This Solicitation opportunity from Connecticut was posted on January 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
WINDSOR STREET AREA SEWER SEPERATION PHASE 2: WATER MAIN RELOCATION AND REPLACEMENT
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Contract 2024B-20, titled Windsor Street Area Sewer Separation Phase 2: Water Main Relocation and Replacement, is an Invitation to Bid issued by The Metropolitan District in Hartford, Connecticut. The project involves comprehensive water infrastructure work, including the installation of approximately 2,260 linear feet of 12-inch and 35 linear feet of 8-inch ductile iron water mains with restrained joints on Windsor Street between Sanford Street and Main Street. The scope also requires the transfer of numerous water services of varying sizes and the removal and replacement of seven fire hydrant assemblies. Additionally, the contract mandates the abandonment of roughly 2,000 linear feet of existing water main on Windsor and Sanford Streets, as well as 1,300 linear feet of a 6-inch water main on the east side of Main Street. The bidding process includes a question deadline of February 17, 2026, and a final due date of March 9, 2026. Dana Chalupka serves as the primary Contract Specialist for this effort.
General Info
Place of Performance
Set-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 14 days
- Lift Station No. 85 ReplacementOpen now, due in 25 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
You must log in to register for Bid Events and to view Bid Question and Response information.
NUMBER 2024B-20 TITLE WINDSOR STREET AREA SEWER SEPERATION PHASE 2: WATER MAIN RELOCATION AND REPLACEMENT AVAILABLE DATE 1/30/2026 9:30 AM QUESTION DEADLINE 2/17/2026 4:00 AM DUE DATE 3/9/2026 10:00 AM CONTACT INFORMATION
Dana Chalupka
Contract Specialist
The Metropolitan District
555 Main Street
Hartford CT
Phone +1 (•••) •••-••••Sign up to see this detail ext 3391
BID TYPE ITB DESCRIPTION
The Work shall consist of all labor, equipment, fees, permits, and other related costs necessary to provide for the installation of approximately 2,260 LF of 12-in ductile iron water main with restrained joints and 35 LF of 8-in ductile iron water main with restrained joints installed on Windsor Street between Sanford Street to Main Street. The transfer of 19 water services smaller than 4-inches, the transfer of 14 water services greater than 4-inches, and removal and replacement of 6 fire hydrant assembly on Windsor Street. Abandonment of approximately 2,000 LF of existing water main on Windsor Street and Sanford Street. Abandonment of approximately 1,300 LF an existing 6-inch water main on the east side of Main Street, from Windsor Street to Montville Street including the transfer of 10 water services smaller than 4-inches, the transfer of 7 water services greater than 4-inches, and removal and replacement of 1 fire hydrant assembly. Bidders are directed to Section 01010 Summary of Work for specific details. The Work is located in the City of Hartford; in the State of Connecticut as shown on the Bidding Documents.
More opportunities from Connecticut → The Metropolitan District
Same awarding agency
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
