West Main/Elliots Crossing Water, Sewer, Storm Drainage and Street Improvements

Closed
PE-74521-NONST-2026-000000021State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and incidentals necessary to furnish, install, commission, and deliver a fully functional project. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete pipes and structures. Specialized services required for the project include electrical work, welding, construction surveys, preconstruction video, and traffic control. Norstar Plumbing and Engineering, Inc. is managing the solicitation and is specifically seeking certified and qualified DBE, MBE, SBE, and WBE subcontractors and suppliers to support these efforts. The project falls under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications are available through the Inland Empire Utilities Agency bidding website, and coordination is handled by primary points of contact Nathan and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 6 hours ago

DEADLINE

in about 19 hours
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, site grading, and the provision of a fully operating pumping station equipped with mechanical and electrical systems, a generator, and odor control equipment. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with responsiveness contingent upon the submission of a completed EJCDC C-410 Bid Form, a bid bond, and required MWBE documentation, including a Good Faith Efforts Form and Table A. The contractor must provide performance and payment bonds equal to the contract price and maintain insurance with an A.M. Best rating of A-VII or better. Performance is governed by a Notice to Proceed, with liquidated damages set at 1,000 dollars per day for failure to achieve substantial completion. Payments are processed monthly via applications for payment submitted to the Engineer, with payment due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 13 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work includes the rehabilitation of covered and open concrete structures, the relining, modification, or replacement of steel and ductile iron pipes and supports, and the installation or replacement of valves and piping appurtenances. Additionally, the project requires the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. Bids will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines or comments along with the quote.
Garney Pacific, Inc.

POSTED

about 6 hours ago

DEADLINE

in 21 days
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities Project No. EN19001.03 and the Butterfield Lift Station Improvements Project No. EN26054 located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 dual force mains from El Prado Road to Kimball Avenue. Additionally, the project requires the construction of the Mountain Avenue Lift Station with two submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operational service. Filanc is seeking quotes across a wide array of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and E&IC. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on equal opportunity and DBE participation. All bids and quotes must be submitted by October 29, 2025, at 2:00 PM.
Filanc

POSTED

about 6 hours ago

DEADLINE

in about 19 hours

AI Contract Overview

Show more

The City of Thomaston, Georgia, is soliciting bids for comprehensive infrastructure improvements along West Main and Elliotts Crossing, encompassing water, sewer, storm drainage, and road construction within the project’s right-of-way. The scope includes installing 3,700 linear feet of 8-inch CL350 ductile iron water main and 3,572 linear feet of 8-inch gravity sanitary sewer line using both open-cut and trenchless methods, alongside 90 new service lines, hydrants, gate valves, fittings, 16 manholes, and 90 cleanouts. Stormwater infrastructure requires construction of a stormwater pond with an outlet control structure and headwalls, plus 1,808 linear feet of reinforced concrete pipe in diameters ranging from 18 inches to 42 inches, along with associated catch basins and junction boxes. The project includes half a mile of full-depth asphalt paving, curb and gutter installation, replacement of existing driveway aprons on Roads A and C, adjustment of existing utilities such as valves and manholes, new signage, traffic striping, erosion control, and full site restoration. All materials and construction must comply with the Build America, Buy America Act as outlined in OMB M-22-11, requiring U.S.-sourced iron, steel, and manufactured products, and Section 3 of the HUD Act of 1968, which promotes economic opportunities for low-income residents and businesses within the local community. Bid submissions must be sealed physical copies delivered to the City Manager’s Office by 2:00 PM on May 6, 2026, with no electronic submissions accepted. Bidders must register with QuestCDN.com and pay a non-refundable $200 fee to obtain project plans and specifications. Each bid must include a bid bond or certified check equal to 5% of the base bid amount, issued by a Georgia-licensed surety with an “A” rating and financial capacity equal to five times the contract value. Upon award, the contractor must furnish Performance and Payment Bonds totaling 100% of the contract price, with a Power of Attorney attached. The contractor must be licensed by the State of Georgia and coordinate work activities with a developer-selected site contractor. The City reserves the right to reject any bid that is nonresponsive, nonconforming, or unbalanced. No formal evaluation factor weights or award methodology are stated, but compliance with all regulatory, bonding, and licensing

General Info

Installation of water and sewer mains, stormwater pond, road paving, utility adjustments, and traffic signage.

Documents

1

00100 Advertisement for Bids - West Main/Elliotts Crossing Improvements

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from May 18, 2026 to May 29, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Thomaston
Contacts1 person available
OfficeN/A
Organization / AgencyGeorgia → City of Thomaston
Office AddressN/A

Full Description

Show more
Installation of 3,700 LF of 8¿ CL350 DIP Water Main, 90 meters, new service lines by open cut and trenchless applications, new hydrants, gate valves and additional fittings, testing. Installation of 3,572 LF of 8¿ gravity main through open cut and trenchless applications, the installation of 16 manholes, the installation of 90 new cleanouts, and all other equipment, labor, materials, and testing to complete the work as required in the plans and specifications. This work will include the installation of a stormwater pond with accompanying outlet control structure and headwalls, 337 LF of 42¿ RCP, 709 LF of 36¿ RCP, 687 LF of 30¿ RCP, 354 LF of 24¿ RCP, and 321 LF of 18¿ RCP through open cut applications, the installation of various catch basins and junction boxes that remain in the ROW, and all other equipment, labor, materials, and testing to complete the work as required in the plans and specifications. This work will include ¾ of a mile of full depth paving of asphalt in the roads, removing and replacing any existing driveway aprons on roads A and C, curb and gutter along the paved roads, raising and lower valves/manholes/etc., and installing new signage and striping.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS