This Solicitation opportunity from Michigan was posted on May 27, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
WRC: Walnut Lake No.2 Conveyance CAP Phase II
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract for the Walnut Lake No.2 Conveyance CAP Phase II project involves the removal and replacement of existing sewer siphon pipes in Oakland County, Michigan. The scope includes extracting two siphon pipes with diameters of 78 inches and 66 inches, which currently connect the Evergreen-Farmington Sanitary Drain to the 96-inch sewer system operated by the Great Lakes Water Authority. The new pipeline will be installed using a hand mining method, carefully positioned above the existing pipes to minimize disruption and ensure proper alignment. The project aims to improve sewer conveyance infrastructure within the region, with a contract value estimated between $500,000 and $1,500,000. The solicitation was posted on May 27, 2025, with a response deadline of June 25, 2025. The project is managed by Oakland County under the Michigan state jurisdiction, and interested contractors can contact Megan Kaer via email for further details. The project is open to qualified bidders, and additional information, including bidding instructions and project specifics, can be accessed through the provided online link. This contract represents a significant infrastructure upgrade designed to enhance the reliability and capacity of the local sewer system.
General Info
Place of Performance
MI, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
- Lift Station No. 85 ReplacementOpen now, due in 28 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
