Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

WGB Window Replacement | BWC270493 | FY27 | JD

Open
SRC0000043024State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This project involves the removal and replacement of seven existing windows with broken seals at the William Green Building located at 30 West Spring St., Columbus, OH. The contractor is responsible for providing all labor, materials, and equipment, ensuring all work complies with OSHA 29 CFR 1926, Ohio Safety Regulations, and building policies. Key deliverables include a Site-Specific Safety Plan (SSSP), full site assessments to identify fall and electrical hazards, and the installation of new window units with proper anchoring, waterproofing, and insulation. Quality control requires field testing for air leakage and water infiltration, and the project concludes with a final walkthrough to confirm the removal of all hazards. The contract requires a mandatory site visit on December 2, 2026, and all proposals must be submitted via OhioBuys. Bidders must be registered with OhioBuys and have a payee/supplier ID. Required documentation includes a completed IRS form W-9, a Contractor/Subcontractor Affirmation and Disclosure Form, and an Affirmative Action Program Verification Form for contracts valued at $5,000 or more. The successful bidder must provide manufacturer warranties for the window units and a one-year installation workmanship warranty. Award will be granted to the lowest responsive and responsible bidder.

General Info

Contract for replacing seven broken windows at the William Green Building.

Place of Performance

OH, USA

Set-Aside

NONE

Documents

6
XLSX, High priority: read this first2 pages · bid-schedule
High
PDF, High priority: read this firstspecifications
High
DOCX, High priority: read this first2 pages · specifications
High
DOCX, High priority: read this first2 pages · submission-instructions
High
DOCX, High priority: read this first5 pages · sow
High
PDF, Low priorityother
Low

Read all 6 documents

Due in 19 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 19 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 6 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOhio → Bur Of Workers' Compensation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
A MANDATORY SITE VISIT TO MEASURE WINDOWS IS REQUIRED - DETAILS / INFORMATION FOLLOWS:This project involves the removal and replacement of seven (7) existing windows with broken seals on the William Green Building located at 30 West Spring St., Columbus, OH.Contractor shall perform all work in accordance with applicable OSHA standards, Ohio Safety Regulations, building policies, and industry best practices.All labor, materials, equipment, site safety controls, and coordination activities must be executed to maintain a safe environment for workers, building occupants, and pedestrians while minimizing operational disruption.Work Requirements & DeliverablesPre‑Construction Activities Conduct full site assessment, including identification of safety hazards such as fall exposures, electrical hazards, and overhead risks Review specifications with emphasis on safety‑critical elements Coordinate schedule with building management, ensuring proper notifications for any areas requiring restricted access Establish staging areas, hoist locations, and material storage plans that prevent tripping hazards, falling‑object risks, and unprotected access Safety Planning Develop and submit a Site‑Specific Safety Plan (SSSP) detailing fall protection systems, equipment inspection protocols, emergency procedures, and environmental controls Comply with OSHA 29 CFR 1926 (Construction Safety Standards), local high‑rise rules, and building owner safety policies Provide and maintain all required fall‑protection systems (guardrails, personal fall‑arrest systems, swing stages, scaffolding, or rope‑access systems) inspected daily and logged Ensure only trained and authorized personnel access elevated work platforms and restricted zones Review planned tasks and hazards daily with employees Window Removal Protect interior finishes, furnishings, and flooring with coverings where applicable Secure interior work zones to prevent unauthorized entry during removal operations Remove existing window units and components using methods that minimize airborne particulates and falling‑object hazards Dispose of materials per environmental regulations, ensuring glass and sharp items are placed in approved containers Inspect rough openings for structural deficiencies and report any unsafe conditions before proceeding Window Installation Install new window units per manufacturer and engineering requirements, ensuring safe handling procedures for large glass panels Use mechanical lifting devices or team lifts to prevent injury and maintain control of materials at height Ensure proper anchoring, waterproofing, flashing, and insulation while maintaining secure footing and harness anchorage Apply compatible perimeter sealants while preventing exposure to harmful fumes through appropriate ventilation or respirators Provide temporary protection and secure openings until sealants cure and final safety checks are complete Interior & Exterior Finishes Repair interior finishes using dust‑control measures (HEPA vacuums, containment barriers) Clean frames and glazing with non‑hazardous materials Remove all temporary protective systems and debris while keeping work areas orderly and free of hazards Quality Control & Testing Perform field testing (water infiltration, air leakage) using safe access and equipment inspection procedures Conduct inspections with building management while maintaining controlled access to elevated work areas Document corrective actions and safety compliance measures Timeline & Phasing Provide a detailed project schedule including safety sequencing and access limitations. Coordinate access to minimize tenant disruption and ensure safe circulation around work areas Work may be scheduled during normal hours unless safety or noise considerations require otherwise. Provide alternate pricing for work to be completed after business hours. Contractor Responsibilities Attend pre-bid site visit. Provide trained and qualified personnel experienced in high‑rise glazing and certified in fall protection, aerial lift use, and scaffold operation Maintain compliance with building security and safety procedures, including sign‑in and parking requirements Maintain clean, organized work areas; remove debris daily; and mitigate any emerging hazards immediately Provide all Personal Protective Equipment (PPE) including hard hats, safety glasses, cut‑resistant gloves, high‑visibility garments, and fall‑protection equipment Ensure all equipment is inspected daily and meets manufacturer and OSHA safety standards Warranty & Closeout Provide manufacturer warranties for window units Provide 1 year installation workmanship warranty Deliver maintenance and safety guidelines for future window servicing Conduct final walkthrough and obtain acceptance, confirming no remaining hazards **PLEASE REVIEW ALL THE ATTACHED DOCUMENTS AND SCOPE OF WORK FOR FURTHER DETAILS **YOUR PROPOSAL WILL NOT BE CONSIDERED WITHOUT THE SUBMITTAL OF REQUIRED SCHEDULE FOR SUBMISSION-BID SHEET COSTS WHICH IS ATTACHED A MANDATORY site visit will be conducted at: William Green Building 30 W Spring Street, Columbus OH 43215 Site Visit Date: Wednesday,December 2, 2026 Site Visit Time: 1:00 pm – 3:00 pm EST Bidder must be registered with Ohio Buys and have received a payee/supplier ID. If unsure, you can verify at https://ohiopays.ohio.gov/Pricing must remain valid for a minimum of 90 days.The State Standard Terms and Conditions apply to this solicitation. No additional terms and conditions will be accepted.
The contract will be awarded to the lowest responsive and responsible bidder as determined by the State.**In the event of a tie in best pricing, BWC's policy is to select the supplier from the group of tied suppliers that submitted their proposal first and provided a responsive and responsible bid.
Building maintenance and repair services
Items I1_000001 | Required Item | Window replacement

Similar Contracts

Same NAICS industry code

NAICS: 238150
New
Three Double Pane Glass replacements units 2
Solicitation # three-double-pane-glass-replacements-units-2
Human Learning Systems dba Quentin Burdick Job Corps is soliciting bids for a subcontracting opportunity to replace three double-pane glass units at the Quentin N. Burdick Job Corps Center in Minot, North Dakota. The scope of work includes the removal and installation of one insulated glass unit and two fire-rated insulated glass units for the Male Dormitory and Recreation Center. The contractor must provide all necessary labor, materials, and equipment to ensure the units are securely sealed, weather-tight, and compliant with applicable building codes and fire-rating certifications. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Qualified bidders must possess a current North Dakota contractor's license and maintain a minimum of $1M in General Liability and Workers Compensation insurance. Proposals must be submitted via the provided bid sheet by December 4, 2026, at 4:00pm CST. The contract requires compliance with the Service Contract Act (SCA) and various FAR clauses, including certifications regarding debarment and anti-lobbying. Awardees must provide a minimum one-year workmanship warranty and a 30-day follow-up period at no additional charge. Payment terms are Net 30 following service completion verification and receipt of invoice.
Human Learning Systems dba Quentin Burdick Job Corps

POSTED

about 8 hours ago

DEADLINE

in 16 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS