Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of The Navy was posted on October 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

WIRING HARNESS — 5995016734352 — N0010427QYA19

Closed
Federal
Submission Closed
Solicitation #
N0010427QYA19

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 335929
New
DIBBS
CABLE ASSEMBLY, SPECIAL PURPOSE, ELECTRICA
Solicitation # SPE4A6-27-R-0074
Solicitation SPE4A6-27-R-0074 is a firm fixed price, indefinite quantity contract issued by the DLA Weapons Support ASC Commodities Division for the procurement of special purpose electrical cable assemblies (NSN 6150-01-657-8209). The contract features a five-year base period with an estimated annual demand of 23 units, though the guaranteed minimum and minimum order quantity for the base year are set at 6 units. These are designated as critical application items, with specific part number references for Teledyne Instruments Inc, Seacon Brantner & Associates, and Electric Boat Corporation. Delivery is required 227 days after receipt of order to various CONUS stock locations, with inspection and acceptance occurring at the destination. Technical requirements include compliance with NAVSEA 5100-003D, requiring assemblies to be shock proof with a second boundary of containment for mercury, although mercury is generally prohibited in preservation and packaging per IP056. Packaging must adhere to MIL-STD-2073-1E and RP001, with marking following MIL-STD-129. Quality assurance is governed by MIL-STD-1916 or ASQ H1331, with a zero-non-conformance requirement for acceptance. Additionally, the contractor must provide a CMMC Level 2 self-assessment and adhere to the Buy American and Balance of Payments Program. Evaluation for award will weigh past performance, specifically SPRS assessments, most heavily among non-price factors.
DLA WEAPONS SUPPORT ASC COMMODITIES DIVISION

POSTED

3 days ago

DEADLINE

in 29 days

AI Contract Overview

Show more

Solicitation N0010427QYA19 is a fixed-price procurement issued by the Navsup Weapon Systems Support Mech for the manufacture of AN/BRR-6 Cable Assembly Outboard Harnesses (6W43/6W44) for use on Navy submarines. The scope includes the fabrication of the harness and associated mold assemblies in strict accordance with drawings 8590863, 8590854, and 8603516, as well as NAVSEA manuals S9320-AM-PRO-020/MLDG and S9320-AM-PRO-030/MLDG. A critical requirement of this contract is the total exclusion of metallic mercury to prevent corrosion of vital submarine components. The government has included an option provision allowing for an increase in quantity within 365 days of the award. The contract mandates a rigorous quality assurance program, requiring vendors to be qualified per NAVSEA audit requirements and to maintain inspection systems compliant with ISO 9001, MIL-I-45208, or ISO/IEC 17025. Key deliverables include a government-approved Quality Inspection and Test Plan, first article testing and inspection reports, and comprehensive production lot reports. Mandatory testing for the assemblies includes electrical continuity, dc insulation resistance, nondestructive bonding, and hydrostatic pressure tests. Award evaluation will prioritize past performance over price, utilizing the DoD Supplier Performance Risk System (SPRS) to assess item, price, and supplier risk. Final acceptance is conducted at the origin by the cognizant DCMA-QAR in coordination with the Naval Surface Warfare Center Philadelphia Division.

General Info

Fixed-price contract for manufacturing mercury-free cable assembly outboard harnesses for Navy submarines.

NAICS

335929 - Other Communication and Energy Wire Manufacturing

Place of Performance

MECHANICSBURG, PA, 17050-2411, USA

Set-Aside

Other than Small

Documents

1
PDF, High priority: read this first54 pages · rfq
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Solicitation requirements

46 mandatory

47 requirements in 8 areas

  • Quality Assurance17 · 17 must
    029

    Inspection Records Retention

    Contract notice
  • Technical9 · 8 must
    018

    Manufacture of AN/BRR-6 Cable Assembly Outboard Harness

    Contract notice
  • Eligibility6 · 6 must
    004

    FAPIS Criminal Conviction Representation

  • 44 more requirements, each with its source quote

Read every requirement with its source and proposal context.

Read all 47 requirements

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • PRODUCTION LOT TESTINGOpen now, due in 11 days
  • CABLE, POWER, ELECTRICALOpen now, due in 3 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navsup Weapon Systems Support Mech
ContactsNo contacts available
OfficeMECHANICSBURG, PA, 17050-2411, USA
Office AddressMECHANICSBURG, PA, 17050-2411, USA
ContactsNo contact information available

Full Description

Show more
OPTION
Description
TDP VERSION NUMBER 003 1. SCOPE 1.1 ;This procurement specification contains the requirements for manufacture and the contract quality requirements for ;AN/BRR-6 Cable Assembly Outboard Harness (6W43/6W44); for use on Navy submarines.; 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.1.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.1.3 The "Document Changes" section provides supersessions/changes to referenced documents. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DRAWING DATA=8590854 |53711| -| |D| 0001 | -|-4999|8008004 DRAWING DATA=8590863 |53711| D| |D| 0001 | D|D4999|8030909 DRAWING DATA=8603516 |53711| -| |D| 0001 | -|-4999|8064513 DOCUMENT REF DATA=MIL-STD-130 | | |N |121116|A| | | DOCUMENT REF DATA=MIL-DTL-915 | | |G |020822|A| | | DOCUMENT REF DATA=MIL-DTL-915 | |08|H |020822|A| | | DOCUMENT REF DATA=MIL-DTL-915 | |48|D |020822|A| | | DOCUMENT REF DATA=MIL-STD-973 | | | |950113|A| |03| DOCUMENT REF DATA=ISO9001 | | | |240201|A|1 | | DOCUMENT REF DATA=ISO 10012 | | | |030415|A| | | DOCUMENT REF DATA=MIL-M-24041 | | |C |881220|A| | | DOCUMENT REF DATA=MIL-I-24768 |0027| | |920225|A| | | DOCUMENT REF DATA=SAE-AMS2817G | | | |161101|A| | | DOCUMENT REF DATA=MIL-I-45208A | | | |810724|A|1 | | DOCUMENT REF DATA=MS51844E | | | |121203|A| | | DOCUMENT REF DATA=EIA-649C - 2/19 | | | | |A| | | DOCUMENT REF DATA=ISO/IEC 17025 - 11/17 | | | | |A| | | DOCUMENT REF DATA=SAE-AS28775A - 12/08 | | | | |A| | | DOCUMENT REF DATA=S9320-AM-PRO-020 | | |03 |250716|A| | | DOCUMENT REF DATA=S9320-AM-PRO-030-02/2005 | | |03 | |A| | | DOCUMENT CHANGE DATA=MS28775E |SAE-AS28775A 3. REQUIREMENTS 3.1 ;Design and Manufacturing - The ;AN/BRR-6 Cable Assembly Outboard Harness (6W43/6W44); furnished under this contract/purchase order shall meet the material, electrical, mechanical, physical and test requirements as specified on Drawings 8590863 (consisting of Item Numbers 1 thru 21, 23 and 24), 8590854 and 8603516, NAVSEA Manuals S9320-AM-PRO-030/MLDG and S9320-AM-PRO-020/MLDG and including associated specifications mentioned in this procurement. ; 3.1.1 ;The AN/BRR-6 6W43/6W44 Mold Assembly shall be manufactured per the guidance of Drawing 8603516 (consisting of Item Numbers 1 thru 32) as required by Drawing 8590863.; 3.1.2 ;The connector metal plug body (Item No. 4 of drawing 8590863) surface preparation, application and inspection of non-conductive coating (Plasma Coating) shall be in accordance with NAVSEA Manual S9320-AM-PRO-030/MLDG as specified on Drawing 8590854.; 3.1.3 ;The Polyurethane Molding Compound Type II, Color Amber shall be in accordance with MIL-M-24041 requirements as specified on Drawing 8590863.; 3.1.4 ;All outboard molded cable assemblies shall be manufactured and tested in accordance with NAVSEA Manual S9320-AM-PRO-020/MLDG requirements as specified on Drawings 8590863, Note 3 and 8590854, Note 4.; 3.2 ;Vendor Qualification. As required by Drawing 8590854:; 3.2.1 ;Only vendors which are qualified, per the audit requirements of NAVSEA Manual S9320-AM-PRO-020/MLDG Appendix II-A; and listed on the approved vendors lists in appendix II-A of NAVSEA Manual S9320-AM-PRO-020/MLDG, shall be authorized to fabricate submarine outboard cable assemblies. ; 3.2.2 ;Metal plug bodies surface preparation is only by vendors which are qualified, per the audit requirements of NAVSEA Manual S9320-AM-PRO-030/MLDG Appendix III-H, and listed on the approved vendors lists in appendix III-I of NAVSEA Manual S9320-AM-PRO-030/MLDG, shall be authorized to fabricate non-conductive plasma sprayed ceramic coated submarine outboard connector metal plug bodies.; 3.3 ;Marking Requirements - The supplier shall permanently mark and identify each first article and production lot unit ;Cable Assembly Outboard Harness (6W43/6W44); in accordance with Notes 7 and 8 of Drawing 8590863 per MIL-STD-130. ;Per Note 4 of Drawing 8590863, the supplier shall contact Jason Krol, Sign up to see this detail of NSWC Philadelphia Division for component serial number information.;; 3.3.1 ;The supplier shall mark ;tag or bag; all piece parts with contract, drawing/ item, heat, lot or batch and serial number in accordance with MIL-STD-130 until installed in the designated assembly.; 3.4 ;First Article Testing/Inspection - (Supplier Testing/Inspection). The first article testing/inspection procedure and approval are required for ;Cable Assembly Outboard Harness (6W43/6W44);. Government approval is required prior to commencement of first article unit.; 3.5 ;Notification - The supplier shall notify Naval Surface Warfare Center, Philadelphia Division, (NSWCPD), 5001 S. Broad Street, Philadelphia, PA 19112-1403 by email Sign up to see this detail, Code 242MO after award of contract.; 3.5.1 ;The NSWCPD is the acceptance activity for the Contract Data Requirements List (DD1423) Data Items. NSWCPD WAWF/IRAPT ;Acceptor; DODACC is ;N64498;.; 3.6 Configuration Control - MIL-STD-973 entitled "Configuration Management", Paragraph 5.4.8, Configuration Control (Short Form Procedure), is hereby incorporated. The Contractor shall submit all Engineering Change Proposals in accordance with MIL-STD-973, Paragraph 5.4.8.2 and Appendix D. Requests for Deviations shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.3 and Appendix E. Requests for Waivers shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.4 and Appendix E. (Original and two copies shall be submitted to Contracting Officer, NAVICP-MECH, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.) 3.6.1 Configuration Control - When the Contractor has received authorization on a prior contract for the same NSN for the use of a drawing of a later revision status, that authorization is hereby extended to all succeeding contracts/purchase orders until another drawing revision is approved. The Contractor will notify the PCO of this occurrence in each instance, in the response to the solicitation. Such notification shall be in writing setting forth the contract under which the prior authorization was granted, the date of the granting of the authorization, and the name of the granting authority. Contractors shall also refer technical inquiries (other than those covered by MIL-STD-973) on company letterhead signed by a responsible company official, with copies distributed as stated below. The original and two copies of all Contractor generated correspondence regarding configuration shall be submitted to Contracting Officer, NAVICP-MECH, P.O. Box 2020, Mechanicsburg, PA 17055-0788. Contractors are cautioned that implementing engineering changes, waivers, deviations or technical inquiries into the contract/purchase order without approval of the Contracting Officer will be at the sole risk of the Contractor. 3.7 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material will be cause for rejection. If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part. The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are located so as not to constitute a contamination hazard. If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the requirements of this contract are concerned. These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements. Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided: Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface ship atmosphere. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 4.4 ;Inspection System - The Supplier's Quality Inspection System shall be in accordance with MIL-I-45208 or ISO 9001 and ISO/IEC 17025 or ISO 10012. The supplier shall develop and submit their written Quality Inspection and Test Plan as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the supplier's written Quality Inspection and Test Plan is required by the contract. CDRL: QUALITY INSPECTION & TEST PLAN per MIL-I-45208, ISO/IEC 17025 and DI-QCIC-81110 ; 4.5 ;Finished Edges - Finished shall be in accordance with the applicable drawing requirements.; 4.6 ;Material Control - The supplier shall have an effective material control system that provides for the control of materials by heat, lot or batch as ordered for first article and production lot units. ; 4.7 ;AN/BRR-6 6W43/6W44 Mold Assembly Material/Insp (Dwg. 8603516) Prior to First Article; 4.7.1 ;The supplier shall provide mmaterial certification for 6W43/6W44 Mold Assembly, Item Numbers 2 thru 5, 7, 8, 10, 11, 13, 14, 16, 17, 19, 20, 30, 31 and 32 of the applicable drawing (certifying items to drawing and the applicable material requirements). Records shall be traceable by drawing/part, heat, lot or batch, serial and contract number. CDRL: CERTIFICATE OF COMPLIANCE per DI-MISC-82386; 4.7.2 ;The supplier shall perform visual and physical inspection 100% on each mold machined part (Item Numbers 2 thru 5, 7, 8, 10, 11, 13, 14, 16, 17, 19, 20, 30, 31and 32) of each dimension identified on the applicable drawing including threads. Threads shall be inspected 100% and results recorded. The supplier shall record the actual measurements and results of each dimension identified on the applicable drawing including threads, the applicable identification and markings required by Drawing 8603516. The inspection reports shall show all the characteristics, the actual measurements and results of each dimension inspected, including threads, identification and markings, contract number, name of supplier, drawing/part number, drawing revision letter, heat, lot or batch, serial number, item nomenclature, inspector's acceptance signature and date. CDRL: VISUAL/DIMENSIONAL INSPECTION REPORT per DI-NDTI-80809B; 4.7.3 ;AN/BRR-6 6W43/6W44 Mold Assembly Material Certification/Insp Report and Acceptance - (Supplier Certification/Inspection). The supplier shall submit material certification/inspection report in compliance with the applicable Data Item Descriptions (DIDs) and drawing 8603516. The 6W43/6W44 Mold Assembly Material Certification/Inspection Report shall consist of ;Certificate of Compliance for Material and Visual/Dimensional Inspection Report; identified in the above respective paragraphs of this document, and as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the mold assembly material certification/inspection report is required prior to commencement of first article unit. CDRL: AN/BRR-6 6W43/6W44 MOLD ASSEMBLY CERTIFICATION MATERIAL/INSPECTION REPORT per DI-NDTI-80809B; 4.8 ;First Article Testing/Inspection - (Supplier Testing/Inspection). The supplier shall perform first article testing/inspection on ;AN/BRR-6 Cable Assembly Outboard Harness (6W43/6W44); in accordance with the applicable drawings and specifications, NAVSEA manuals S9320-AM-PRO-030/MLDG and S9320-AM-PRO-020/MLDG, and their approved first article procedure.; 4.8.1 ;The first article inspection shall be made by the cognizant DCMA-QAR at the supplier's and/or subcontractor facility. The supplier shall notify NSWCPD, Code 242MO two weeks in advance prior to the scheduled first article testing/inspection, so an NSWCPD representative has the option of being present during the first article testing/inspection.; 4.9 ;First Article Approval for Testing/Inspection Procedure and Acceptance - (Supplier Testing/Inspection). The supplier shall prepare and submit their First Article Testing/ Inspection Procedure for ;AN/BRR-6 Cable Assembly Outboard Harness (6W43/6W44); in accordance with the requirements of DI-NDTI-80603, the applicable drawings, specifications, NAVSEA manuals S9320--AM-PRO-030/MLDG and S9320-AM-PRO-020/MLDG, and as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the procedure is required prior to commencement of first article unit. CDRL: FIRST ARTICLE TESTING/INSPECTION PROCEDURE per DI-NDTI-80603A; 4.10 ;First Article Testing/Inspection - The supplier shall perform 100% examination, inspection and testing on the completed first article ;AN/BRR-6 Cable Assembly Outboard Harness (6W43/6W44); unit (bulk cable/component parts/assembly) in accordance with the applicable drawings, NAVSEA manuals S9320-AM-PRO-020/MLDG and S9320-AM-PRO-030/MLDG, and their approved first article procedure. The supplier shall record the actual measurements and results of each examination, inspection and test in NAVSEA S9320-AM-PR0-020/MLDG and S9320-AM-PRO-030/MLDG, and each dimension identified on the applicable drawings.; 4.10.1 ;The supplier shall visually inspect and perform electrical continuity and dc insulation resistance testing 100% on the ;Bulk Cable; in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.10.2 ;The supplier shall visually and physically inspect 100% the connectors (Item Nos.4,7 and 10 of drawing 8590863) in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.10.3 ;The supplier shall verify and inspect 100% the connectors metal plug body (Item No. 4 drawing 8590863) surface has been prepared and plasma coated in accordance with NAVSEA S9320-AM-PRO-030/MLDG requirements.; 4.10.4 ;The supplier shall visually and physically inspect 100% the completed ;Cable Assembly; of each dimension and keyway location/position identified on Drawing 8590863 including the identification and markings required by Notes 7 and 8 of the drawing.; 4.10.5 ;The supplier shall visually inspect 100% the molded plug connectors on the completed ;Cable Assembly; in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.10.6 ;The supplier shall perform 100% electrical continuity test on the completed ;Cable Assembly; in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.10.7 ;The supplier shall perform 100% insulation resistance test on the completed ;Cable Assembly; in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.10.8 ;The supplier shall perform 100% nondestructive bonding test on molded plug connectors on the completed ;Cable Assembly; in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.10.9 ;The supplier shall perform 100% hydrostatic pressure test on the completed ;Cable Assembly; including insulation resistance testing in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.11 ;First Article Testing/Inspection Reports and Acceptance - (Supplier Testing/Inspection). The supplier shall submit for completed first article unit ;AN/BRR-6 Cable Assembly Outboard Harness (6W43/6W44); testing/inspection reports in compliance with the requirements of DI-NDTI-80603, the applicable drawings and specifications, NAVSEA manuals S9320-AM-PRO-020/MLDG and S9320-AM-PRO-030/MLDG. The report shall also include a copy of ;Bulk Cable Inspection/Test Report (Types 2SWF-7, 2SWF-3/MIL-DTL-915/48 and DSS-2/MIL-DTL-915/8, Item Nos. 5, 8 & 11 of dwg. 8590863); Certificate of Conformance for Materials (Dwg. 8590863, Item Nos. 4, 7, 10, 16 & 19) Plasma Coating, O-Rings, Polyurethane Molding COmpound, Back Fill and Primer); Certificate of Compliance for Materials (Dwg. 8590863, Item Nos. 14, 15, 17, 20, 21, 23 & 24), Connectors and Polychloroprene Material per MIL-DTL-915; Bulk Cable Inspection/Tesst Report per NAVSEA S9320-AM-PRO-020/MLDG; identified in the Objective Quality Evidence Records Section of this document, and as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the first article testing/inspection report is required prior to commencement of production units. CDRL: FIRST ARTICLE TESTING/INSPECTION REPORT per DI-NDTI-80809B; 4.12 ;Production Lot. ; 4.13 ;Bulk Cable - The supplier shall perform 100% examination, inspection and testing on the production lot (Bulk Cable, Types 2SWF-7, 2SWF-3 and DSS-2, Item Nos. 5, 8 & 11 of dwg. 8590863) in accordance with the applicable requirements listed in specification MIL-DTL-915/48 and MIL-DTL-915/8 (Quality Conformance Inspection) Basic Electrical, Groups A, B and C. The supplier shall record the actual measurements and results of each examination, inspection and test specified in the applicable specification.; 4.14 ;AN/BRR-6 Cable Assembly Outboard Harness. The supplier shall perform 100% examination, inspection and testing on each completed production lot unit (bulk cable/component parts/ assemblies) in accordance with the applicable drawings, NAVSEA manuals S9320-AM-PRO-020/MLDG and S9320-AM-PRO-030/MLDG. The supplier shall record the actual measurements and results of each examination, inspection and test in NAVSEA S9320-AM-PRO-020/MLDG and S9320-AM-PRO-030/MLDG and each dimension identified on the applicable drawings.; 4.14.1 ;The supplier shall visually inspect and perform electrical continuity and dc insulation resistance testing 100% on the ;Bulk Cable; in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.14.2 ;The supplier shall visually and physically inspect 100% each connector (Item Nos. 4, 7 and 10 of drawing 8590863) in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.14.3 ;The supplier shall verify and inspect 100% each connector metal plug body (Item No. 4 drawing 8590863) surface has been prepared and plasma coated in accordance with NAVSEA S9320-AM-PRO-030/MLDG requirements.; 4.14.4 ;The supplier shall visually and physically inspect 100% each completed ;Cable Assembly; of each dimension and keyway location/position identified on Drawing 8590863 including the identification and markings required by Notes 7 and 8 of the drawing.; 4.14.5 ;The supplier shall visually inspect 100% the molded plug connectors on each completed ;Cable Assembly; in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.14.6 ; The supplier shall perform 100% electrical continuity test on each completed ;Cable Assembly; in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.14.7 ;The supplier shall perform 100% insulation resistance test on each completed ;Cable Assembly; in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.14.8 ;The supplier shall perform 100% nondestructive bonding test on molded plug connectors on each completed ;Cable Assembly; in accordance with NAVSEA S9320-AM-PRO-020/ MLDG requirements.; 4.14.9 ;The supplier shall perform 100% hydrostatic pressure test on each completed ;Cable Assembly; including insulation resistance testing in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.14.10 ;The supplier shall conduct pre-shipment inspection and verification of connector O-Ring's (Item Nos. 17, 23 and 24) are individually packed and shipped with unit in accordance with Note 2 of Drawing 8590863 and NAVSEA S9320-AM-PRO-020/MLDG. ; 4.15 ;Production Lot Testing/Inspection Report and Acceptance - (Supplier Testing/Inspection). The supplier shall submit for the completed production units ;AN/BRR-6 Cable Assembly Outboard Harness (6W43/6W44); testing/inspection reports in compliance with the applicable Data Itme Descriptions (DIDs), drawings and specifications, NAVSEA manuals S9320-AM-PRO-020/MLDG and S9320-AM-PRO-030/MLDG. The Production Lot Testing/Inspection report shall consist of ;Bulk Cable Inspection/Test Report (Types 2SWF-7, 2SWF-3/MIL-DTL-915/48 and DSS-2/MIL-DTL-915/8, Item Nos. 5, 8 & 11 of dwg. 8590863); Certificate of Conformance for Materials (Dwg. 8590863, Item Nos. 4, 7, 10, 16 & 19), Plasma Coating, O-Rings, Polyurethane Molding Compound, Back Fill and Primer); Certificate of Compliance for Materials (Dwg. 8590863, Item Nos. 14, 15, 17, 20, 21, 23 & 24), Connectors and Polychloroprene Material per MIl-DTL-915; Bulk Cable Inspection/Test Report NAVSEA S9320-AM-PRO-020/MLDG; 6W43/6W44 Cable Assembly Outboard Harness Inspection/Test Report and Mercury Exclusion Certification; identified in the Objective Quality Evidence Records Section of this document, and as indicated on the Production Lot Test/Inspection (PLT) Contract Data Requirements List (DD Form 1423). Government approval of the production lot testing/inspection report is required prior to shipment of production lot units. CDRL: PRODUCITON LOT TESTING/INSPECTION REPORT per DI-NDTI-80809B; 4.16 ;Production Lot Inspection/Acceptance - (Supplier Testing/Inspection). The supplier shall submit for the production lot units, the inspection and test reports identified in the Objective Quality Evidence Records Section of this document and as indicated on the Production Lot Testing/Inspection (PLT) Contract Data Requirements List (DD Form 1423). Government approval is required prior to shipment of production units.; 4.17 ;Final Inspection and Acceptance - Final inspection and acceptance of production lots shall be made by the cognizant DCMA-QAR in conjuction with the Specific Government Inspection Instructions (SGIIs) furnished by NSWCPD. In addition to the normal DCMA surveillance, the production unit(s) shall be under the surveillance of NSWCPD Quality Assurance Specialist as required.; 4.18 ;Objective Quality Evidence Records - The supplier shall maintain Objective Quality Evidence Data (OQEDs) of materials used in the fabrication of the ;AN/BRR-6 Cable Assembly Outboard Harness (6W43/6W44);. Records shall be traceable by drawing/item, bulk cable master reel, heat, lot or batch, serial and contract number. All OQEDS shall be clearly legible including name and title. The supplier may provide exact (quality) photocopies of objective quality evidence records being delivered under this purchase order instead of originals.; 4.18.1 ;The supplier shall furnish a copy of the following OQEDs listed below and as indicated on the Contract Data Requirements List (DD Form 1423) for acceptance. The reports shall be correlated to the drawing/item, heat, lot or batch, contract and assembly serial number. Supplier format is acceptable for the below listed CDRLs: a. The supplier shall submit production Bulk Cable (Bulk Cable, Types 2SWF-7, 2SWF-3 and DSS-2, Item Nos. 5, 8 & 11 of dwg. 8590863) Examination, Inspection and Test Reports in accordance with the applicable requirements listed in specification MIL-DTL-915/48 and MIL-DTL-915/8 (Quality Conformance Inspection) Basic Electrical, Groups A, B and C. The reports shall show all the characteristics, the actual measurement and results of each examination, inspection and testing units tested including contract number, name of supplier, specification number/date, bulk cable master reel, manufacturer part, test start and stop times, gauge serial number, guage calibrated date/due date of finished bulk cable, item nomenclature and inspector's acceptance signature and date. CDRL: PRODUCTON LOT (BULK CABLE) REPORT per DI-NDTI-80809B b. Certificate of Conformance for: (1) Connectors (certifying Item Nos. 4, 7 and 10 to drawing 8590863 and applicable manufacture part numbers requirements). (2) Materials (certifying Item Nos. 16 & 19 material to drawing 8590863 and the applicable specification requirements). (3) Plasma Coat (certifying drawing 8590863, Item No. 4 have been plasma coated per drawing and NAVSEA S9320-AM-PRO-030/MLDG requirements). (4) Back Fill Material and Primer per NAVSEA S9320-AM-PRO-020/MLDG (certifying material and type has not exceeded the shelf life recommended by the manufacturer). CDRL: CERTIFICATE OF CONFORMANCE per DI-MISC-82386 c. Certificate of Compliance for: (1) Materials (certifying Item Nos. 14, 15 & 20 to drawing 8590863 and the applicable manufacturer part number requirements). (2) O-Ring (certifying Item Nos. 17, 23, & 24 material to drawing 8590863 and the applicable specification requirements). (3) Polyurethane Molding Compound Material Type II, Color Amber, Item #21 of drawing 8590863 (certifying material, type and color has not exceeded the shelf life recommended by the manfacturer as required by MIL-M-24041). (4) Polychloroprene Material (certifying material to drawing 8590854 and MIL-DTL-915 requirements). CDRL: CERTIFICATE OF COMPLIANCE per DI-MISC-82386 d. The supplier shall submit production Bulk Cable (Bulk Cable for Drawing 8590863, Item Nos. 5/Ty 2SWF-7, 8/Ty 2SWF-3 and 11Ty DSS-2) Examination, Inspection and Test Reports (consisting of Visual Inspection, Electrical Continuity Test, and Insulation Resistatnce Test in accordance with NAVSEA Manual S9320-AM-PRO-020/MLDG, Appendix II D Data Sheets DS1, DS2 and DS3. The reports shall also include the contract number, name of the supplier, drawing/item number, drawing revision letter, specification number/date, bulk cable master reel, item nomenclature and inspector's acceptance signature and date. CDRL: BULK CABLE (NAVSEA S9320-AM-PRO-020/MLDG) INSPECTION/TEST REPORT per DI-NDTI-80809B e. The supplier shall submit Production Lot (6W43/6W44 Cable Assembly Outboard Harness) Examination, Inspection and Testing Reports (consisting of Visual Inspection of molded connectors, Electrical Continuity Test, Insulation Resistance Test, Nondestructive and Destructive Bonding Test on Molded connectors, Hydrostatic Pressure Test and Pre-Shipment Inspection/Verification (Item Nos. 17, 23 and 24 of drawing 8590863) in accordance with NAVSEA Manual S9320-AM-PRO-020/MLDG, Appendix II D Data Sheets DS4 thru DS9. The reports shall also include cable assembly dimensional inspection (drawing 8590863), contract number, name of supplier, drawing/item number, drawing revision letter, cable assembly serial, item nomenclature and inspector's acceptance signature and date. CDRL: 6W43/6W44 CABLE ASSEMBLY OUTBOARD HARNESS (NAVSEA S9320-AM-PRO-020/MLDG) INSPECTION/TEST REPORT per DI-NDTI-80809B f. Mercury Exclusion Certification (representing the contract units shipment). CDRL: MERCURY EXCLUSION CERTIFICATION per DI-MISC-82386; 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. A. Availability of Cancelled Documents - The DODSSP offers cancelled documents that are required by private industry in fulfillment of contractual obligations in paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. They may be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government Contract Number, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVICP-MECH Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered from: Commanding Officer NAVICP-MECH Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Naval Inventory Control Point Code 1 Support Branch 700 Robbins Avenue Phildelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications shall be obtained by submitting a request on DD Form 1425 to NAVICP-MECH.
REMARKS APPLY TO ITEM 0001 The option provision is included in the event the Government has an additional requirement 365 days after issuance of the award. This will authorize the Government to add the additional quantity, up to the percentage cited, to the order, via modification without having tore-solicit. It is requested that pricing be submitted on the option provision. Evaluation for the award of the proposed requirement will be based upon the lowest aggregate total price submitted for the total quantity, inclusive of the option provision. \
Description
SUBMISSION DATES APPLY TO DID ITEM NR A001 DATE OF FIRST SUBMISSION=ASREQ
REMARKS APPLY TO DID ITEM NR A001 ;;APPROVAL OF THE QUALITY INSPECTION PLAN BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO FIRST ARTICLE.;; ;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A001. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;;
Description
SUBMISSION DATES APPLY TO DID ITEM NR A002 DATE OF FIRST SUBMISSION=ASREQ
REMARKS APPLY TO DID ITEM NR A002 ;;APPROVAL OF THE PROCEDURE BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO COMMENCEMENT OF FIRST ARTICLE UNIT.;; ;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A002. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;;
Description
SUBMISSION DATES APPLY TO DID ITEM NR A003 DATE OF FIRST SUBMISSION=ASREQ
REMARKS APPLY TO DID ITEM NR A003 ;;APPROVAL OF THE REPORT BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO COMMENCEMENT OF PRODUCTION LOT UNITS.;; ;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A003. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;;
Description
SUBMISSION DATES APPLY TO DID ITEM NR A004 DATE OF FIRST SUBMISSION=ASREQ
REMARKS APPLY TO DID ITEM NR A004 ;;SUPPLIER FORMAT IS ACCEPTABLE.;; ;;THE REPORT SHALL CONSIST OF OQED RECORDS LISTED IN CONTRACT SECTION E UNDER BRR-6 6W43/6W44 MOLD ASSEMBLY (DWG 8603516) MATERIAL/INSPECTION REQUIREMENTS: CERTIFICATE OF COMPLIANCE MATERIALS AND VISUAL/DIMENSIONAL INSPECTION REPORT.;; ;;APPROVAL OF THE REPORT BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO COMMENCEMENT OF FIRST ARTICLE.;; ;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A004. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;;
Description
SUBMISSION DATES APPLY TO DID ITEM NR A005 DATE OF FIRST SUBMISSION=ASREQ
REMARKS APPLY TO DID ITEM NR A005 ;;SUPPLIER FORMAT IS ACCEPTABLE.;; ;;PLT REPORT SHALL CONSIST OF OQED RECORDS LISTED IN CONTRACT SECTION E: BULK CABLE EXAM/INSP/TEST RPT (DWG. ITEM NOS. 5, 8 & 11); CERTIFICATE OF CONFORMANCE; CERTFICATE OF COMPLIANCE; BULK CABLE INSP/TEST REPORT PER NAVSEA S9320-AM-PRO-020/MLDG; CABLE ASSEMBLY OUTBOARD HARNESS INSPECTION/TEST REPORT PER NAVSEA S9320-AM-PRO-020/MLDG AND MERCURY EXCLUSION CERTIFICATE.;; ;;APPROVAL OF THE REPORT BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO SHIPMENT OF PRODUCTION LOT UNITS.;; ;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A005. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;;

More opportunities from Department Of The Navy → Navsup Weapon Systems Support Mech

Same awarding agency

NAICS: 332999
New
DIBBS
MEMBRANE SKID ASSY — 9999LLCYC4130 — N0010427QSA30
Solicitation # N0010427QSA30
This fixed-price solicitation, issued by NAVSUP Weapon Systems Support, is for the manufacture and delivery of one Membrane Skid Assy (NIIN LLCYC4130) to the USS Tripoli LHA 7. The item must be produced according to the design represented by Cage Code 35076 and reference number 741477. The procurement includes an option for an additional quantity of up to 100% of the primary item. Award will be made to a single, responsible offeror based on the most advantageous terms, with past performance weighted as more important than price. The government will utilize the DoD Supplier Performance Risk System (SPRS) to evaluate item, price, and supplier risk. Contractors are required to be authorized distributors of the original manufacturer and must adhere to strict quality and packaging standards, including MIL-STD-130 for marking and MIL-STD-2073 for preservation and packaging. Government source inspection is required, and final acceptance will be performed by the consignee at the destination. All invoicing and payment requests must be processed through the Wide Area Workflow (WAWF) system. The solicitation incorporates various FAR and DFARS clauses, including requirements for safeguarding covered defense information, Buy American compliance, and the identification of hazardous materials.
All Other Miscellaneous Fabricated Metal Product Manufacturing

POSTED

5 days ago

DEADLINE

in 11 days
View Details
NAICS: 811310
New
DIBBS
VALVE,LINEAR,DIRECT — 4820012161594 — N0010426QFG74
Solicitation # N0010426QFG74
This contract is a solicitation for the teardown, evaluation, and repair of a Linear Direct Valve (NSN 4820-01-216-1594). The material is designated as Special Emphasis material (Level I), as it is used in a crucial shipboard system where failure could result in serious personnel injury, loss of life, or loss of the ship. The scope of work involves a comprehensive refurbishment process, including inspection, recording of identifying markings, and the replacement of non-useable or improperly marked parts. Specific requirements include quantitative chemical and mechanical analysis for components such as the body, union adapter, and spool, as well as mandatory Dye Penetrant Inspection and pressure testing in accordance with MIL-V-24232. The government intends to make a single award based on a determination of the most advantageous offer, with past performance weighted as more important than price. Delivery is required within 614 days of the contract effective date, and all certification data must be submitted via Wide Area WorkFlow (WAWF) at least 20 days prior to delivery. Quality assurance is stringent, requiring 100% inspection of material verification, traceability markings, and certification test reports, with lot acceptance based on zero defects. There is no specified set-aside status for this solicitation.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

5 days ago

DEADLINE

in 29 days
View Details
NAICS: 334513
New
DIBBS
GAGE,DP,4.5 IN,0-30 — 6685015989382 — N0010427QBD24
Solicitation # N0010427QBD24
Solicitation N00104-27-Q-BD24 is a fixed-price procurement issued by the Naval Supply Systems Command Weapon Systems Support (NAVSUP WSS) for the acquisition of 34 units of GAGE, DP, 4.5 IN, 0-30 (NSN 6685-01-598-9382). The order is split between two delivery locations, with 17 units each destined for W25G1U and W62G2T. Award will be granted to the responsible offeror who provides the lowest priced, technically acceptable offer, with technical acceptability defined as the absence of exceptions or objections to the solicitation terms. The Contracting Officer will utilize the Supplier Performance Risk System (SPRS) to evaluate item, price, and supplier risks during the award process. The contractor is responsible for maintaining a government-approved inspection system, with inspection and acceptance occurring at the origin. Key technical requirements include compliance with the Individual Repair Part Ordering Data (IRPOD) and the submission of a complete Report of Test Inspection (ROTI) package per DI-QCIC-8872. Packaging must adhere to MIL-STD-2073 and MIL-STD-129, with specific requirements for CONUS and OCONUS shipments. The contract mandates the exclusion of mercury and requires strict adherence to cybersecurity standards under clause 252.204-7012. Payment will be processed electronically via the Wide Area Workflow (WAWF) system.
Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables

POSTED

5 days ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS