Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on July 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Wheatland Regional Sewer Pipeline Project

Closed
CWSRF Project No C-06-8753-110State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont, North Carolina, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Additional deliverables include the installation of new gravity sewers and manholes, a generator, odor control equipment, stormwater facilities, and site fencing. The project has an estimated value of $16,690,000 and is set aside for small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts forms. The agreement is governed by EJCDC standard forms, requiring performance and payment bonds and proof of insurance. Performance begins upon a Notice to Proceed, and payment is processed monthly via applications for payment submitted to the Engineer, with payments due 30 days after presentation to the owner. Final acceptance is contingent upon a joint inspection by the Owner, Contractor, and Engineer, the completion of a punch list, and the Engineer's written recommendation for final payment.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, the relining, modification, or replacement of steel and ductile iron pipes and supports, and the installation or replacement of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is set aside for small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of the bid for reimbursement. Quotes are due by November 17, 2026, at 2:00 PM PT, with the general bid date following on November 18, 2026. Contracting will be based on Garney Standard Purchase Order and Subcontract documents, and any exceptions must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 1 hour ago

DEADLINE

in 20 days
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities (Project No. EN19001.03) and Butterfield Lift Station Improvements (Project No. EN26054) located in Chino and Chino Hills, California. The scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 pipelines for the Butterfield Dual Force Main. Additionally, the project requires modifications to the RP-2 Lift Station to accommodate Prado Basin flows, which includes replacing existing pumps with smaller units and constructing an elevated electrical platform to protect equipment from 100-year flood levels. Key electrical deliverables include new SCE electrical services and the installation of a standby generator. Filanc is seeking quotes across a wide range of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and E&IC. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on equal opportunity and DBE participation. Bids and proposals are due by October 29, 2025, at 2:00 PM. Primary contact for this opportunity is Julia Masaitis.
Filanc

POSTED

about 1 hour ago

DEADLINE

in about 4 hours

AI Contract Overview

Show more

The Wheatland Regional Sewer Pipeline Project is a major infrastructure undertaking by the City of Wheatland, California, to construct a 7.7-mile pipeline and two new pump stations as part of a wastewater conveyance system extending to the OPUD Wastewater Treatment Plant. The project includes horizontal directional drilling, demolition and replacement of an existing pump station, culvert replacement, site restoration, electrical controls installation, and comprehensive start-up and testing, all to be completed in accordance with detailed specifications outlined in six volumes of contract documents. The pipeline will be constructed using PVC pipe meeting AWWA, ASTM, and NSF Standard 61 certifications for potable water contact, while the pump stations include a replacement facility on a constrained site and a new facility at a separate location, with one also serving as a potable water booster station with a new generator. The total estimated cost is divided into a $19 million pipeline bid schedule and a $33 million pump station bid schedule, with bids due by August 18, 2026, and work to commence upon issuance of a Notice to Proceed. Performance must be completed within 425 working days for the pipeline and 600 working days for the pump stations, adhering to strict timelines and quality benchmarks. Contract compliance demands adherence to federal and state regulations including the Davis-Bacon Act, California Labor Code Section 3700, and state wage rate provisions, with all contractors and subcontractors required to demonstrate experience, financial capacity, and a history of successful project delivery without liquidated damages or disputes. Bidders must submit comprehensive certifications including debarment status, drug-free workplace, anti-lobbying, Iran and Russia sanctions compliance, and safety compliance, alongside bond requirements of 10% bid security, 100% payment and performance bonds from California-admitted sureties, and workers’ compensation coverage. Equipment and materials must be properly packaged, labeled, and protected during shipment with bar coding in compliance with AIAG standards and durability meeting MIL-STD-810C criteria. Foreign-owned electronic equipment from Huawei, ZTE, Hikvision, Dahua, and Hytera is strictly prohibited. All work must conform to accepted industry standards, with inspections conducted at origin, factory, or site, and final acceptance reserved for the City Council following the City’s representative’s recommendation. The project also enforces American Iron and Steel requirements with no waivers allowed, and requires detailed recordkeeping accessible for audit by the City within 24 hours’ notice

General Info

Build 7.7-mile sewer pipeline, two pump stations, and related infrastructure for $52 million in California.

Documents

9

City of Wheatland - Regional Sewer Pipeline Project Site Inspection Instructions

PDF, High priority: read this firstspecial-notice
High

City of Wheatland Regional Sewer Pipeline Project - Supplemental Clarifications

PDF, High priority: read this firstq-and-a
High

City of Wheatland Regional Sewer Pipeline Project - Supplemental Clarifications

PDF, High priority: read this firstamendment
High

City of Wheatland Regional Sewer Pipeline Project Volume 2 - Pipeline Specifications

PDF, High priority: read this firstspecifications
High

Volume 3 - Pump Stations Specifications for City of Wheatland Regional Sewer Pipeline Project

PDF, High priority: read this firstspecifications
High

Volume 5 - Pump Station Plans

PDF, High priority: read this firstspecifications
High

Wheatland Regional Sewer Pipeline Project Volume 1 - Bid Book

PDF, High priority: read this firstbid-book
High

Addendum 1.zip

ZIP

Addendum 2.zip

ZIP

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Aug 18, 2026 to Aug 25, 2026. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Wheatland
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
In accordance with the Contract Documents (Volumes 1 through 6) prepared by DCCM and Nexgen Utility Management, the work (“Work”) includes furnishing of all labor, materials, tax, equipment, incidentals and services for the construction and completion of the Wheatland Regional Sewer Pipeline (“Project”). The Project includes but is not limited to construction of a 7.7-mile pipeline, two pump stations, horizontal directional drilling, demolition and replacement of an existing pump station, electrical controls, culvert replacement, site restoration, start-up and testing, and all other additional and various items of work as needed to construct a complete and operational project as specified in these Contract Documents. The estimated cost for this Work is: • Pipeline Bid Schedule $19,000,000 • Pump Station Bid Schedule $33,000,000

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS