Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from New York was posted on November 7, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Work Zone Traffic Control for I-287 for New York State Thruway Authority (NYSTA)

Closed
2128481State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 423860
SLED
26-04060TD S70 MT & CT HPU Overhaul Material IFB
Solicitation # 26-04060TD
The Utah Transit Authority (UTA) has issued a firm fixed-price Invitation for Bids (IFB) to procure materials necessary for the overhaul and update of Hydraulic Power Units (HPUs) for its fleet of 77 Siemens S70 Light Rail Vehicles. The objective is to ensure reliable service for an additional 15 years through the replacement of wearable items and pump motors, with the actual overhaul work to be performed by UTA personnel. The contractor is required to provide materials packaged as complete kits; individual parts will not be accepted. Specifically, the procurement includes Kit A for Motor Truck HPUs, Kit B for Non-Power or Center Truck HPUs, and Kit C for updating MT/CT HPUs with Interface Blocks and pump motor half-life replacements. All parts must meet or exceed OEM specifications, maintenance manual requirements, and the standards detailed in the solicitation. Bids are due by October 8, 2026, at 3:00 pm via the Euna portal, and the award will be granted to the lowest responsive and responsible bidder based on the bid price of the parts. To be considered responsive, submissions must include a technical bid limited to 25 pages, a bid sheet, and all required signed forms and certifications. The contractor must maintain a Quality Assurance Program and provide completed test documents to certify that all materials meet specifications prior to delivery, which is FOB to a UTA-designated destination. This contract includes strict compliance with federal regulations, including the Build America, Buy America Act, ADA standards, and record retention requirements under 2 C.F.R. § 200.334. Payment for approved invoices will be issued within 30 calendar days of submittal.
Utah

POSTED

8 days ago

DEADLINE

in about 1 month
NAICS: 423860
SLED
Transit Coach Fluids & Absorbent
Solicitation # 107-2026
The Southwest Ohio Regional Transit Authority (SORTA), operating as Cincinnati Metro, has issued solicitation 107-2026 for Transit Coach Fluids and Absorbent. This procurement is managed by the Maintenance agency in Cincinnati, Ohio, with a response deadline of September 16, 2026. The scope of work involves the delivery of specialized fluids and absorbents to support a fleet of approximately 390 vehicles, including fixed-route, paratransit, and micro-transit buses serving Hamilton, Butler, Clermont, and Warren Counties. The contractor is required to be fully qualified to perform these services in compliance with federal, state, and local laws, providing all necessary work products, manuals, and warranties. The contract is governed by custom terms and conditions rather than standard FAR clauses, emphasizing strict compliance with the Americans with Disabilities Act, the Clean Air Act, the Clean Water Act, and FTA drug and alcohol testing regulations. Key administrative requirements include the designation of an approved Project Manager, the maintenance of adequate liability insurance, and a commitment to maximize the participation of small and disadvantaged businesses. Invoices must be submitted in writing to the SORTA Accounts Payable Department in Cincinnati and must include a valid purchase order number. Performance is subject to inspection and acceptance by SORTA, with a strong emphasis on equal employment opportunity and non-debarment certifications.
Maintenance

POSTED

16 days ago

DEADLINE

in 13 days

AI Contract Overview

Show more

This contract involves providing Work Zone Traffic Control (WZTC) services for survey crews working along approximately eight miles of I-287 in Rockland County, New York, under Contract Number D214812. The subcontractor will supply all necessary labor, materials, equipment, and tools to ensure the safe surveying and field investigations for KC Engineering and Land Surveying, WSP USA Inc., Hayduk Engineering LLC, and NYSTA personnel. The scope includes managing shoulder, right lane, and left lane closures during both daytime and nighttime hours, with rates required for full-day mobilizations and partial-day work, adhering to MUTCD 2009 standards and NYSTA specifications. The contract duration is from early January 2026 through the end of December 2026, with work to be scheduled in coordination with KC and subject to holiday restrictions. Bidders must demonstrate at least five years of relevant traffic control experience, provide recent NYSTA or NYSDOT references, and hold current flagging certifications. The subcontractor is responsible for site safety, equipment ownership, and timely mobilization within 48 hours of notification, with cancellation policies requiring notice at least four hours prior. The project emphasizes compliance with insurance and permitting requirements, with proposals due by December 1, 2025, and the contract awarded to the lowest qualified bidder within twenty days of bid submission. The process is managed by KC, which reserves the right to reject non-responsive bids or those lacking adequate experience or equipment, and the successful bidder will enter into a formal subcontract with KC.

General Info

Agency

New York Subcontract OpportunitiesView Agency

NAICS

423860 - Transportation Equipment and Supplies (except Motor Vehicle) Merchant WholesalersView NAICS

Place of Performance

NY, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNew York Subcontract Opportunities
ContactsNo contacts available
OfficeN/A
Organization / Agency
New York Subcontract Opportunities
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
KC Engineering and Land Surveying, P.C. (KC) is seeking a Subcontractor to provide Work Zone Traffic Control (WZTC) for survey crews in Rockland County for a portion of   I-287 under Contract Number D214812. The work will consist of providing all labor, materials, machinery, tools, and equipment necessary to perform WZTC on I-287, Rockland County in the State of New York. The WZTC is required for KC, WSP USA Inc. (WSP), Hayduk Engineering LLC (Hayduk) and New York State Thruway Authority (NYSTA) personnel, or their authorized designee, to safely survey and perform other field investigations of approximately eight (8) miles of highway corridor in the Towns of Orangetown, Clarkstown, and Ramapo.  Work shall be performed as described and in accordance with the Manual of Uniform Traffic Control Devices (MUTCD) – 2009 and the New York State Supplement with all applicable revisions and the NYSTA Standard Sheets (Work Zone Traffic Control), dated  May 1, 2025 Volumes 1 & 2. Applicable sheets are provided herewith in the IFB documents under Section TA-619.   WZTC may be required for the following tasks: Shoulder closures: Per day for one crew Per day for two crews at different locations (two WZTC setups simultaneously) Right lane closures: Per day for one crew Per day for two crews at different locations (two WZTC setups simultaneously) Left lane closures: Per day for one crew Per day for two crews at different locations (two WZTC setups simultaneously)  Bids for the above should be provided for daytime and nighttime mobilizations Daily rates for each of the above tasks must be provided. The project is subject to Prevailing Wage provisions. Mobilization by the WZTC Subcontractor is required within 48 hours (“working days”) of notification by KC.  Cancellation of any WZTC deployment must be made by KC no later than four (4) hours prior to the scheduled WZTC mobilization.  If cancellation by KC is made later than four (4) hours before the scheduled mobilization on any given day, the WZTC Subcontractor shall be entitled to full payment for the given task for that day. All rates shall be given for full day’s mobilization. A full day consists of 10 hours to allow for mobilization and demobilization of the set-ups. Payment for full days with multiple bid item set-ups will be based on a prorated basis. Payment for partial days of work will be 50% of bid price for up to 4 hours of field work and 100% thereafter. The Subcontractor’s crew’s travel time to and from the site shall not be included for full and partial days.    The Subcontractor shall visit the site as a condition of submitting a bid.  On-site safety of the WZTC Subcontractor’s personnel and the work area shall be the responsibility of the WZTC Subcontractor. Required Experience: The Subcontractor shall have a minimum of five (5) years documented experience in the performance of traffic control for NYSDOT and/or NYSTA projects. The successful bidder must provide at least three (3) NYSTA and/or NYSDOT references within the past five (5) years for verification with their proposal. All Subcontractors’ personnel assigned to this work shall have their flagging certification current, must be able to communicate in a clear and effective manner, and be familiar with the MUTCD – 2009 and New York State Thruway Authority Standard Sheets (Work Zone Traffic Control), dated May 1, 2025, Volumes 1 & 2 with all applicable revisions. The Subcontractor shall have a NYSDOT Vendor Responsibility Questionnaire on file with the State. Contract: The duration of the contract will be on an as-needed basis from approximately January 4, 2026, until December 31, 2026.  The schedule is approximate and will be coordinated between KC and the Subcontractor.  Schedule is subject to holiday embargos as specified by NYSTA. Included with their proposal, the WZTC Subcontractor shall provide a summary of ownership of all equipment necessary to provide the services required. A Foreman must be on-site at all times with a working cell phone, and the minimum crew shall be two (2) persons, which can include the foreman. KC is a Subcontractor for prime consultant WSP USA Inc. (WSP) under the NYSTA’s Contract No. D214812. All applicable provisions of KC’s subcontract apply to the Subcontractor. The following representatives will have the right to manage the site requirements: KC, WSP, Hayduk, and NYSTA personnel. KC reserves the right to reject any, and all bids, to waive any, and all informalities, to invite for new bid proposals, and to disregard all nonconforming, non-responsive or conditional bids.  Bids shall be disqualified or rejected if: Bid is not received by the stated time and date. In the judgment of the consultant and/or NYSTA if the bidding entity is deemed to not have adequate equipment, experience, references or manpower to perform the required work. Insurance:  The insurance requirements shall be in accordance with the specifications in the Bid Documents and shall consist of the following: Policies of Bodily Injury Liability and Property Damage Liability Insurance; Policies of Automobile and Truck Insurance; and Workmen’s Compensation Insurance. Permits – The design team (WSP & KCE) is responsible for coordination with NYSTA on lane closures and necessary permits.  Deadline: Proposals prepared in conformance with the Bid Documents shall be accepted until 1:00 PM (Local Time), December 1, 2025.  Bid Letting:  Proposals should be sealed and submitted by mail.  Electronic proposals, i.e., by e-mail will not be accepted.  Signed proposals must be received by 1:00 PM (local time) on December 1, 2025. Proposals received after the deadline will not be accepted.  No bid information or interpretations can be provided orally; all must be by written addenda sent out three (3) days before the submission of bids. The Award of the Contract will be made to the lowest qualified bidder within twenty (20) calendar days after receipt of Bids, subject to final approval of NYSTA. The successful bidder will be required to enter into a formal subcontract with KC. If the lowest qualified bidder is not able to provide their services in a timely manner, KC reserves the right to use the next lowest bidder. IFB Package can be found at this link: : D214812 Design Services for H445.1 Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 0% Women Owned Sub-Contracting Goal: 0% Service-Disabled Veteran-Owned Business Contracting Goal: 0% Disadvantaged Owned Sub-Contracting Goal: 0% Due date:12/01/2025 Contract term: 01/04/2026 through 12/31/2026 County(ies): Rockland Location: Towns of Orangetown, Clarkstown and Ramapo This is a subcontract opportunity issued by KC Engineering and Land Surveying, P.C.