Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

WIRING HARNESS — 5995016734352 — N0010427QYA19

Active
N0010427QYA19

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Solicitation N0010427QYA19 is a fixed-price procurement issued by the Navsup Weapon Systems Support Mech for the manufacture of AN/BRR-6 Cable Assembly Outboard Harnesses (6W43/6W44) for use on Navy submarines. The scope includes the fabrication of the harness and associated mold assemblies in strict accordance with drawings 8590863, 8590854, and 8603516, as well as NAVSEA manuals S9320-AM-PRO-020/MLDG and S9320-AM-PRO-030/MLDG. A critical requirement of this contract is the total exclusion of metallic mercury to prevent corrosion of vital submarine components. The government has included an option provision allowing for an increase in quantity within 365 days of the award. The contract mandates a rigorous quality assurance program, requiring vendors to be qualified per NAVSEA audit requirements and to maintain inspection systems compliant with ISO 9001, MIL-I-45208, or ISO/IEC 17025. Key deliverables include a government-approved Quality Inspection and Test Plan, first article testing and inspection reports, and comprehensive production lot reports. Mandatory testing for the assemblies includes electrical continuity, dc insulation resistance, nondestructive bonding, and hydrostatic pressure tests. Award evaluation will prioritize past performance over price, utilizing the DoD Supplier Performance Risk System (SPRS) to assess item, price, and supplier risk. Final acceptance is conducted at the origin by the cognizant DCMA-QAR in coordination with the Naval Surface Warfare Center Philadelphia Division.

General Info

Fixed-price contract for manufacturing mercury-free cable assembly outboard harnesses for Navy submarines.

Documents

1

RFQ NO0014-27-Q-YA19 - Wiring Harness

PDF, High priority: read this first54 pages · rfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navsup Weapon Systems Support Mech
ContactsNo contacts available
OfficeMECHANICSBURG, PA, 17050-2411, USA
Office AddressMECHANICSBURG, PA, 17050-2411, USA
ContactsNo contact information available

Full Description

Show more
OPTION
Description
TDP VERSION NUMBER 003 1. SCOPE 1.1 ;This procurement specification contains the requirements for manufacture and the contract quality requirements for ;AN/BRR-6 Cable Assembly Outboard Harness (6W43/6W44); for use on Navy submarines.; 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.1.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.1.3 The "Document Changes" section provides supersessions/changes to referenced documents. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DRAWING DATA=8590854 |53711| -| |D| 0001 | -|-4999|8008004 DRAWING DATA=8590863 |53711| D| |D| 0001 | D|D4999|8030909 DRAWING DATA=8603516 |53711| -| |D| 0001 | -|-4999|8064513 DOCUMENT REF DATA=MIL-STD-130 | | |N |121116|A| | | DOCUMENT REF DATA=MIL-DTL-915 | | |G |020822|A| | | DOCUMENT REF DATA=MIL-DTL-915 | |08|H |020822|A| | | DOCUMENT REF DATA=MIL-DTL-915 | |48|D |020822|A| | | DOCUMENT REF DATA=MIL-STD-973 | | | |950113|A| |03| DOCUMENT REF DATA=ISO9001 | | | |240201|A|1 | | DOCUMENT REF DATA=ISO 10012 | | | |030415|A| | | DOCUMENT REF DATA=MIL-M-24041 | | |C |881220|A| | | DOCUMENT REF DATA=MIL-I-24768 |0027| | |920225|A| | | DOCUMENT REF DATA=SAE-AMS2817G | | | |161101|A| | | DOCUMENT REF DATA=MIL-I-45208A | | | |810724|A|1 | | DOCUMENT REF DATA=MS51844E | | | |121203|A| | | DOCUMENT REF DATA=EIA-649C - 2/19 | | | | |A| | | DOCUMENT REF DATA=ISO/IEC 17025 - 11/17 | | | | |A| | | DOCUMENT REF DATA=SAE-AS28775A - 12/08 | | | | |A| | | DOCUMENT REF DATA=S9320-AM-PRO-020 | | |03 |250716|A| | | DOCUMENT REF DATA=S9320-AM-PRO-030-02/2005 | | |03 | |A| | | DOCUMENT CHANGE DATA=MS28775E |SAE-AS28775A 3. REQUIREMENTS 3.1 ;Design and Manufacturing - The ;AN/BRR-6 Cable Assembly Outboard Harness (6W43/6W44); furnished under this contract/purchase order shall meet the material, electrical, mechanical, physical and test requirements as specified on Drawings 8590863 (consisting of Item Numbers 1 thru 21, 23 and 24), 8590854 and 8603516, NAVSEA Manuals S9320-AM-PRO-030/MLDG and S9320-AM-PRO-020/MLDG and including associated specifications mentioned in this procurement. ; 3.1.1 ;The AN/BRR-6 6W43/6W44 Mold Assembly shall be manufactured per the guidance of Drawing 8603516 (consisting of Item Numbers 1 thru 32) as required by Drawing 8590863.; 3.1.2 ;The connector metal plug body (Item No. 4 of drawing 8590863) surface preparation, application and inspection of non-conductive coating (Plasma Coating) shall be in accordance with NAVSEA Manual S9320-AM-PRO-030/MLDG as specified on Drawing 8590854.; 3.1.3 ;The Polyurethane Molding Compound Type II, Color Amber shall be in accordance with MIL-M-24041 requirements as specified on Drawing 8590863.; 3.1.4 ;All outboard molded cable assemblies shall be manufactured and tested in accordance with NAVSEA Manual S9320-AM-PRO-020/MLDG requirements as specified on Drawings 8590863, Note 3 and 8590854, Note 4.; 3.2 ;Vendor Qualification. As required by Drawing 8590854:; 3.2.1 ;Only vendors which are qualified, per the audit requirements of NAVSEA Manual S9320-AM-PRO-020/MLDG Appendix II-A; and listed on the approved vendors lists in appendix II-A of NAVSEA Manual S9320-AM-PRO-020/MLDG, shall be authorized to fabricate submarine outboard cable assemblies. ; 3.2.2 ;Metal plug bodies surface preparation is only by vendors which are qualified, per the audit requirements of NAVSEA Manual S9320-AM-PRO-030/MLDG Appendix III-H, and listed on the approved vendors lists in appendix III-I of NAVSEA Manual S9320-AM-PRO-030/MLDG, shall be authorized to fabricate non-conductive plasma sprayed ceramic coated submarine outboard connector metal plug bodies.; 3.3 ;Marking Requirements - The supplier shall permanently mark and identify each first article and production lot unit ;Cable Assembly Outboard Harness (6W43/6W44); in accordance with Notes 7 and 8 of Drawing 8590863 per MIL-STD-130. ;Per Note 4 of Drawing 8590863, the supplier shall contact Jason Krol, jason.a.krol2.civ@us.navy.mil of NSWC Philadelphia Division for component serial number information.;; 3.3.1 ;The supplier shall mark ;tag or bag; all piece parts with contract, drawing/ item, heat, lot or batch and serial number in accordance with MIL-STD-130 until installed in the designated assembly.; 3.4 ;First Article Testing/Inspection - (Supplier Testing/Inspection). The first article testing/inspection procedure and approval are required for ;Cable Assembly Outboard Harness (6W43/6W44);. Government approval is required prior to commencement of first article unit.; 3.5 ;Notification - The supplier shall notify Naval Surface Warfare Center, Philadelphia Division, (NSWCPD), 5001 S. Broad Street, Philadelphia, PA 19112-1403 by email matthew.j.ogilvie.civ@us.navy.mil, Code 242MO after award of contract.; 3.5.1 ;The NSWCPD is the acceptance activity for the Contract Data Requirements List (DD1423) Data Items. NSWCPD WAWF/IRAPT ;Acceptor; DODACC is ;N64498;.; 3.6 Configuration Control - MIL-STD-973 entitled "Configuration Management", Paragraph 5.4.8, Configuration Control (Short Form Procedure), is hereby incorporated. The Contractor shall submit all Engineering Change Proposals in accordance with MIL-STD-973, Paragraph 5.4.8.2 and Appendix D. Requests for Deviations shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.3 and Appendix E. Requests for Waivers shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.4 and Appendix E. (Original and two copies shall be submitted to Contracting Officer, NAVICP-MECH, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.) 3.6.1 Configuration Control - When the Contractor has received authorization on a prior contract for the same NSN for the use of a drawing of a later revision status, that authorization is hereby extended to all succeeding contracts/purchase orders until another drawing revision is approved. The Contractor will notify the PCO of this occurrence in each instance, in the response to the solicitation. Such notification shall be in writing setting forth the contract under which the prior authorization was granted, the date of the granting of the authorization, and the name of the granting authority. Contractors shall also refer technical inquiries (other than those covered by MIL-STD-973) on company letterhead signed by a responsible company official, with copies distributed as stated below. The original and two copies of all Contractor generated correspondence regarding configuration shall be submitted to Contracting Officer, NAVICP-MECH, P.O. Box 2020, Mechanicsburg, PA 17055-0788. Contractors are cautioned that implementing engineering changes, waivers, deviations or technical inquiries into the contract/purchase order without approval of the Contracting Officer will be at the sole risk of the Contractor. 3.7 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material will be cause for rejection. If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part. The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are located so as not to constitute a contamination hazard. If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the requirements of this contract are concerned. These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements. Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided: Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface ship atmosphere. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 4.4 ;Inspection System - The Supplier's Quality Inspection System shall be in accordance with MIL-I-45208 or ISO 9001 and ISO/IEC 17025 or ISO 10012. The supplier shall develop and submit their written Quality Inspection and Test Plan as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the supplier's written Quality Inspection and Test Plan is required by the contract. CDRL: QUALITY INSPECTION & TEST PLAN per MIL-I-45208, ISO/IEC 17025 and DI-QCIC-81110 ; 4.5 ;Finished Edges - Finished shall be in accordance with the applicable drawing requirements.; 4.6 ;Material Control - The supplier shall have an effective material control system that provides for the control of materials by heat, lot or batch as ordered for first article and production lot units. ; 4.7 ;AN/BRR-6 6W43/6W44 Mold Assembly Material/Insp (Dwg. 8603516) Prior to First Article; 4.7.1 ;The supplier shall provide mmaterial certification for 6W43/6W44 Mold Assembly, Item Numbers 2 thru 5, 7, 8, 10, 11, 13, 14, 16, 17, 19, 20, 30, 31 and 32 of the applicable drawing (certifying items to drawing and the applicable material requirements). Records shall be traceable by drawing/part, heat, lot or batch, serial and contract number. CDRL: CERTIFICATE OF COMPLIANCE per DI-MISC-82386; 4.7.2 ;The supplier shall perform visual and physical inspection 100% on each mold machined part (Item Numbers 2 thru 5, 7, 8, 10, 11, 13, 14, 16, 17, 19, 20, 30, 31and 32) of each dimension identified on the applicable drawing including threads. Threads shall be inspected 100% and results recorded. The supplier shall record the actual measurements and results of each dimension identified on the applicable drawing including threads, the applicable identification and markings required by Drawing 8603516. The inspection reports shall show all the characteristics, the actual measurements and results of each dimension inspected, including threads, identification and markings, contract number, name of supplier, drawing/part number, drawing revision letter, heat, lot or batch, serial number, item nomenclature, inspector's acceptance signature and date. CDRL: VISUAL/DIMENSIONAL INSPECTION REPORT per DI-NDTI-80809B; 4.7.3 ;AN/BRR-6 6W43/6W44 Mold Assembly Material Certification/Insp Report and Acceptance - (Supplier Certification/Inspection). The supplier shall submit material certification/inspection report in compliance with the applicable Data Item Descriptions (DIDs) and drawing 8603516. The 6W43/6W44 Mold Assembly Material Certification/Inspection Report shall consist of ;Certificate of Compliance for Material and Visual/Dimensional Inspection Report; identified in the above respective paragraphs of this document, and as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the mold assembly material certification/inspection report is required prior to commencement of first article unit. CDRL: AN/BRR-6 6W43/6W44 MOLD ASSEMBLY CERTIFICATION MATERIAL/INSPECTION REPORT per DI-NDTI-80809B; 4.8 ;First Article Testing/Inspection - (Supplier Testing/Inspection). The supplier shall perform first article testing/inspection on ;AN/BRR-6 Cable Assembly Outboard Harness (6W43/6W44); in accordance with the applicable drawings and specifications, NAVSEA manuals S9320-AM-PRO-030/MLDG and S9320-AM-PRO-020/MLDG, and their approved first article procedure.; 4.8.1 ;The first article inspection shall be made by the cognizant DCMA-QAR at the supplier's and/or subcontractor facility. The supplier shall notify NSWCPD, Code 242MO two weeks in advance prior to the scheduled first article testing/inspection, so an NSWCPD representative has the option of being present during the first article testing/inspection.; 4.9 ;First Article Approval for Testing/Inspection Procedure and Acceptance - (Supplier Testing/Inspection). The supplier shall prepare and submit their First Article Testing/ Inspection Procedure for ;AN/BRR-6 Cable Assembly Outboard Harness (6W43/6W44); in accordance with the requirements of DI-NDTI-80603, the applicable drawings, specifications, NAVSEA manuals S9320--AM-PRO-030/MLDG and S9320-AM-PRO-020/MLDG, and as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the procedure is required prior to commencement of first article unit. CDRL: FIRST ARTICLE TESTING/INSPECTION PROCEDURE per DI-NDTI-80603A; 4.10 ;First Article Testing/Inspection - The supplier shall perform 100% examination, inspection and testing on the completed first article ;AN/BRR-6 Cable Assembly Outboard Harness (6W43/6W44); unit (bulk cable/component parts/assembly) in accordance with the applicable drawings, NAVSEA manuals S9320-AM-PRO-020/MLDG and S9320-AM-PRO-030/MLDG, and their approved first article procedure. The supplier shall record the actual measurements and results of each examination, inspection and test in NAVSEA S9320-AM-PR0-020/MLDG and S9320-AM-PRO-030/MLDG, and each dimension identified on the applicable drawings.; 4.10.1 ;The supplier shall visually inspect and perform electrical continuity and dc insulation resistance testing 100% on the ;Bulk Cable; in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.10.2 ;The supplier shall visually and physically inspect 100% the connectors (Item Nos.4,7 and 10 of drawing 8590863) in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.10.3 ;The supplier shall verify and inspect 100% the connectors metal plug body (Item No. 4 drawing 8590863) surface has been prepared and plasma coated in accordance with NAVSEA S9320-AM-PRO-030/MLDG requirements.; 4.10.4 ;The supplier shall visually and physically inspect 100% the completed ;Cable Assembly; of each dimension and keyway location/position identified on Drawing 8590863 including the identification and markings required by Notes 7 and 8 of the drawing.; 4.10.5 ;The supplier shall visually inspect 100% the molded plug connectors on the completed ;Cable Assembly; in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.10.6 ;The supplier shall perform 100% electrical continuity test on the completed ;Cable Assembly; in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.10.7 ;The supplier shall perform 100% insulation resistance test on the completed ;Cable Assembly; in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.10.8 ;The supplier shall perform 100% nondestructive bonding test on molded plug connectors on the completed ;Cable Assembly; in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.10.9 ;The supplier shall perform 100% hydrostatic pressure test on the completed ;Cable Assembly; including insulation resistance testing in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.11 ;First Article Testing/Inspection Reports and Acceptance - (Supplier Testing/Inspection). The supplier shall submit for completed first article unit ;AN/BRR-6 Cable Assembly Outboard Harness (6W43/6W44); testing/inspection reports in compliance with the requirements of DI-NDTI-80603, the applicable drawings and specifications, NAVSEA manuals S9320-AM-PRO-020/MLDG and S9320-AM-PRO-030/MLDG. The report shall also include a copy of ;Bulk Cable Inspection/Test Report (Types 2SWF-7, 2SWF-3/MIL-DTL-915/48 and DSS-2/MIL-DTL-915/8, Item Nos. 5, 8 & 11 of dwg. 8590863); Certificate of Conformance for Materials (Dwg. 8590863, Item Nos. 4, 7, 10, 16 & 19) Plasma Coating, O-Rings, Polyurethane Molding COmpound, Back Fill and Primer); Certificate of Compliance for Materials (Dwg. 8590863, Item Nos. 14, 15, 17, 20, 21, 23 & 24), Connectors and Polychloroprene Material per MIL-DTL-915; Bulk Cable Inspection/Tesst Report per NAVSEA S9320-AM-PRO-020/MLDG; identified in the Objective Quality Evidence Records Section of this document, and as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the first article testing/inspection report is required prior to commencement of production units. CDRL: FIRST ARTICLE TESTING/INSPECTION REPORT per DI-NDTI-80809B; 4.12 ;Production Lot. ; 4.13 ;Bulk Cable - The supplier shall perform 100% examination, inspection and testing on the production lot (Bulk Cable, Types 2SWF-7, 2SWF-3 and DSS-2, Item Nos. 5, 8 & 11 of dwg. 8590863) in accordance with the applicable requirements listed in specification MIL-DTL-915/48 and MIL-DTL-915/8 (Quality Conformance Inspection) Basic Electrical, Groups A, B and C. The supplier shall record the actual measurements and results of each examination, inspection and test specified in the applicable specification.; 4.14 ;AN/BRR-6 Cable Assembly Outboard Harness. The supplier shall perform 100% examination, inspection and testing on each completed production lot unit (bulk cable/component parts/ assemblies) in accordance with the applicable drawings, NAVSEA manuals S9320-AM-PRO-020/MLDG and S9320-AM-PRO-030/MLDG. The supplier shall record the actual measurements and results of each examination, inspection and test in NAVSEA S9320-AM-PRO-020/MLDG and S9320-AM-PRO-030/MLDG and each dimension identified on the applicable drawings.; 4.14.1 ;The supplier shall visually inspect and perform electrical continuity and dc insulation resistance testing 100% on the ;Bulk Cable; in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.14.2 ;The supplier shall visually and physically inspect 100% each connector (Item Nos. 4, 7 and 10 of drawing 8590863) in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.14.3 ;The supplier shall verify and inspect 100% each connector metal plug body (Item No. 4 drawing 8590863) surface has been prepared and plasma coated in accordance with NAVSEA S9320-AM-PRO-030/MLDG requirements.; 4.14.4 ;The supplier shall visually and physically inspect 100% each completed ;Cable Assembly; of each dimension and keyway location/position identified on Drawing 8590863 including the identification and markings required by Notes 7 and 8 of the drawing.; 4.14.5 ;The supplier shall visually inspect 100% the molded plug connectors on each completed ;Cable Assembly; in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.14.6 ; The supplier shall perform 100% electrical continuity test on each completed ;Cable Assembly; in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.14.7 ;The supplier shall perform 100% insulation resistance test on each completed ;Cable Assembly; in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.14.8 ;The supplier shall perform 100% nondestructive bonding test on molded plug connectors on each completed ;Cable Assembly; in accordance with NAVSEA S9320-AM-PRO-020/ MLDG requirements.; 4.14.9 ;The supplier shall perform 100% hydrostatic pressure test on each completed ;Cable Assembly; including insulation resistance testing in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.14.10 ;The supplier shall conduct pre-shipment inspection and verification of connector O-Ring's (Item Nos. 17, 23 and 24) are individually packed and shipped with unit in accordance with Note 2 of Drawing 8590863 and NAVSEA S9320-AM-PRO-020/MLDG. ; 4.15 ;Production Lot Testing/Inspection Report and Acceptance - (Supplier Testing/Inspection). The supplier shall submit for the completed production units ;AN/BRR-6 Cable Assembly Outboard Harness (6W43/6W44); testing/inspection reports in compliance with the applicable Data Itme Descriptions (DIDs), drawings and specifications, NAVSEA manuals S9320-AM-PRO-020/MLDG and S9320-AM-PRO-030/MLDG. The Production Lot Testing/Inspection report shall consist of ;Bulk Cable Inspection/Test Report (Types 2SWF-7, 2SWF-3/MIL-DTL-915/48 and DSS-2/MIL-DTL-915/8, Item Nos. 5, 8 & 11 of dwg. 8590863); Certificate of Conformance for Materials (Dwg. 8590863, Item Nos. 4, 7, 10, 16 & 19), Plasma Coating, O-Rings, Polyurethane Molding Compound, Back Fill and Primer); Certificate of Compliance for Materials (Dwg. 8590863, Item Nos. 14, 15, 17, 20, 21, 23 & 24), Connectors and Polychloroprene Material per MIl-DTL-915; Bulk Cable Inspection/Test Report NAVSEA S9320-AM-PRO-020/MLDG; 6W43/6W44 Cable Assembly Outboard Harness Inspection/Test Report and Mercury Exclusion Certification; identified in the Objective Quality Evidence Records Section of this document, and as indicated on the Production Lot Test/Inspection (PLT) Contract Data Requirements List (DD Form 1423). Government approval of the production lot testing/inspection report is required prior to shipment of production lot units. CDRL: PRODUCITON LOT TESTING/INSPECTION REPORT per DI-NDTI-80809B; 4.16 ;Production Lot Inspection/Acceptance - (Supplier Testing/Inspection). The supplier shall submit for the production lot units, the inspection and test reports identified in the Objective Quality Evidence Records Section of this document and as indicated on the Production Lot Testing/Inspection (PLT) Contract Data Requirements List (DD Form 1423). Government approval is required prior to shipment of production units.; 4.17 ;Final Inspection and Acceptance - Final inspection and acceptance of production lots shall be made by the cognizant DCMA-QAR in conjuction with the Specific Government Inspection Instructions (SGIIs) furnished by NSWCPD. In addition to the normal DCMA surveillance, the production unit(s) shall be under the surveillance of NSWCPD Quality Assurance Specialist as required.; 4.18 ;Objective Quality Evidence Records - The supplier shall maintain Objective Quality Evidence Data (OQEDs) of materials used in the fabrication of the ;AN/BRR-6 Cable Assembly Outboard Harness (6W43/6W44);. Records shall be traceable by drawing/item, bulk cable master reel, heat, lot or batch, serial and contract number. All OQEDS shall be clearly legible including name and title. The supplier may provide exact (quality) photocopies of objective quality evidence records being delivered under this purchase order instead of originals.; 4.18.1 ;The supplier shall furnish a copy of the following OQEDs listed below and as indicated on the Contract Data Requirements List (DD Form 1423) for acceptance. The reports shall be correlated to the drawing/item, heat, lot or batch, contract and assembly serial number. Supplier format is acceptable for the below listed CDRLs: a. The supplier shall submit production Bulk Cable (Bulk Cable, Types 2SWF-7, 2SWF-3 and DSS-2, Item Nos. 5, 8 & 11 of dwg. 8590863) Examination, Inspection and Test Reports in accordance with the applicable requirements listed in specification MIL-DTL-915/48 and MIL-DTL-915/8 (Quality Conformance Inspection) Basic Electrical, Groups A, B and C. The reports shall show all the characteristics, the actual measurement and results of each examination, inspection and testing units tested including contract number, name of supplier, specification number/date, bulk cable master reel, manufacturer part, test start and stop times, gauge serial number, guage calibrated date/due date of finished bulk cable, item nomenclature and inspector's acceptance signature and date. CDRL: PRODUCTON LOT (BULK CABLE) REPORT per DI-NDTI-80809B b. Certificate of Conformance for: (1) Connectors (certifying Item Nos. 4, 7 and 10 to drawing 8590863 and applicable manufacture part numbers requirements). (2) Materials (certifying Item Nos. 16 & 19 material to drawing 8590863 and the applicable specification requirements). (3) Plasma Coat (certifying drawing 8590863, Item No. 4 have been plasma coated per drawing and NAVSEA S9320-AM-PRO-030/MLDG requirements). (4) Back Fill Material and Primer per NAVSEA S9320-AM-PRO-020/MLDG (certifying material and type has not exceeded the shelf life recommended by the manufacturer). CDRL: CERTIFICATE OF CONFORMANCE per DI-MISC-82386 c. Certificate of Compliance for: (1) Materials (certifying Item Nos. 14, 15 & 20 to drawing 8590863 and the applicable manufacturer part number requirements). (2) O-Ring (certifying Item Nos. 17, 23, & 24 material to drawing 8590863 and the applicable specification requirements). (3) Polyurethane Molding Compound Material Type II, Color Amber, Item #21 of drawing 8590863 (certifying material, type and color has not exceeded the shelf life recommended by the manfacturer as required by MIL-M-24041). (4) Polychloroprene Material (certifying material to drawing 8590854 and MIL-DTL-915 requirements). CDRL: CERTIFICATE OF COMPLIANCE per DI-MISC-82386 d. The supplier shall submit production Bulk Cable (Bulk Cable for Drawing 8590863, Item Nos. 5/Ty 2SWF-7, 8/Ty 2SWF-3 and 11Ty DSS-2) Examination, Inspection and Test Reports (consisting of Visual Inspection, Electrical Continuity Test, and Insulation Resistatnce Test in accordance with NAVSEA Manual S9320-AM-PRO-020/MLDG, Appendix II D Data Sheets DS1, DS2 and DS3. The reports shall also include the contract number, name of the supplier, drawing/item number, drawing revision letter, specification number/date, bulk cable master reel, item nomenclature and inspector's acceptance signature and date. CDRL: BULK CABLE (NAVSEA S9320-AM-PRO-020/MLDG) INSPECTION/TEST REPORT per DI-NDTI-80809B e. The supplier shall submit Production Lot (6W43/6W44 Cable Assembly Outboard Harness) Examination, Inspection and Testing Reports (consisting of Visual Inspection of molded connectors, Electrical Continuity Test, Insulation Resistance Test, Nondestructive and Destructive Bonding Test on Molded connectors, Hydrostatic Pressure Test and Pre-Shipment Inspection/Verification (Item Nos. 17, 23 and 24 of drawing 8590863) in accordance with NAVSEA Manual S9320-AM-PRO-020/MLDG, Appendix II D Data Sheets DS4 thru DS9. The reports shall also include cable assembly dimensional inspection (drawing 8590863), contract number, name of supplier, drawing/item number, drawing revision letter, cable assembly serial, item nomenclature and inspector's acceptance signature and date. CDRL: 6W43/6W44 CABLE ASSEMBLY OUTBOARD HARNESS (NAVSEA S9320-AM-PRO-020/MLDG) INSPECTION/TEST REPORT per DI-NDTI-80809B f. Mercury Exclusion Certification (representing the contract units shipment). CDRL: MERCURY EXCLUSION CERTIFICATION per DI-MISC-82386; 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. A. Availability of Cancelled Documents - The DODSSP offers cancelled documents that are required by private industry in fulfillment of contractual obligations in paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. They may be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government Contract Number, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVICP-MECH Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered from: Commanding Officer NAVICP-MECH Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Naval Inventory Control Point Code 1 Support Branch 700 Robbins Avenue Phildelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications shall be obtained by submitting a request on DD Form 1425 to NAVICP-MECH.
REMARKS APPLY TO ITEM 0001 The option provision is included in the event the Government has an additional requirement 365 days after issuance of the award. This will authorize the Government to add the additional quantity, up to the percentage cited, to the order, via modification without having tore-solicit. It is requested that pricing be submitted on the option provision. Evaluation for the award of the proposed requirement will be based upon the lowest aggregate total price submitted for the total quantity, inclusive of the option provision. \
Description
SUBMISSION DATES APPLY TO DID ITEM NR A001 DATE OF FIRST SUBMISSION=ASREQ
REMARKS APPLY TO DID ITEM NR A001 ;;APPROVAL OF THE QUALITY INSPECTION PLAN BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO FIRST ARTICLE.;; ;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A001. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;;
Description
SUBMISSION DATES APPLY TO DID ITEM NR A002 DATE OF FIRST SUBMISSION=ASREQ
REMARKS APPLY TO DID ITEM NR A002 ;;APPROVAL OF THE PROCEDURE BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO COMMENCEMENT OF FIRST ARTICLE UNIT.;; ;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A002. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;;
Description
SUBMISSION DATES APPLY TO DID ITEM NR A003 DATE OF FIRST SUBMISSION=ASREQ
REMARKS APPLY TO DID ITEM NR A003 ;;APPROVAL OF THE REPORT BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO COMMENCEMENT OF PRODUCTION LOT UNITS.;; ;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A003. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;;
Description
SUBMISSION DATES APPLY TO DID ITEM NR A004 DATE OF FIRST SUBMISSION=ASREQ
REMARKS APPLY TO DID ITEM NR A004 ;;SUPPLIER FORMAT IS ACCEPTABLE.;; ;;THE REPORT SHALL CONSIST OF OQED RECORDS LISTED IN CONTRACT SECTION E UNDER BRR-6 6W43/6W44 MOLD ASSEMBLY (DWG 8603516) MATERIAL/INSPECTION REQUIREMENTS: CERTIFICATE OF COMPLIANCE MATERIALS AND VISUAL/DIMENSIONAL INSPECTION REPORT.;; ;;APPROVAL OF THE REPORT BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO COMMENCEMENT OF FIRST ARTICLE.;; ;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A004. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;;
Description
SUBMISSION DATES APPLY TO DID ITEM NR A005 DATE OF FIRST SUBMISSION=ASREQ
REMARKS APPLY TO DID ITEM NR A005 ;;SUPPLIER FORMAT IS ACCEPTABLE.;; ;;PLT REPORT SHALL CONSIST OF OQED RECORDS LISTED IN CONTRACT SECTION E: BULK CABLE EXAM/INSP/TEST RPT (DWG. ITEM NOS. 5, 8 & 11); CERTIFICATE OF CONFORMANCE; CERTFICATE OF COMPLIANCE; BULK CABLE INSP/TEST REPORT PER NAVSEA S9320-AM-PRO-020/MLDG; CABLE ASSEMBLY OUTBOARD HARNESS INSPECTION/TEST REPORT PER NAVSEA S9320-AM-PRO-020/MLDG AND MERCURY EXCLUSION CERTIFICATE.;; ;;APPROVAL OF THE REPORT BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO SHIPMENT OF PRODUCTION LOT UNITS.;; ;;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A005. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;;

Similar Contracts

Same NAICS industry code

More opportunities from Department Of The Navy → Navsup Weapon Systems Support Mech

Same awarding agency

NAICS: 332999
New
ROD,WELDING — 3439015531625 — N0010427QBA79
Solicitation # N0010427QBA79
Solicitation NO00104-27-Q-BA79 is a fixed-price request for quotations issued by NAVSUP Weapon Systems Support Mechanicsburg for the procurement of welding rods under NSN 3439-01-553-1625. The contract requires delivery within 180 days on an FOB Destination basis. Award will be granted to the responsible offeror providing the lowest priced, technically acceptable offer, with a 10 percent price evaluation preference applied to eligible HUBZone small business concerns. Technical acceptability is contingent upon full compliance with Section L instructions and the terms of the solicitation without exception. The contractor must adhere to strict technical and quality standards, with mandatory review of the Individual Repair Part Ordering Data (IRPOD). Key deliverables include a procedure package of drawings and pre-manufacturing submittals due within 45 days of award, and a complete package of Vendor Certified Reports of Test and Inspection due by the end of the contract. Packaging must comply with MIL-STD-2073 and MIL-W-10430, with specific marking requirements including the item nomenclature and DLR labels. Quality assurance and inspection are conducted at the origin, and the contractor is required to maintain an inspection system acceptable to the Government. Administrative requirements include the use of the Wide Area Workflow system for invoicing and payment. The contract incorporates various FAR and DFARS clauses, including mandates for safeguarding covered defense information, prohibitions on hexavalent chromium and mercury, and requirements for submitting Safety Data Sheets for hazardous materials. Offerors must provide a completed Standard Form 33, the Schedule of Supplies, and SAM representations to be considered for award.
All Other Miscellaneous Fabricated Metal Product Manufacturing

POSTED

2 days ago

DEADLINE

in about 1 month
View Details
NAICS: 811310
New
FAN,VANEAXIAL — 4140016537856 — N0010427QTA06
Solicitation # N00104-27-Q-TA06
Solicitation N0010427QTA06, issued by the Department of the Navy's NAVSUP Weapon Systems Support Mechanicsburg, is a request for quotations for the teardown, evaluation, and repair of a Vaneaxial Fan (NIIN 016537856). The contract is a firm-fixed-price, not-to-exceed, or estimated price agreement requiring the awardee to be an authorized repair source. All work must adhere to the contractor's standard repair practices and original manufacturer specifications. A critical safety requirement mandates that all materials be mercury-free to prevent corrosion and toxicity on submarines and surface ships, with strict testing and approval protocols for any necessary exceptions. The contractor is responsible for all inspections at the point of origin, with records maintained for 365 days post-delivery. Packaging and marking must comply with MIL-STD-2073 and MIL-STD-129, with specific requirements for domestic and overseas shipping levels. Delivery is required within 30 days on an FOB Destination basis. Award evaluations will utilize the Supplier Performance Risk System to assess item, price, and supplier risk. Administrative requirements include electronic invoicing via Wide Area Workflow and compliance with DFARS standards for cybersecurity, safeguarding covered defense information, and the Buy American program.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

2 days ago

DEADLINE

in 13 days
View Details
NAICS: 811210
New
EXCITER CONTROL — 6110015778164 — N0010427QJA06
Solicitation # NO0014-27-Q-JA06
Solicitation NO0014-27-Q-JA06 is a firm-fixed-price request for quotations issued by the NAVSUP Weapon Systems Support Mech for the teardown, evaluation, repair, and modification of an Exciter Control, NSN 6110-01-577-8164. The scope requires that all repair work meet the operational and functional requirements of CAGE Code 97520 and Reference Number 9388800-102, adhering to the contractor's standard overhaul practices and original manufacturer specifications. The government mandates a Repair Turnaround Time of 140 days, with delivery measured from the date of asset return as recorded in the Commercial Asset Visibility system. The order covers an induction period of one year and includes an option for increased quantity up to 100 percent of the base item. Contractors are responsible for all inspection and testing, though the government reserves the right to perform oversight and requires Government Source Inspection. Quality assurance records must be maintained for 365 days following final delivery. Physical identification must comply with MIL-STD-130, and packaging must adhere to MIL-STD-2073 and MIL-STD-129, with specific requirements for electrostatic discharge protection and unique item identification. Award evaluation will be based on the Supplier Performance Risk System, assessing item, price, and supplier risk. Administrative requirements include electronic invoicing via Wide Area Workflow and strict compliance with cybersecurity and safeguarding controls for covered defense information.
Electronic and Precision Equipment Repair and Maintenance

POSTED

2 days ago

DEADLINE

in 5 days
View Details
NAICS: 334519
New
TRANSDUCER,MOTIONAL — 6695010878508 — N0010426QYAJV
Solicitation # N0010426QYAJV
This fixed-price solicitation, issued by the Navsup Weapon Systems Support Mech, seeks the manufacture and delivery of Motional Transducers (NSN 6695-01-087-8508) based on the design represented by Cage Code 02750. The requirement is processed under Emergency Acquisition Flexibilities and is DO certified for national defense under the Defense Priorities and Allocations System. The government retains an option to order an additional quantity of up to 100 percent of the original order for 365 days after receipt at the same price. Offerors who are not the Original Equipment Manufacturer must provide the OEM's company name, CAGE code, and a signed letter of authorization on OEM letterhead. Technical requirements strictly prohibit the use of metallic mercury or mercury contamination, as the items are intended for use on submarines and surface ships. Supplies must be physically identified per MIL-STD-130 and packaged according to MIL-STD-2073, with specific marking requirements for Depot Level Repairable items. Inspection and acceptance will occur at the origin, with the contractor remaining responsible for quality assurance and the maintenance of inspection records for 365 days following final delivery. Payment and receiving reports must be submitted through Wide Area Workflow. Evaluation of quotations will be based on the Supplier Performance Risk System and country of origin in accordance with DFARS Part 225.
Other Measuring and Controlling Device Manufacturing

POSTED

2 days ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS