This Government Contract opportunity from Department Of Agriculture was posted on September 19, 2008. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Amendment 1 - Solicitation AG-05G1-S-08-0033 (Wild Rose Day Use): Amendment 1 to solicitation AG-05G1-S-08-0033 for Wild Rose Day Use Naches Ranger District, issued by the USDA Forest Service Colville National Forest on August 27, 2008. The amendment replaces page 23 of the specifications to revise Table 404.1 (Sampling and Testing Requirements) and adds previously omitted Fire Protection and Suppression and Camping Rules and Regulations. Proposals remain due September 12, 2008, at 3:00 p.m.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for S02 Vicinity Map - USDA Forest Service: A vicinity map for a USDA Forest Service project in the Nicoles Range District. The document identifies project site locations, including the source for rock masonry signbase (Item 63002) and gate-masonry post (Item 63004) located on Road 1304, as well as the Nache's and Wild Rose Coast project locations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for S03-Est_Quant - Estimated Quantities: A document containing an estimated quantities table for sign installation, specifically for Trade Control and Entrance/Exit Control. It includes item numbers, quantities, units, and pricing columns.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for S07-PAVEMENT_MARKINGS: Technical drawing specifications for pavement markings for the USDA Forest Service R-6, detailing diagonal parking stall markings, solid lines, and accessible parking dimensions.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for S12-Gate Masonry Post - Weld Detail and Elevation: Technical drawing/specification document from the USDA Forest Service (R-6) produced by Precision Engineering Group, Inc. It contains weld details and elevation specifications for a masonry post gate (Revision 1/1).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Sign Installation - Traffic Control Item 63001: Technical specifications document regarding Sign Installation for Traffic Control Item 63001, referencing U.S. Department of Transportation standards.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for Solicitation AG-05G1-S-08-0033: Wild Rose Day Use: A negotiated solicitation (RFP) issued on 8/13/2008 by the Colville National Forest for the 'Wild Rose Day Use' project in the Naches Ranger District, Yakima County, Washington. The government estimate is between $100,000 and $250,000. This is a Hubzone Small Business Certified Set-Aside. Performance must be completed within 30 calendar days after notice to proceed. Offers are due by 15:00 local time on 9/12/2008.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for USDA Forest Service R-6 Gate Masonry Post Details: Technical drawing and specification document dated 11/30/2023 from the USDA Forest Service R-6 for forest fire designated use. The document provides masonry post and cap plate details for gate lock post deflection rise, including hardware specifications such as 1/4-14 UNC requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for USDA Forest Service Roadway & Parking Lot Template: Technical template and specifications for roadway and parking lot construction, including section details and excavation requirements, issued by the USDA Forest Service R-6 as of September 15, 2018.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for USDA Forest Service - Sign Installation Entrance Item G3002: Technical specifications for the installation of entrance sign item G3002 for the U.S. Department of Agriculture Forest Service (R-6). The document details hardware requirements, including specific bolt and nut sizes (3/8-11), installation mandates by qualified mechanics, and technical dimensions for shrink stoppings.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for USDA Gate - Metal Pipe TEM 6300 Specifications: Technical specifications and design details for a metal pipe gate (TEM 6300) for the U.S. Department of Agriculture. The document specifies a 48-inch minimum requirement and provides welding and plating details for single gate open point posts.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Washington General Decision Number WA080001 (08/08/2008): Wage determination for Heavy, Highway, and Dredging construction projects in Washington State, dated August 8, 2008. The document specifies hourly rates and fringe benefits for various carpenter and diver classifications across different regions, including the Columbia River Area, Spokane Area, and Southwest Washington. It includes detailed group classifications, depth pay for divers, hazmat premiums, and zone-based pay differentials.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Wild Rose Day Use Fire Protection and Camping Specs - RFQ AG-05G1-S-08-0033: Amendment #1 to the specifications for fire protection and suppression for the Wild Rose Day Use project within the Okanogan-Wenatchee National Forest (RFQ AG-05G1-S-08-0033). The document details fire prevention measures, required equipment (extinguishers, shovels, axes), spark arrester standards, and Industrial Fire Precaution Levels (IFPL) effective from April 1 to October 31.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Wild Rose Day Use Project Specification List: A project specification list for the Wild Rose Day Use Project, dated July 15, 2008. The document outlines a comprehensive index of technical sections, including terms, scope of work, control of materials, and specific construction requirements such as asphalt, aggregate, and signage.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Wild Rose Day Use Specifications RFP AG-05G1-S-08-0033: Technical specifications for the Wild Rose Day Use project (RFP AG-05G1-S-08-0033) within the Naches Ranger District, Okanogan-Wenatchee National Forest. The document outlines terms, definitions, scope of work, material sources, and specific construction requirements for crushed aggregate, hot asphalt concrete, and sign/gate installation.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Wild Rose Day Use Specifications RFQ AG-05G1-S-08-0033 Amendment 1: Amendment 1 to the specifications for RFQ AG-05G1-S-08-0033 (Wild Rose Day Use) for the Naches Ranger District. The document provides updated technical requirements for roadway paving compaction (Section 404.07), revised sampling and testing requirements for asphalt mixture (Table 404-1), and detailed specifications for sign traffic control installation (Section 63001).
PDF
PDF, Low priorityspecifications
LowAI Summary for S11-PipeGateDetails: A document containing visual inspection details for PipeGate S11.
PDF
PDF
PDF
PDF
PDF
PDF
AI Contract Breakdown
Uniform Contract Format
Contract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
3 updates
PhaseAwarded
Posted
Presolicitation
Notice updated
Response deadline changed from Aug 20, 2008 to Sep 4, 2008. The notice description changed.
Notice updated
Response deadline changed from Sep 4, 2008 to Sep 12, 2008. The notice description changed.
Notice updated
The notice description changed.
Type Changed
Presolicitation → Solicitation
Awarded
Contract was awarded
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Organization & Contact Information
Show more
AgencyDepartment Of Agriculture → Colville National Forest
Okanogan-Wenatchee National Forest, Wild Rose Day Use. The Okanogan - Wenatchee National Forest located in Central Washington State has a requirement for reconstruction of roadway and parking lot at the Wild Rose Day Use area on the Naches Ranger District. The project is located in Yakima County, Washington State. The project is approximately 20 miles west of Naches, WA on US 12. The Contractor shall furnish all management, labor, equipment, supervision, tools, materials, transportation, operating supplies, supervision, workman's compensation, unemployment insurance and incidentals necessary to perform the work in accordance with the specification and provisions of the contract. The project consists of, but not limited to, grading of roadway and parking lot of subgrade for crushed aggregate and hot mix asphalt paving. The work also includes: placing of aggregate and hot mix asphalt for trail surfacing; and constructing of a masonry rock sign base and gate structure. Work is estimated to begin in late September 2008 with a completion date of 30 calendar days from the Notice to Proceed. Both payment and performance bonds will be required. Magnitude of construction is between $100,000 and $250,000. This project will be advertised as a written request for proposals. Estimated issue date of the solicitation is on or about August 13, 2008. Proposals are estimated to be due September 12, 2008. The actual due date will be listed in the solicitation. This acquisition is set aside for Hubzone Certified Small Business Concerns. NAICS code is 237990, size standard is $31.0 million. All responsible sources may submit a proposal which will be considered. An electronic copy of the solicitation will be posted at this site on the issue date.