet Weather Storage ITB Volume 1: This document is Volume 1 of 7 for the West Duwamish Wet Weather Storage project, identified by contract number KC001462. It serves as an Invitation to Bid (ITB) and includes bidding requirements, forms, and general terms and conditions dated July 2025. The volume contains detailed sections such as instructions to bidders, non-discrimination requirements, bid forms, wage rates, qualification information, bonds, insurance, and general and supplemental terms and conditions. It is funded in part by the Department of Ecology Clean Water State Revolving Fund and the U.S. Environmental Protection Agency (EPA). The document emphasizes environmental protection standards and compliance with state and federal regulations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for King County PLC and OIT Installation and Programming Requirements May 2015: This document, issued by King County Department of Natural Resources Wastewater Treatment Division in May 2015, provides detailed proprietary guidelines for the installation and programming of PLC (Programmable Logic Controller) and OIT (Operator Interface Terminal) systems. It includes a comprehensive issue register tracking revisions from 1999 to 2013, and covers equipment guidelines, software guidelines, installation guidelines, wiring, communications interfaces, testing requirements, and appendices with drawings, network programming, software submittals, and graphic representations. The document serves as a technical specification for contractors and consultants involved in PLC and OIT system implementation at King County Offsite Facilities, specifying hardware, software, programming languages, control strategies, and testing protocols.
PDF
PDF, High priority: read this firstsow
HighAI Summary for King County West Duwamish Wet Weather Storage Project Archaeological Resources Monitoring and Inadvertent Discovery Plan July 2024: This Archaeological Resources Monitoring and Inadvertent Discovery Plan (ARM/IDP) prepared in July 2024 by Environmental Science Associates for King County Wastewater Treatment Division outlines procedures for archaeological monitoring and handling inadvertent discoveries during construction of the West Duwamish Wet Weather Storage Project in Seattle, Washington. The plan covers project description, regulatory context, area of potential effects, monitoring methods, response protocols for archaeological finds and human remains, communication and reporting requirements, and includes cultural resource contacts. It aims to ensure compliance with federal and state laws, protect archaeological resources potentially eligible for the National Register of Historic Places, and guide contractors during ground disturbance activities.
PDF
PDF, High priority: read this firstconstruction-notes
HighAI Summary for Seattle City Light Distribution Engineering Customer Drawing Work Order 2213720: This document provides construction notes and requirements for Seattle City Light Distribution Engineering related to Work Order No. 2213720. It includes instructions for obtaining permits, locating underground utilities, installation of conduits and service termination facilities, and inspection scheduling. Specific construction details cover the installation of a precast handhole, service conduits, and NEC service conduits and conductors. The document references Seattle City Light construction standards and emphasizes safety and clearance requirements for underground structures and equipment. It serves as a technical guide for the proper installation and inspection of electrical service facilities.
PDF
PDF, High priority: read this firstsow
HighAI Summary for West Michigan Street Regulator Station Main Control Panel PLC Programming: This document is a detailed project tag listing for the West Michigan Street Regulator Station Main Control Panel PLC programming, dated 6/21/2022. It includes comprehensive data on various PLC tags such as BOOL variables, timers, and control signals used in the control logic for gate operations, purge cycles, and supervisory modes. The document provides constant values, external access points, and data types for each tag, essential for programming and configuring the PLC system. It serves as a technical specification and statement of work for the PLC programming task in this project.
PDF
PDF, Low priorityconsent-decree
LowAI Summary for Consent Decree - King County Clean Water Act Case 2:13-cv-677: This document is the Consent Decree for Civil Action No. 2:13-cv-677 filed in the United States District Court for the Western District of Washington. It involves the United States of America and the State of Washington as plaintiffs against King County, Washington, for alleged violations of the Clean Water Act related to combined sewer overflows (CSOs). The decree outlines jurisdiction, objectives, compliance programs, reporting requirements, penalties, and other legal and operational provisions. It includes appendices detailing CSO outfalls, control measures, and operational plans. The document was filed in 2013 and represents a negotiated settlement to avoid litigation, addressing King County's wastewater system and CSO control efforts.
PDF
PDF, Low prioritypole-hold-form
LowAI Summary for Pole Hold Form P.271225 Lumen Pole ID A1682903: This document is a Pole Hold Form for pole number P.271225, identified as Lumen Pole ID A1682903. It includes detailed technical data such as pole length, class, species (Douglas Fir), setting depth, allowable stress, wind speed, and various load factors. The form provides pole capacity utilization percentages, pole moments, guy system component summaries, guy wire and brace loads, anchor/rod load summaries, and pole buckling data. The document is used to assess the structural integrity and load capacity of the utility pole under specified conditions.
PDF
PDF, Low priorityother
LowAI Summary for Record Drawing of 15-inch City of Seattle Sewer Pipe: This document is a record drawing of the existing 15-inch-diameter City of Seattle sewer pipe, identified as Drawing 867-72. It serves as a reference for the existing infrastructure but does not contain solicitation or contract information.
PDF
PDF, Low priorityother
LowAI Summary for Record Drawings of Existing T115 Overflow Structure and West Duwamish Interceptor: This document contains record drawings of the existing T115 overflow structure and the West Duwamish Interceptor. It appears to be a reference or informational file related to these structures. No solicitation or contract-specific information is provided.
PDF
PDF, Low priorityother
LowAI Summary for Record Drawings West Duwamish Interceptor 8-inch City of Seattle: This document appears to be record drawings related to the West Duwamish Interceptor, specifically for an 8-inch-diameter section in the City of Seattle. The content provided is empty or unreadable, so no further details can be extracted.
PDF
PDF, Low priorityremedial-investigation-report
LowAI Summary for Remedial Investigation Report for Terminal 115 Plant 1 Parcel A: This document is the final Remedial Investigation Report dated August 18, 2023, for Parcel A of Terminal 115 Plant 1 Cleanup site in Seattle, Washington. It presents the results of environmental investigations conducted to characterize contamination at the site, which is targeted for the West Duwamish Combined Sewer Overflow Control Project. The report includes site history, field investigations, sampling and analytical results, screening levels, conceptual site model, and remedial conclusions. It supports regulatory compliance under Washington Administrative Code and an Agreed Order involving the Port of Seattle, Boeing Company, Washington State Department of Ecology, and EPA. The report aims to determine if cleanup actions are warranted for the approximately 1.33-acre gravel parking lot site near the Duwamish River.
PDF
PDF, Low priority1 page · specifications
LowAI Summary for Seattle City Light Distribution Engineering Customer Drawing (WO 2405203): A technical drawing or specification document for Seattle City Light Distribution Engineering associated with Work Order No. 2405203, dated 7/17/24.
PDF
PDF, Low prioritypole-hold-form
LowAI Summary for Seattle City Light Pole ID 1359049 Pole Hold Form: This document is a Pole Hold Form for Seattle City Light Pole ID 1359049, reviewed by Engineer Angel Morales on 10/29/2024. It details pole specifications including type (W Red Cedar), class (CL.1), height (35 ft), embedded depth (5.5 ft), and diameter at grade (13.61 in). It lists conductor types and quantities, presence of one guy wire, and communication attachment contact information for Comcast with contact Kyle Kinney. The form appears to be used for internal tracking and review of pole characteristics and attachments.
PDF
PDF, Low prioritypole-hold-form
LowAI Summary for Seattle City Light Pole ID 1359333 Pole Hold Form: This document is a pole hold form for Seattle City Light Pole ID 1359333, reviewed by Engineer Angel Morales on 10/29/2024. It details the pole specifications including type (W Red Cedar), class (CL.1), height (35 ft), embedded depth (5.5 ft), and diameter at grade (13.61 in). The form lists SCL conductors, including primary, neutral, and secondary types, with specific details for a #2 AWG Triplex secondary conductor. It notes the presence of streetlights as other equipment on the pole and provides contact information for communication attachments, specifically Comcast with contact Kyle Kinney. The form serves as a technical record for pole characteristics and attachments.
PDF
PDF, Low prioritypole-hold-form
LowAI Summary for Seattle City Light Pole ID 1359339 Pole Hold Form: This document is a Pole Hold Form for Seattle City Light Pole ID 1359339, reviewed by Engineer Angel Morales on 10/29/2024. It details pole specifications including type (W Red Cedar), class (CL.1), height (35 ft), embedded depth (5.5 ft), and diameter at grade (13.61 in). It lists SCL conductors and guy wire information, and includes contact information for communication attachments, specifically Comcast with contact Kyle Kinney. The form appears to be used for utility pole management and coordination purposes.
PDF
PDF, Low priorityreport
LowAI Summary for West Duwamish CSO Control Project Critical Areas Report Final Revision 3: This document is the Critical Areas Report for the West Duwamish Combined Sewer Overflow (CSO) Control Project, Final Revision 3 dated January 11, 2024. It addresses documentation required by the City of Seattle Environmental Critical Areas Code, focusing on critical areas within 300 feet of the proposed project construction area. The report includes project background, objectives, location, and description, detailing the project's goal to control CSO discharges to meet environmental standards. It covers wetlands, fish and wildlife habitat conservation areas, and geologic hazard areas, with methods including document review and field investigation. The report also discusses potential impacts from construction and operations, mitigation measures, and references. Appendices provide detailed methodologies, data sheets, rating forms, photographs, and reconnaissance memos.
PDF
PDF, Low priorityrecord-drawings
LowAI Summary for West Duwamish Interceptor and West Michigan Street Regulator Record Drawings June 1965: This document contains record drawings for the West Duwamish Interceptor and West Michigan Street Regulator dated June 1965. It includes architectural and electrical plans such as ground floor plans, room finish schedules, door schedules, lighting and power plans, conduit and cable schedules, and reference drawings. The document provides detailed technical information about materials, dimensions, electrical wiring, and installation notes relevant to the infrastructure project.
PDF
PDF, Low priorityrecord-drawings
LowAI Summary for West Michigan Street Regulator Station Facility Record Drawings April 2018: This document contains the facility record drawings for the West Michigan Street Regulator Station, dated April 2018. It includes various diagrams and photos related to the facility, such as one-line diagrams and photo scales, but does not contain solicitation or contract information.
PDF
PDF, Low priorityother
LowAI Summary for West Michigan Street Regulator Station Metrotel RTU Project Tag Listing: This document is a project tag listing for the Metrotel_RTU controller used in the West Michigan Street Regulator Station. It includes detailed data such as tag names, values, data types, and scope related to the RTU programming. The document appears to be a technical reference for the controller's configuration and programming, including Modbus slave addresses and SCADA access points. The file path and revision information indicate it is a specific version of the RTU programming file, but it does not constitute a solicitation or contract document.
Construct West Duwamish Combined Sewer Overflow (CSO) Control Facility and West Duwamish Interceptor Diversion Structure, modify existing Terminal 115 Overflow Structure and make improvements to existing mechanical, electrical, and instrumentation and control (I&C) systems to existing West Michigan Street Regulator Station.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award