Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Wilson Acres Mutual Water Company Infrastructure Rehabilitation Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Wilson Acres Mutual Water Company Infrastructure Rehabilitation Project in Tehama County, California, is designed to replace failing and aging water infrastructure to ensure the delivery of safe and reliable water to customers. The scope of work involves replacing approximately 3,200 feet of existing water mains with new 6-inch polyvinyl chloride PVC mains and replacing 32 existing water service lines. Additionally, the project includes the installation of water meters with backflow preventors at 32 residences, the construction of a concrete masonry unit block building around the well head, and the upgrade of electrical equipment, including well pumps, flow meters, and conduits. To meet maximum day demand, an existing 900-gallon hydropneumatic tank will be replaced with a new 13,000-gallon tank, and an emergency standby generator with an automatic transfer switch will be installed. The project will be executed within an unincorporated area of Tehama County, specifically on district-owned property and within the paved road rights-of-way of Alma Avenue, Fern Avenue, Citrus Road, and Orange Grove Road. All work is to be completed in previously disturbed areas with no tree removal, and any impacted paved roads must be repaved following the installation of the water main improvements. The project is categorized under NAICS code 237110 and is managed by the Tehama County Environmental Health Department. It has been granted categorical exemptions under California CEQA Guidelines, indicating that the improvements are minor alterations and replacements that will not result in significant environmental impacts.

General Info

Replace 3,200 feet of water mains, upgrade service lines, install new tank and generator, restore pavement, no capacity increase.

Agency

California → Tehama County

Place of Performance

Riverside Ave, Orange Grove Rd, Fern Ave, Alma Ave, Citrus Rd, CA, 96080

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Tehama County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Tehama County
Office AddressN/A

Full Description

Show more
The original project included replacing ~3,200 feet of the existing water mains with new 4-inch polyvinyl chloride (PVC) water mains and replacing the 32 existing water service lines. The purpose of the project is to replace failing and aging water infrastructure to provide safe and reliable water to customers. The revised project includes the following improvements: • Replacing ~3,200 feet of the existing water mains with new 6-inch polyvinyl chloride (PVC) water mains. • Replacing the 32 existing water service lines. • Installation of water meters with backflow preventors at the existing 32 residences. • Installing a concrete masonry unit (CMU) block building around the well head. • Upgrading all electrical equipment including well pumps, flow meter, and conduits. • Replacement of an existing 900-gallon hydropneumatic tank with a new 13,000-gallon hydropneumatic tank to meet maximum day demand. • Installation of an emergency standby generator with an automatic transfer switch. All work would be completed in previously disturbed areas, and no trees would be removed to accommodate the proposed improvements. Paved roads would be repaved following the installation of the water main improvements.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for labor, materials, and services for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves extensive sewer infrastructure improvements, including the open-cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional deliverables include the construction of an outfall and a CSO regulator fit out. Project requirements also encompass critical site management and compliance tasks, such as the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass. General base bid items include mobilization, clearing and grubbing of wooded areas, and seeding and fine grading. Notably, the project requires specific railroad insurance.
Cleary Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To complete these objectives, the project requires a full suite of materials, labor, and equipment, including specialized services such as jack and bore, cold planing, SWPPP, AC paving, welding, potholing, and preconstruction video. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with certified DBE, MBE, SBE, WBE, SBRA, and LSAF firms. Interested subcontractors must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for this effort are Destiny Plummer and Nathan Plummer. All work must be performed in strict accordance with the project bid documents and specifications provided by the Inland Empire Utilities Agency.
Norstar Plumbing and Engineering, Inc

POSTED

about 3 hours ago

DEADLINE

in 1 day
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS