Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

West Water Tank Renovation

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The West Water Tank Renovation project, located at 19 N Plenty Hawk Drive in Crow Agency, Montana, involves the comprehensive refurbishment of a 670,000-gallon water storage tank. The contractor is responsible for providing all labor, materials, and equipment to perform interior and exterior renovations, including sanding, blasting, sealing, painting, and non-destructive testing of steel and welds. Additionally, the scope includes upgrading all tank components such as valves, piping, ladders, hatches, gaskets, screens, and the tank level indicator. To ensure the continuous water supply for over 1,650 residents and critical local facilities, including a hospital and school, the contractor must manage temporary water tanks and coordinate daily refills with the Water Plant Operator. All materials and equipment used for potable water storage must comply with WRAS guidelines and NSF/ANSI Standard 61, with required third-party verification. The contractor is also tasked with identifying underground utilities before excavation and repairing any damages to code. This project is designated as an Indian Small Business Economic Enterprise set-aside under the Department of the Interior.

General Info

Renovation of 670,000-gallon water tank in Crow Agency, Montana, including components and upgrades.

Agency

Department of the Interior

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

MT, USA

Set-Aside

ISBEE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment of the Interior
Contacts2 people available
OfficeN/A
Organization / Agency
Department of the Interior
Office AddressN/A
Contacts
Nikolai Matoka

Full Description

Show more
Contractor will provide equipment with adequate water capacity. Contractor will conduct daily filling of temporary water tank to ensure the community has sufficient water supply. An area will be determined for tank resupply for daily use. All potable water tanks designed to store water must be fit for human consumption and made out of materials that adhere to WRAS (Water Regulations Advisory Scheme) guidelines. The Contractor must supply all labor, materials, equipment, tools, services, and insurance for renovating a 32-foot-high, 63-foot-diameter water storage tank (capacity: 670,000 gallons). The project includes sufficient water provision, non-destructive testing (NDT) of steel and welds, interior and exterior renovations (sanding, blasting, sealing, painting), and upgrades to all tank components such as valves, piping, ladders, hatches, gaskets, screens, and tank level indicator (TLI). Location: 19 N Plenty Hawk Drive, Crow Agency, MT 59022. All work must meet NSF/ANSI Standard 61 for potable water safety. The Contractor will provide certification with third-party verification and ensure materials are WRAS-compliant for human consumption. Responsibilities include identifying and marking underground utilities before excavation, repairing any damage to code, supplying daily water during refurbishment, and coordinating with the Water Plant Operator to secure water for over 1650 residents and area businesses (housing, hospital, school, daycare, senior home, veterans complex). Contractor will assess infrastructure, determine water needs, and maintain temporary tanks throughout the project.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station in Belmont, North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and utilizes EJCDC standard forms for its contracting requirements. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents. Bidders must provide a bid bond, evidence of authority to do business in North Carolina, and documentation of good faith efforts to meet MBE and WBE participation goals, which are set at 10 percent combined for the state and approximately 10.9 percent for MBE and 10.4 percent for WBE per EPA goals. Performance and payment bonds, as well as proof of insurance, are required. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with payments becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the installation of FRP reinforcing systems and access hatches. Technical requirements include the relining, modification, or replacement of steel and ductile iron pipes, installation of valves and piping appurtenances, and the operation of a temporary 11 MGD pumped bypass. Additional tasks encompass electrical and instrumentation upgrades, rehabilitation of reactor mixers and aerators, motor control center component replacement, sluice and slide gate modifications, and general excavation and surveying. This solicitation is open to small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities, with a specific emphasis on DBE, MBE, WBE, and SBE subcontractors. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid for reimbursement. Quotes for services and supplies, including lead abatement, metals fabrication, and trucking, are due by November 17, 2026, with the final bid date set for November 18, 2026. Any exceptions to standard subcontract forms must be submitted as redlines alongside the quote.
Garney Pacific, Inc.

POSTED

about 2 hours ago

DEADLINE

in 22 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS