This Solicitation opportunity from Michigan was posted on September 30, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
WRC Bavarian Softwater Plant Restoration
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract involves the comprehensive restoration of the WRC Bavarian Softwater Plant in Oakland County, Michigan. The scope of work includes surface preparation and coating of an 8,636-gallon hydropneumatic tank, both on its exterior and interior, with additional work on concrete saddles. Containment measures are to be implemented during coating activities to ensure safety and environmental protection. The project also entails replacing the gasket on the manway, installing a second manway for improved access, and replacing piping nuts and bolts to ensure the integrity of the piping system. The contract is valued between $500,000 and $1,500,000 and is open for responses until October 28, 2025. The project is managed by Oakland County, Michigan, with Megan Kaer serving as the primary contact. Interested parties can find more details and submit responses through the designated procurement portal.
General Info
Place of Performance
MI, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
- Lift Station No. 85 ReplacementOpen now, due in 28 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
- Preparation and coating of the exterior and piping surfaces of an 8,636-gallon hydropneumatic tank, including containment measures. - Preparation and coating of the wet interior surfaces. - Surface preparation and coating of concrete saddles. - Replacement of the manway gasket. - Installation of a second manway. - Replacement of piping nuts and bolts.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
