Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Pennsylvania was posted on October 23, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Westover Well Tie-in and Treatment Plant Upgrades

Closed
PennBid: 158627State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business designations, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by the deadline of December 4, 2026. The scope of work involves comprehensive sewer installation and site development, including the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Key structural requirements include the installation of standard and doghouse manholes, interior drop assemblies, and a CSO regulator fit out. Specialized tasks include 24-inch DIP trenchless crossings with associated launch and receiving shafts, as well as the abandonment of existing pipes and manholes. Site work entails clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Critical project deliverables include the maintenance of flows and bypass for all pipes and manholes to ensure operational continuity, along with geotechnical instrumentation and monitoring. Additionally, the project requires specific railroad insurance. The bid schedule outlines various general and contingent items, including mobilization and extra depth excavation, though the total estimated contract value is not specified.
Cleary Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer connections. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on responsiveness regarding the submission of MWBE documents, including the Good Faith Efforts Form and Table A. Performance is governed by EJCDC standard forms, including the C-700 General Conditions and C-800 Supplementary Conditions. The contractor is required to provide performance and payment bonds, as well as proof of insurance. Project timelines are triggered by a Notice to Proceed, and failure to achieve substantial completion will result in liquidated damages of 1,000 dollars per day. Payment is processed via applications for payment submitted to the Engineer, with terms due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 11 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation and operation of a temporary 11 MGD pumped bypass. Additionally, the project entails the rehabilitation of reactor mixers and aerators, replacement of motor control center components, modifications to sluice and slide gates, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to various small business set-asides, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Subcontractors are specifically requested for lead abatement, metals fabrication, painting, coatings, FRP reinforcing systems, and access hatches. All subcontractors must utilize union labor and be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of bid for reimbursement. Quotes are due by November 17, 2026, and the final bid date is November 18, 2026. Contracts will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 2 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The Westover Municipal Authority is soliciting bids for a project designated as Contract No. W-01-24, which involves the tie-in of a new well to the existing treatment plant and upgrades to the facility, including the installation of an air stripper, a small building addition, chemical injection systems, a settling basin, and instrumentation improvements. Bids must be submitted electronically via PennBid by 10:00 AM on November 19, 2024, with the opening and reading of bids occurring publicly at that time. The project scope encompasses construction work at the water treatment plant located in Westover, Pennsylvania, and is funded through Appalachian Regional Commission and Clearfield County CDBG funds, requiring bidders to comply with specific funding-related requirements such as MBE/WBE participation, HUD Section 3, Civil Rights, E-Verify, and Davis-Bacon wage determinations. Prospective bidders can review the bidding documents free of charge either electronically through PennBid or in person at the issuing office of JHA Companies in Montrose, PA, or by appointment at the Westover Municipal Authority office. A non-mandatory pre-bid conference will be held on November 6, 2024, at the treatment plant, providing an opportunity for bidders to clarify project details. The project’s estimated construction cost ranges from $500,000 to $2,000,000, and all bidding procedures, qualifications, and contract award criteria are detailed in the Instructions to Bidders included in the bidding documents.

General Info

Agency

Pennsylvania → Westover Municipal Authority, Clearfield County

Place of Performance

PA, USA

Set-Aside

NONE

Documents

15

Addendum No. 1 - Well Tie-In and Treatment Plant Upgrades Project

PDF, High priority: read this first14 pages · amendment
High

Addendum No. 2 – Well Tie-In and Treatment Plant Upgrades Project

PDF, High priority: read this first21 pages · amendment
High

BABA Certification Instructions

PDF, High priority: read this firstsow
High

IFB 7-00982 MBE/WBE Solicitation Compliance Statement

PDF, High priority: read this first1 page · special-notice
High

Section 3 Affirmative Action Plan - Contractor Certification

PDF, High priority: read this first2 pages · sow
High

W-01-24 Well Tie-in and Treatment Plant Upgrades Specs

PDF, High priority: read this first854 pages · specifications
High

Westover Municipal Authority - Well Tie-In and Water Treatment Plant Upgrades

PDF, High priority: read this firstsow
High

10-00600 CDBG Bid Bond

PDF, Low priority2 pages · bid-bond
Low

11-00992 CDBG Compliance with BABA

PDF, Low priority6 pages · guidance
Low

CDBG Certification of Non-Segregated Facilities and Non-Employment

PDF, Low priority1 page · certification
Low

CDBG Cert of Bidder Regarding Equal Employment Opportunity

PDF, Low priority1 page · certification
Low

CDBG Non-Collusion Affidavit of Prime Bidder

PDF, Low priority1 page · other
Low

CDBG Statement of Bidder's Qualifications

PDF, Low priority1 page · past-performance
Low

Public Works Employment Verification Form

PDF, Low priority1 page · form
Low

W-01-24 Well Tie-In and Water Treatment Plant Upgrades Bid Results

PDF, Low priority1 page · other
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Westover Municipal Authority, Clearfield County
ContactsNo contacts available
OfficeN/A
Organization / Agency
Pennsylvania → Westover Municipal Authority, Clearfield County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Westover Municipal Authority (Owner) is requesting Bids for the construction of the following Project: Contract No. W-01-24 Well Tie-in and Treatment Plant Upgrades Bids for the construction of the Project will be received by Westover Municipal Authority electronically through PennBid (https://pennbid.bonfirehub.com), until 10:00 AM local time, Tuesday, November 19, 2024. At that time the Bids received will be opened and read aloud publicly. The Project includes the following Work: Tie-in of the new well to the treatment plant and upgrades to the treatment plant, including and air stripper, small building addition, chemical injection, settling basin, and instrumentation. Bids are requested for a single Contract: Contract No. W-01-24 Well Tie-in and Treatment Plant Upgrades Obtaining the Bidding Documents The Issuing Office for the Bidding Documents is: JHA Companies, 466 South Main Street, Montrose, PA 18801. Prospective Bidders may examine the Bidding Documents at no cost either electronically at www.PennBid.bonfirehub.com or at the Issuing Office, Monday through Friday, 8:00 AM to 5:00 PM. Bidding Documents may be obtained at no cost electronically at www.PennBid.net. Additionally, Contract documents may also be reviewed, by appointment, at the office of the Westover Municipal Authority,143 Tannery Road, Westover, PA 16692; +1 (555) 000-0000. A pre-bid conference for the Project Bidders only will be held Wednesday, November 6, 2024, at 10:00 am. The meeting will be at the water treatment plant at 657 Mary Street, Westover, PA 16692. Attendance at the pre-bid conference is not mandatory. The project is being financed by an Appalachian Regional Commission and Clearfield County CDBG funds. Bidders are required to adhere to the following funding requirements – • MBE/WBE • HUD Section 3 • Civil Rights • E-Verify • Davis Bacon Minimum Wage Rates shall be United States Department of Labor, Davis-Bacon Act Determinations. Instructions to Bidders. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS