Wilfred Booster Station Electrical Upgrade Project
Active
State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
California → Sonoma County Water Agency
Place of Performance
Rohnert Park, CASet-Aside
NONE
Timeline
Organization & Contact Information
Show more
AgencyCalifornia → Sonoma County Water Agency
Contacts1 person available
OfficeN/A
Organization / Agency
California → Sonoma County Water Agency
Office AddressN/A
Contacts
Full Description
Show more
The proposed project would upgrade the existing electrical system at the Wilfred Booster Pump Station, built in 1969, that conveys potable water through the Petaluma Aqueduct (pipeline). The upgrades would consist of replacing the existing 250 square-foot electrical building with a 550 square-foot building to accommodate current PG&E metering and safety requirements, providing a portable generator connection box motor valve actuators, and installing a 200 square-foot storage shed on an existing concrete pad. Construction would require minor grading and trenching in areas previously developed at the Wilfred Station. Also, trees along the border of the Station may be trimmed, but not removed. These upgrades would not change the pumping capacity of the Station.
Similar Contracts
Same NAICS industry code
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
