Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from New York was posted on May 31, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Whitney Road West Sidewalk Replacement

Closed
2110557State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves the installation of approximately 1,650 linear feet of new concrete sidewalk along Whitney Road from Baird Road to 650 Whitney Road in Monroe County. The scope includes removing existing asphalt sidewalks, excavating, installing subbase materials, and adjusting utilities such as valve boxes, manholes, and service covers. Additionally, the project entails removing an existing curb cut, constructing a new curb cut and ADA-compliant sidewalk ramp, restoring driveways, and performing site grading and restoration between the roadway edge and the new sidewalk, as well as behind the sidewalk. The work also requires implementing temporary erosion control measures and ensuring the safety and protection of vehicular and pedestrian traffic throughout the project duration. The project has a completion timeline of 90 days, with a due date for bids set for June 21, 2024. It is not set aside specifically for service-disabled veteran-owned businesses but has subcontracting goals of 12% for minority-owned and 3% for women-owned businesses. The contract value is estimated to range between $150,000 and $300,000. The project is managed by the Town of Perinton, with primary contact being Eric Williams, Assistant DPW Commissioner. The awarded contractors, such as Hynes Concrete and Rochester Earth Inc., have previously completed similar projects within the past five years.

General Info

Agency

New York → Town of Perinton

Place of Performance

NY, USA

Set-Aside

NONE

Documents

1

Town of Perinton Whitney Road West Sidewalk Replacement Advertisement for Bids

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNew York → Town of Perinton
Contacts1 person available
OfficeN/A
Organization / Agency
New York → Town of Perinton
Office AddressN/A
Contacts
Eric WilliamsAssistant DPW Commissioner

Full Description

Show more
The project consists of the installation of approximately 1,650 Linear Feet of Concrete Sidewalk.  The Project includes removal of existing asphalt sidewalk, excavation, installation of subbase material, adjustment of miscellaneous utilities (valve boxes/services, manhole frame and covers, etc.), and installation of new concrete sidewalk.  Work also includes removal of one existing curb cut, and installation of one new curb cut and ADA sidewalk ramp, driveway restorations, and site grading and restoration between the edge of roadway and new sidewalk, and behind the newly installed sidewalk.  The project also includes all necessary temporary erosion control and maintenance and protection of vehicular and pedestrian traffic. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 12% Women Owned Sub-Contracting Goal: 3% Due date:06/21/2024 11:00 AM Contract term: 90 Days County(ies): Monroe Location: Whitney Road (from Baird Rd to 650 Whitney Rd) Business entities awarded an identical or substantially similar procurement contract within the past five years: Hynes Concrete Rochester Earth Inc.  

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS