Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Western Area Power Administration (WAPA) Rocky Mountain Region (RMR) has a requirement for a project titled Loveland Field Maintenance Building Door to remove and dispose of existing doors, frames, g…

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

238290 - Other Building Equipment Contractors

Place of Performance

CO, USA

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment of Energy → Western Area Power Administration
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Small Business Program Manager
Small Business Program Manager

Full Description

Show more
Western Area Power Administration (WAPA) Rocky Mountain Region (RMR) has a requirement for a project titled Loveland Field Maintenance Building Door to remove and dispose of existing doors, frames, glazing, and hardware and install new; and Repair/adjust existing door and/or hardware.

Similar Contracts

Same NAICS industry code

NAICS: 238290
New
SLED
Request for Qualifications - Task Order Construction Agreement - Elevator Repairs
Solicitation # 2627-03
California State University, Fresno, acting through the Board of Trustees of the California State University, is seeking Statements of Qualifications from general contractors holding a C-11 license for a three-year Task Order-Construction Agreement for Multiple Projects Master Enabling Agreement. The contract covers design, preconstruction, construction management, and construction services for a portfolio of elevator repair projects across campus, including McLane Hall, the Music Building, Valley Children’s Stadium, and the Grosse Industrial Tech Building. The total budget for all projects is not to exceed 3,000,000 dollars, with a maximum cap of 400,000 dollars per individual project. The delivery methods include Design-Build, Collaborative Design-Build, and Construction Manager at Risk, utilizing a two-phase approach where design and preconstruction task orders precede individual construction agreements based on Lump Sum or Guaranteed Maximum Price proposals. The selection process is a two-step method consisting of an initial RFQ to shortlist the four highest-scoring firms, followed by an RFP stage involving interviews and proposal scoring. To be considered responsive, respondents must be prequalified with the Trustees with a rating of at least 3,000,000 dollars one day prior to the submission deadline of November 24, 2026. Mandatory requirements include registration with the Department of Industrial Relations, adherence to prevailing wage laws, and the submission of a signed Skilled and Trained Workforce Agreement. Additionally, the contract mandates a minimum of 3 percent subcontracting to Disabled Veteran Business Enterprises. Evaluation criteria include the firm's composite safety score, CAL-OSHA history over the past five years, and experience utilizing DVBEs.
CSU, Fresno

POSTED

2 days ago

DEADLINE

in about 1 month
View Details
NAICS: 238290
New
SLED
Replace Elevator Jacks At Point Loma High School
Solicitation # PC27-0449-33-00-00
The San Diego Unified School District is soliciting informal bids for solicitation number PC27-0449-33-00-00 to replace failed hydraulic elevator jacks at Point Loma High School Building 800. The project has an estimated value of 55,000 dollars, which includes a 5,000 dollar lump sum allowance for billable hours and unforeseen conditions. The scope of work requires the installation of new OEM replacement jacks in accordance with specifications prepared by HKA Elevator Consulting and includes a 12-month warranty service following construction. Final acceptance is contingent upon the jack assemblies operating properly throughout full travel, remaining synchronized, and being free of leakage. Eligible bidders must possess a C-11 California State Contractors License, be prequalified with the District, and be registered with the DIR. A mandatory site visit was scheduled for October 14, 2026, with a bid submission deadline of October 22, 2026, via PlanetBids. Responsive bids must include a 10 percent bid security bond or cashier's check, a completed Non-Collusion Declaration, and a subcontractors list for any entity performing more than 0.5 percent of the total bid value. The successful contractor will be required to provide performance and payment bonds, insurance certificates for general liability, auto liability, and workers' compensation, and a Drug-Free Workplace Certification. All work must adhere to prevailing wage determination 2026-2.
SAN DIEGO UNIFIED SCHOOL DISTRICT

POSTED

2 days ago

DEADLINE

in 4 days
View Details

More opportunities from Department of Energy → Western Area Power Administration

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS