Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Connecticut was posted on January 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

WINDSOR STREET AREA SEWER SEPERATION PHASE 2: WATER MAIN RELOCATION AND REPLACEMENT

Closed
2024B-20State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
The Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project in Oakland, California, is a comprehensive infrastructure effort for the East Bay Municipal Utility District. The scope of work involves the rehabilitation of open and covered concrete structures, including resurfacing and the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, the installation of valves and piping appurtenances, and the modification of sluice and slide gates. Additionally, the project requires the rehabilitation of reactor mixers and aerators, the replacement of motor control center components, and the installation of new electrical and instrumentation systems. Support services include the operation of a temporary 11 MGD pumped bypass, lead abatement, excavation, trench work, and surveying. This solicitation is set aside for Small Business (SB), including SBA certified Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Women-Owned Small Business (WOSB), and HUBZone Small Business (HUBZone SB). Garney Pacific, Inc. is seeking qualified subcontractors, specifically targeting those with DBE, MBE, WBE, and SBE certifications. All subcontractors must utilize union labor and be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company. Quotes are due by November 17, 2026, with a final bid date of November 18, 2026.
Garney Pacific, Inc.

POSTED

about 7 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

Contract 2024B-20, titled Windsor Street Area Sewer Separation Phase 2: Water Main Relocation and Replacement, is an Invitation to Bid issued by The Metropolitan District in Hartford, Connecticut. The project involves comprehensive water infrastructure work, including the installation of approximately 2,260 linear feet of 12-inch and 35 linear feet of 8-inch ductile iron water mains with restrained joints on Windsor Street between Sanford Street and Main Street. The scope also requires the transfer of numerous water services of varying sizes and the removal and replacement of seven fire hydrant assemblies. Additionally, the contract mandates the abandonment of roughly 2,000 linear feet of existing water main on Windsor and Sanford Streets, as well as 1,300 linear feet of a 6-inch water main on the east side of Main Street. The bidding process includes a question deadline of February 17, 2026, and a final due date of March 9, 2026. Dana Chalupka serves as the primary Contract Specialist for this effort.

General Info

Water main relocation and replacement project on Windsor Street, Hartford, bidding ends March 2026.

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 14 days
  • Lift Station No. 85 ReplacementOpen now, due in 25 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyConnecticut → The Metropolitan District
Contacts1 person available
OfficeCT, USA
Office AddressCT, USA
Contacts
Dana ChalupkaContract Specialist The Metropolitan District 555 Main Street Hartford CT Phone

Full Description

Show more
Return to Bid List Bid NUMBER 2024B-20 TITLE WINDSOR STREET AREA SEWER SEPERATION PHASE 2: WATER MAIN RELOCATION AND REPLACEMENT PROCESS Offline BASE CURRENCY USD STATUS Awarded DESCRIPTION BIDDERS RESULTS CALENDAR
You must log in to register for Bid Events and to view Bid Question and Response information.
NUMBER 2024B-20 TITLE WINDSOR STREET AREA SEWER SEPERATION PHASE 2: WATER MAIN RELOCATION AND REPLACEMENT AVAILABLE DATE 1/30/2026 9:30 AM QUESTION DEADLINE 2/17/2026 4:00 AM DUE DATE 3/9/2026 10:00 AM CONTACT INFORMATION
Dana Chalupka
Contract Specialist
The Metropolitan District
555 Main Street
Hartford CT
Phone Sign up to see this detail ext 3391
BID TYPE ITB DESCRIPTION
The Work shall consist of all labor, equipment, fees, permits, and other related costs necessary to provide for the installation of approximately 2,260 LF of 12-in ductile iron water main with restrained joints and 35 LF of 8-in ductile iron water main with restrained joints installed on Windsor Street between Sanford Street to Main Street. The transfer of 19 water services smaller than 4-inches, the transfer of 14 water services greater than 4-inches, and removal and replacement of 6 fire hydrant assembly on Windsor Street. Abandonment of approximately 2,000 LF of existing water main on Windsor Street and Sanford Street. Abandonment of approximately 1,300 LF an existing 6-inch water main on the east side of Main Street, from Windsor Street to Montville Street including the transfer of 10 water services smaller than 4-inches, the transfer of 7 water services greater than 4-inches, and removal and replacement of 1 fire hydrant assembly. Bidders are directed to Section 01010 Summary of Work for specific details. The Work is located in the City of Hartford; in the State of Connecticut as shown on the Bidding Documents.

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS