Woody Island and at the Kodiak ATCT Remedial Investigation

Awarded
697DCK-26-R-00184Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project was initiated following a sprinkler system failure that caused significant water damage. The scope of work requires the remediation of the entire building, including cleaning visible mold from CMU walls, concrete floors, and vinyl tiles, as well as the removal and replacement of affected drywall, gypsum wallboard, and acoustical tile ceiling finishes. Additionally, the contractor must clean or replace damaged theater seating cushions and perform dehumidification to maintain humidity levels at or below 50 percent. All work must adhere to ANSI/IICRC S520 standards, EPA guidelines, OSHA regulations, and the findings of the Micro Air Inc. Mold Testing report dated April 11, 2024. The contract is a single lump sum award based on best value, with evaluation weights distributed across price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Key requirements include the provision of a Certified Industrial Hygienist for verification and final clearance, a detailed remediation plan featuring HEPA filtration and negative air pressure, and compliance with Davis-Bacon Act wage determinations. Bidders must hold a valid Indiana Contractor's License and provide proof of automobile and workers compensation insurance, naming Adams and Associates, Inc. as an additional insured. Proposals must be submitted on company letterhead and include a detailed cost breakdown, a timeline for substantial completion, and a 90-day bid guarantee. Work must commence within 14 days of the Notice to Proceed, and payment is issued on Net 30 terms.
Atterbury Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in 10 days

AI Contract Overview

Show more

The FAA is seeking a qualified contractor to conduct a remedial investigation at the Kodiak ATCT and multiple locations on Woody Island, including the CT Site, Building 605, the Former Tank Farm and Pipeline Area, and the Former Communications and Housing Facility. The primary objective is to determine the severity and extent of soil and groundwater contamination. The scope of work includes soil screening, groundwater sampling, the installation and development of monitoring wells, and GPR surveys to locate buried debris and utilities. All activities must be overseen by a Qualified Environmental Professional and adhere to ADEC Field Sampling and Groundwater Sampling and Monitoring Wells Guidance. Due to the remote nature of the sites, the contractor must manage logistical challenges, as Woody Island and Kodiak are primarily accessible by boat and plane. Specific technical requirements include the use of direct read field instruments, silica gel cleanup for organic-rich soils, and the use of pressure transducers for tidal cycle data collection. This opportunity is set aside for SBA certified 8(a) program participants. Interested vendors must submit their company information, UEI number, and relevant experience to the designated point of contact by March 27, 2026.

General Info

Contract Value

$804,725

NAICS

562910 - Remediation Services

Place of Performance

Kodiak, AK, USA

Set-Aside

8A

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 697DCK Regional Acquisitions Svcs
Contacts2 people available
OfficeFORT WORTH, TX, 76177, USA
Office AddressFORT WORTH, TX, 76177, USA

Full Description

Show more

The FAA has a requirement to perform a remedial investigation (RI) at multiple locations on Woody Island and at the Kodiak ATCT to investigate the presence, severity and extent of contamination in soil and groundwater at concentrations that exceed applicable cleanup criteria.


Special Considerations:


Woody Island


Woody Island is not connected to the state’s road system and is accessible primarily by boat. There is a barge landing on the island’s west side and a gravel road running the length of the island.


Kodiak ATCT


Kodiak Island is not connected to the state’s road system and is accessible primarily by boat and plane. The Kodiak ATCT is located within the USCG Base Kodiak and access must be coordinated with the USCG.


Below is an abbreviation of the statement of work and no attachments will be provided until solicitation:


- The Contractor must provide all equipment, supplies and labor required to perform RI activities at multiple locations at Woody Island Station at 4 separate areas (CT Site, Building 605, Former Tank Farm and Pipeline Area, Former Communications and Housing Facility) and the Kodiak ATCT.


- All RI activities including soil and groundwater sampling, soil screening, and monitoring well installation/development/sampling must be conducted according to the most recent ADEC Field Sampling Guidance and Groundwater Sampling and Monitoring Wells Guidance.


- The Contractor must use allotted samples to delineate the lateral and vertical extent of all previously indicated sources of contamination exceeding applicable cleanup levels at the Former Woody Island Station and Kodiak ATCT. The investigation at each site must be guided by direct read field instruments when possible (ie XRF for lead, and PID for petroleum/solvents), historical information, and professional judgment.  


-  All RI activities must be overseen be a Qualified Environmental Professional (QEP) as defined by 18 AAC 75.333.


- All RI activities including, but not limited to, soil and groundwater sampling, soil screening, and monitoring well installation/development/sampling must be conducted according to the most recent 18 AAC 75, ADEC Field Sampling Guidance and Groundwater Sampling and Monitoring Wells Guidance.


- Analytical sampling must be conducted for media and analytes listed at each feature of work in Section 4, 5 and Section 12 “Sample Analysis and Regulatory Methods”.


- All petroleum contamination at the former Woody Island Field Station and the Kodiak ATCT must be delineated utilizing analytical sampling.


- The soil at the CT site contains a high percentage of organic material. All samples collected for DRO/RRO must also be analyzed with the silica gel cleanup method. The Contractor must also be prepared to run silica gel cleanup on all samples collected at any other sites where significant organics are noted in the sample collected.


- Non-petroleum contamination (PCBs, RCRA metals, etc.) investigation is only planned at the former Woody Island Field Station at the Former Communications and Housing Area. Contamination must be delineated utilizing analytical sampling. The Contractor must utilize an appropriate screening methodology (XRF) to assist in determining field sampling locations.


- Soil borings must be completed by continuously coring with a direct push drill rig with a direct push or hollow stem auger; however, the Contractor must also be prepared to use hand tools to sample in locations that are not accessible by drill rig. Soil boring logs must be provided for each boring.


- All borings must be advanced a.) at least 5 feet past the last observed contamination in a borehole (regardless of the depth to groundwater) or b.) 2 feet below groundwater in locations where no contamination is observed or c.) refusal.


- Test pits must be advanced using equipment, not hand tools, unless otherwise specified. Test pits must be advanced to native soils underneath observed debris, contamination, or until groundwater precludes deeper excavation.


- Monitoring wells must be permanent monitoring wells constructed and installed in accordance with the most recent ADEC Monitoring Well Guidance. All wells in the Kodiak ATCT, Building 605, Former Tank Farm and Pipeline, and Former Communications and Housing Facility areas must be flush mounted unless site conditions dictate the need for a stick-up well.


- Some wells in the NW portion of the CT site may require installation of monitoring wells by hand due to site access restrictions (steep mossy slope down to the lake).


- All groundwater sampling must be conducted according to the most recent 18 AAC 75, ADEC Field Sampling Guidance and Groundwater Sampling and Monitoring Wells Guidance using low flow methods to minimize VOC loss.


- The Contractor must utilize an in-well data collection system (pressure transducers) to gather continuous conductivity, temperature, and depth (CTD) data over the duration of the tidal cycle.


- The Contractor must perform GPR surveys at multiple locations prior to conducting any intrusive site work to confirm the locations of buried debris, concrete, groundwater interface, and/or bedrock surface, as called out in their respective sections within this SOW.


- The Contractor must provide utility locate services to identify all buried utility systems where work will take place.


- The full SOW and any referenced attachments will be provided at time of solicitation.


Response to this notification must be recieved in order to be included in the solicitation.  Responses must include the following information:


In order to better understand the market for this potential requirement, the FAA requests the following information from interested SEDB 8(a) certified vendors:


1. Name of Company (the resultant Prime contractor that may ultimately be awarded the subsequent contract)


2. Address


3. Point of Contact name, email address and telephone number


4. UEI Number


5. Relevant experience on similar projects within the last five years. Please provide specific contract numbers, contact names and email information to support claimed capabilities.  Limit to no more than 5 pages.


The System for Award Management (SAM) registration for interested Contractors must show that they are an active SBA certified 8(a) program participant or the interested Contractor must provide a copy of their SBA 8(a) certification letter in their response to this notice to be considered for inclusion in the future solicitation.


Please submit your capability statement and the above information to contact@example.gov no later than March 27, 2026 at 1300 CDT.

More opportunities from Department Of Transportation → 697DCK Regional Acquisitions Svcs

Same awarding agency

NAICS: 236220
New
Federal
MARKET SURVEY NOTICE for new ATCT Project at (FLL) Fort Lauderdale- Hollywood International Airport
Solicitation # 697DCK-27-R-FLL01
The Federal Aviation Administration is conducting a market survey for the Progressive Design Build of a new Air Traffic Control Tower (ATCT) at the Fort Lauderdale-Hollywood International Airport in Florida. This project, identified under solicitation 697DCK-27-R-FLL01 and NAICS code 236220, has a total target budget of 85 million dollars. The procurement is structured in two primary phases: Phase 1 focuses on programmatic validation, preconstruction services, and preliminary design up to 70 percent completion, while Phase 2 covers final design, full construction, commissioning, and warranties. The contract utilizes a Firm Fixed Price model for Phase 2 construction, with a total budget encompassing both the new tower facility and final parking and site configuration. The FAA will employ a Tradeoff Source Selection Method, prioritizing non-cost factors over price. Evaluation is based on three volumes: a pass/fail business proposal, a statement of qualifications focusing on project past performance and experience, and a Phase 1 price proposal requested only from the apparent awardee. Qualified sources must demonstrate a record of completing mission-critical facilities of similar scope within the last ten years. The selection process includes confidential interviews with the three highest-rated submittals. Additionally, firms categorized as other than small businesses must provide a subcontracting plan meeting specific goals, including 40 percent for small businesses and 5 percent each for socially disadvantaged, women-owned, and service-disabled veteran-owned small businesses.
Commercial and Institutional Building Construction

POSTED

about 14 hours ago

DEADLINE

in 7 days
View Details
NAICS: 541330
New
Federal
Design Renovation, System Support Center (SSC), 3551 Combine St., Paso Robles, CA
Solicitation # 697DCK-27-R-00022A
The Federal Aviation Administration is seeking engineering design services for the renovation of a 4,992 square foot leased building to serve as a System Support Center located at 3551 Combine St., Paso Robles, California. This procurement, identified by solicitation number 697DCK-27-R-00022A, is a Total Small Business Set-Aside. The selected contractor will be responsible for developing permit-ready Mechanical, Electrical, Plumbing, Life Safety, and Fire Protection drawings based on provided Design Intent Drawings. Key deliverables include three full-size stamped construction permit drawings approved by the City of Paso Robles, a dedicated life safety sheet, and all necessary electrical load and hydraulic calculations. All work must comply with 2022 California Building Codes and local standards. The period of performance is 130 days from the issuance of the Notice to Proceed, with a potential option to extend services for up to six months. Award will be based on the best value, considering successful price negotiations and conformance with solicitation terms. Offerors must submit their proposals in PDF or Word format to Linda Hennequant by November 12, 2026, ensuring the solicitation number is included in the subject line. Submissions must include a past performance record of at least three relevant projects completed within the last five years. Invoicing for this contract will be managed electronically through the Delphi eInvoicing web portal.
Engineering Services

POSTED

1 day ago

DEADLINE

in 14 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS