Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of Defense was posted on July 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

WOC ENTRY ACCESS SYSTEM

Closed
FA462626Q0034Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract solicitation FA462626Q0034 is a Small Business Set Aside for the removal and installation of the Wing Operations Center controlled area access system at Malmstrom Air Force Base, Montana. The work requires the contractor to provide all personnel, equipment, tools, materials, vehicles, supervision, supplies, and services necessary to upgrade the security infrastructure, including installing an RFID-enabled access system with PIN backup, a CAC-compatible standalone access control unit, live video surveillance at the main entrance, a two-way intercom system, a remote door buzzer, and a duress alarm integrated with video and audio feeds. Delivery is due on or before November 2, 2026, with performance at the designated destination on base. The solicitation is issued as a Request for Quote under FAR Part 12 for commercial items, implying a Firm-Fixed-Price structure, and evaluation will be based on the lowest price among technically acceptable offers, with a 10% price preference applicable to HUBZone small businesses. All proposals must be submitted electronically via the WOC Access/Entry System by the deadline of July 31, 2026, and inquiry questions must be submitted between July 16 and July 24, 2026. The contract imposes stringent compliance requirements tied to DoD standards and cybersecurity protocols. All items must be uniquely identified with a two-dimensional Data Matrix symbol (ECC200) per MIL-STD-130 and labeled for shipment and storage according to MIL-STD-129, using ISO/IEC 16022 and ISO/IEC 15434 encoding standards. Payment must be processed through Wide Area WorkFlow, and contractors are required to maintain current SAM registration with accurate UEI and CAGE codes. Several critical DFARS clauses apply, including mandatory cybersecurity protections under 252.204-7012, prohibitions on acquisition of foreign-made unmanned aircraft systems and Russian fossil fuels, and restrictions on telecommunications equipment from designated foreign entities. Contractor personnel must comply with Personal Identity Verification requirements, complete antiterrorism awareness training, and adhere to whistleblower protections and representations regarding foreign ownership, forced labor, and sanctions. The government, via DoDAAC F2W0A1, will accept deliverables at the site and assume final inspection authority, requiring full conformance with technical specifications and labeling standards as outlined in the Statement of Work and referenced military standards

General Info

Full removal and installation of access system at Malmstrom AFB by small business, deadline July 31, 2026.

Agency

Department Of Defense → FA4626 341 Cons LgcView Agency

NAICS

561621 - Security Systems Services (except Locksmiths)View NAICS

Place of Performance

0, MT, USA

Set-Aside

SBA

Documents

(4)

Solicitation FA462626Q0034 for WOC Access/Entry System

PDFrfq

Wing Operations Center Security Upgrade Technical Specifications 17 June 2026

PDFsow

Installation+Perimeter+Access+Control.pdf

PDF

Solicitation FA462626Q0034 Q&A for WOC RFID Entry Access System

PDFq-and-a

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Amendment 1

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4626 341 Cons Lgc
Contacts2 people available
OfficeMALMSTROM AFB, MT, 59402-6863, USA
Organization / Agency
Department Of Defense → FA4626 341 Cons Lgc
View Agency Profile
Office AddressMALMSTROM AFB, MT, 59402-6863, USA

Full Description

Show more

All personnel, equipment, tools, materials, vehicles, supervision, supplies and services necessary remove and install the Wing Operations Center (WOC) controlled area access system. 


A question period will run from 16 July 2026 to 24 July 2026 at 5:00PM MDT. 

More opportunities from Department Of Defense → FA4626 341 Cons Lgc

Same awarding agency

NAICS: 238210
Federal
Fiber Optic Cabling Requirement Contract
Solicitation # FA462626Q0035
Solicitation FA462626Q0035 is a total small business set-aside for a fiber optic cabling requirement at Malmstrom Air Force Base, Montana. The contract covers outside and inside plant cable installation, surveys, and maintenance, including Category 6 wiring, multimode fiber installation, and communications closet maintenance. The award will be a firm-fixed-price requirements contract with a five-year ordering and performance period from September 30, 2026, to September 29, 2031. The contract has a minimum guaranteed value of 200,000 dollars over the five-year term, with a maximum contract value of 5,000,000 dollars. The government will award the contract based on best value, evaluating technical rating, past performance, and price, with non-price factors being significantly more important than price. Proposals must include a completed SF 1449, a master pricing sheet, and detailed price breakdowns for small, medium, and large mock projects. An amendment has extended the quote submission deadline to September 18, 2026, at 5:00 PM MDT. Key requirements include 24/7 emergency fiber optic backbone restoration services, TAA/Buy American compliance for all materials, and strict adherence to industry and 341CS cable marking standards. All invoicing must be processed through the Wide Area WorkFlow system.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

10 days ago

DEADLINE

in 7 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS