Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Connecticut was posted on April 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

WINHAM WATER WORKS WATER DISTRIBUTION SYSTEM VALVE INSERTIONS

Closed
36179State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont in North Carolina involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station. Key infrastructure work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The scope further encompasses the installation of mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with gravity sewers, manholes, stormwater facilities, and site restoration. The project has an estimated value of 16,690,000 dollars and a substantial completion timeline of 560 calendar days. This solicitation, identified as SRP-W-134-0290, is a unit price contract awarded to the responsible bidder submitting the lowest responsive bid. Bidders must provide a completed EJCDC C-410 Bid Form, a bid bond, and evidence of authority to sign, while also demonstrating good faith efforts toward MWBE goals. The contract requires performance and payment bonds and adherence to strict technical standards, including AWWA Specification C-600 for pipelines and NEMA standards for motors. Payment is processed via monthly applications for payment, with funds becoming due 30 days after presentation to the owner. The project is set aside for small businesses, including certified veteran-owned, women-owned, and HUBZone small businesses.
Don Moorhead Construction, Inc.

POSTED

32 minutes ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, associated supports, valves, and piping appurtenances. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, the rehabilitation of reactor mixers and aerators, and the rerouting of sump pump discharge lines. Electrical and instrumentation work includes the installation of new or improved instrumentation, the rehabilitation and replacement of motor control center components, and modifications to existing sluice gates alongside the installation of new slide gates. The project also involves excavation, trench work, and surveying of key points around the reactors. This is a union project, and all subcontractors must utilize union labor. Potential subcontractors must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid for reimbursement. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026. This opportunity is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms.
Garney Pacific, Inc.

POSTED

32 minutes ago

DEADLINE

in 20 days
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities (Project No. EN19001.03) and Butterfield Lift Station Improvements (Project No. EN26054) located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 dual force mains from El Prado Road to Kimball Avenue. Additionally, the project requires the construction of a new Mountain Avenue Lift Station featuring a concrete wet well and submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operation. Filanc is seeking quotes from various trades, including SWPPP, survey, aggregates, demolition, paving, precast concrete, masonry, metals, coatings, process equipment, fire suppression, piping, and electrical and instrumentation and control. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on equal opportunity and DBE participation. Bids are due by 2:00 PM on October 29, 2025. The primary point of contact for this opportunity is Julia Masaitis.
Filanc

POSTED

32 minutes ago

DEADLINE

in about 10 hours

AI Contract Overview

Show more

The contract involves the complete provision of labor, materials, equipment, and supervision to perform valve insertions within the live Windham Water Works water distribution system at three specific locations in Connecticut. These insertions include an 8-inch valve on asbestos concrete pipe near 478 Valley Street in Willimantic, a 10-inch valve on asbestos concrete pipe near the intersection of Airport Road and Stone Gate Drive in North Windham, and a 12-inch valve on cast iron pipe near 258 Mansfield Avenue in Willimantic. All valves are specified to be the Open Left type, identified by a black operating nut. The contractor is responsible for supplying all necessary resources and tools to complete the work as specified. The solicitation is issued by the Department of Administrative Services Procurement office in Connecticut, with a response deadline of April 30, 2026. The primary contact for the project is Christian Perez, reachable via email or phone for inquiries. This project emphasizes the installation in an active water system, requiring coordinated effort and adherence to standards to ensure minimal disruption during the valve insertions.

General Info

Provide labor, materials, and equipment for live valve insertions at three Connecticut water locations.

Documents

7

ITB 20260414 Windham Water Works Valve Insertions

PDF, High priority: read this first42 pages · itb
High

Solicitation 36179 - Winham Water Works Water Distribution System Valve Insertions Change Report

PDF, High priority: read this firstamendment
High

Solicitation Change Details Report for Solicitation 36179

PDF, High priority: read this first2 pages · amendment
High

Windham Water Works Valve Insertions Addendum 1

PDF, High priority: read this first1 page · amendment
High

Windham Water Works Valve Insertions Addendum 2

PDF, High priority: read this first1 page · amendment
High

Windham Water Works Valve Insertions - Addendum 3

PDF, High priority: read this firstamendment
High

Windham Water Works Valve Insertions - Addendum #4

PDF, High priority: read this firstamendment
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Apr 30, 2026 to Jun 12, 2026.

Deadline changed

Response deadline changed from Jun 12, 2026 to Jul 17, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyConnecticut → DAS Procurement
Contacts1 person available
OfficeCT, USA
Organization / AgencyConnecticut → DAS Procurement
Office AddressCT, USA
Contacts
Christian PerezPrimary Contact

Full Description

Show more
The work to be done encompasses the furnishing of all labor, materials, equipment and supervision for the completion of valve insertions into the live Windham Water Works water distribution system at the following locations: • 8-inch valve insertion on asbestos concrete pipe near 478 Valley Street, Willimantic, CT • 10-inch valve insertion on asbestos concrete pipe near intersection of Airport Road and Stone Gate Drive, North Windham, CT • 12-inch valve insertion on cast iron pipe near 258 Mansfield Ave, Willimantic, CT All valve inserts shall be of the Open Left (black operating nut) type. The Contractor shall furnish all labor, services, materials, equipment, plant, machinery, apparatus, appliances, tools, supplies, and all other things necessary to do all work required for the completion of each item of the work and as herein specified.

More opportunities from Connecticut → DAS Procurement

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS