This Solicitation opportunity from Pennsylvania was posted on April 28, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The Brown Township Municipal Authority is soliciting sealed bids through the PennBid Program for the construction project titled WWTP Blower Replacement - Electrical Improvements, with bids due by 11:00 am on May 13, 2025. Bidders can access the complete contract documents at no cost via the PennBid website. All inquiries regarding the contract must be submitted through the PennBid Public Q&A section; phone, fax, or email questions will not be accepted. To participate, bidders are required to submit a security deposit equal to 10 percent of their bid, in accordance with the Instructions to Bidders. The project is classified as a Public Works project under Pennsylvania law, requiring adherence to prevailing wage rates established by the Pennsylvania Secretary of Labor, which are incorporated into the contract documents.
Bids must remain open and irrevocable for sixty days following the bid opening, or up to one hundred twenty days if delays occur due to government approvals, bond sales, or grants, in compliance with Act 317 of 1978. The project involves electrical improvements for the wastewater treatment plant blower replacement and is estimated to cost between $500,000 and $2,000,000. Interested parties can find additional details and submit their bids through the provided link on the PennBid platform.
PDF, High priority: read this firstsubmission-instructions
HighAI Summary for 00 21 13.1 - Instructions for Electronic Bidding: This document provides detailed instructions for bidders on how to use the PennBid electronic bid management system to respond to a Request-for-Quotation. It covers registration, downloading documents, communicating with project owners, and the step-by-step process for submitting and revising electronic bids. Additionally, it lists required submission documents, including the Bid Form, Bid Bond, Bidder's Acknowledgement, Qualification Statement, Non-Collusion Affidavit, and Public Works Employment Verification Form.
XLSX
XLSX, High priority: read this firstbid-tabulation
HighAI Summary for BT-06JY Village Green Detention Basin Restoration Bid Tabulation: A bid tabulation spreadsheet for the Village Green Detention Basin Restoration project (BT-06JY). The document compares unit and total costs for a base bid and two alternates across four vendors: Associated Paving Contractors, Inc., B. Blair Corporation, CPA Pavement Services, Inc., and G&B Construction. It includes a legend for identifying the lowest prices and selected items.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for CN #2025-02 Village Green Detention Basin Restoration - Addendum #1: Addendum #1 dated June 23, 2025, for the Village Green Detention Basin Restoration project. It revises Project Plans (Document 00 01 15.01) to specify that two existing flared end sections related to Alternate Bids must be removed and replaced with concrete endwalls.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for CN #2025-02 Village Green Detention Basin Restoration - Addendum #2: Addendum #2 dated June 25, 2025, for the Village Green Detention Basin Restoration project (CN #2025-02). This document provides a revision to Document 00 43 13 (Bid Bond) to correct the Owner's name to Dublin Borough and update the bid due date. Bidders are required to acknowledge receipt of this addendum.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for CN #2025-02 Village Green Detention Basin Restoration - Addendum #3: Addendum #3 dated July 3, 2025, for the Village Green Detention Basin Restoration project (CN #2025-02) in Dublin Borough, Bucks County, PA. This modification revises Document 00 73 00 Supplementary Conditions to remove a specific phrase regarding the commencement of contract times in Section 1.02.
PDF
PDF, High priority: read this firstpast-performance
HighAI Summary for Contract 2025-02: Bidder Qualification Statement: A mandatory Bidder Qualification Statement for Contract 2025-02: Village Green Detention Basin Restoration. The document requires bidders to provide organizational background, work history of similar projects from the past five years, financial statements, and a notarized affidavit to verify the bidder's qualifications.
PDF
PDF, High priority: read this firstitb
HighAI Summary for Contract 2025-02: Village Green Detention Basin Restoration: Advertisement for Bids issued by the Borough of Dublin in May 2025 for Contract 2025-02. The project involves the restoration of the Village Green detention basin, including regrading, seeding, stabilizing, and installing a new outlet structure and riprap protection. Bids are due online via PennBid by July 8, 2025, at 10:00 A.M. The project requires a 10% bid bond and compliance with PennDOT Publication 408 and the Pennsylvania Prevailing Wage Act.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Contract 2025-02: Village Green Detention Basin Restoration Agreement: This is a formal agreement between the Borough of Dublin (Owner) and a Contractor for the Village Green Detention Basin Restoration (Contract 2025-02). The scope includes regrading, seeding, stabilizing the basin, and installing new outlet structures and riprap protection. The document outlines a 30-day substantial completion timeline, a 45-day final payment timeline, liquidated damages of $500 per day for delays, and detailed payment procedures including a 10% retainage structure.
PDF
PDF, High priority: read this firstbid-bond
HighAI Summary for Contract 2025-02 Village Green Detention Basin Restoration - Bid Bond: A bid bond form for the Village Green Detention Basin Restoration project (Contract 2025-02) for the Dublin Borough, PA. The document outlines the legal obligations of the Bidder and Surety to pay a penal sum upon default of the Bidder, with a bid due date of July 8, 2025.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Contract 2025-02: Village Green Detention Basin Restoration - Bidder's Acknowledgement Form: A Bidder's Acknowledgement Form for Contract 2025-02, Village Green Detention Basin Restoration. The document requires the bidder to certify they have reviewed all bidding documents and addenda, visited the site, and comply with all laws and regulations. It includes certifications against collusive or fraudulent practices and outlines the basis of the bid, time of completion, and required attachments for submission.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract No. 25-02 Village Green Detention Basin Restoration - Project Manual: Project manual title sheet for Contract No. 25-02, Village Green Detention Basin Restoration for Dublin Borough, PA. Prepared by Gilmore & Associates, Inc. in June 2025.
PDF
PDF, High priority: read this firstitb
HighAI Summary for Document 00 21 13 - Instructions to Bidders: This document provides the formal Instructions to Bidders for a procurement project. It outlines the rules and procedures for bid submission, including bidder qualifications, site examination requirements, the use of bidding documents via PennBid, and the evaluation process for awarding the contract. It covers critical administrative articles such as bid security, liquidated damages, and the handling of subsurface and hazardous environmental conditions.
PDF
PDF, High priority: read this firstbid-form
HighAI Summary for Document 00 41 00 - Bid Form: A placeholder document for the Bid Form (Document 00 41 00), directing users to the PennBid website to locate the specific form associated with the contract.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Document 00 73 00 - Supplementary Conditions: This document contains the Supplementary Conditions for a construction contract, amending and supplementing the EJCDC No. C-700 (2007 Edition) General Conditions. It defines key terms, establishes contract commencement times, outlines the schedule of values, and specifies requirements for contract documents, subsurface conditions, and compliance with the Pennsylvania Prevailing Wage Act.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Document 00 91 13 - Addenda: This document outlines the procedure for issuing addenda for bidding documents, specifying that they will be included in the documents if issued prior to procurement or posted on the PennBid website if issued after.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Dublin Borough Contract No. 2025-02 - Table of Contents: Table of Contents for Dublin Borough Contract No. 2025-02, Village Green Detention Basin Restoration. The document outlines the structure of the solicitation, including procurement requirements (bid forms, bonds, instructions), contracting requirements (agreements, general conditions), and technical specifications across Division 01 (General Requirements) and Divisions 02-32 (Exterior Improvements).
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for EJCDC Standard General Conditions of the Construction Contract: This document contains the Standard General Conditions of the Construction Contract prepared by the Engineers Joint Contract Documents Committee (EJCDC). It establishes the legal and operational framework for a construction project, covering definitions, contractor and owner responsibilities, bonds, insurance, change orders, payment terms, and dispute resolution. The provided text includes the table of contents and the beginning of Article 1 (Definitions and Terminology).
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Project 25-04812 - Village Green Detention Basin Restoration Prevailing Wage Determination: Prevailing minimum wage rate determination issued by the Bureau of Labor Law Compliance for the Village Green Detention Basin Restoration project (Serial No. 25-04812) in Dublin Borough, Bucks County. The document specifies hourly rates and fringe benefits for various labor classifications, including carpenters, electricians, and iron workers, with a determination date of 5/5/2025 and a contract award date of 6/9/2025.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Project 7867.0466 - Addendum No. 4: Addendum No. 4 dated June 10, 2025, for the Harmony Pump Station Infrastructure Improvements Project (Project No. 7867.0466). This document modifies the original Bidding Documents and previous addenda, specifically updating the quantity for Item No. 59 in the Bid Form for Construction Contract (Section 00 41 18). The bid date remains unchanged.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Project 7867.0466 - Harmony Pump Station Infrastructure Improvements - Addendum No. 1: Addendum No. 1 dated May 15, 2025, for the Harmony Pump Station Infrastructure Improvements Project (Project No. 7867.0466) issued by the Western Butler County Authority. This document modifies the Bidding Documents dated May 7, 2025, specifically adding a June 3 site availability date to Section 00 21 13 (Instruction to Bidders). It also includes general Instructions to Bidders regarding qualifications and bidding procedures.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Section 01 11 13 - Summary of Work (Village Green Detention Basin): This document provides the Summary of Work for the regrading, seeding, and stabilization of the existing detention basin within the Village Green neighborhood. It details the base bid requirements, including the installation of a new outlet structure and riprap protection, as well as alternate bids for inflow pipes. The document specifies compliance with PennDOT Publication 408, Borough Standards, and OSHA safety regulations, and outlines contractor responsibilities regarding site use, work sequencing, and traffic control.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 22 00 - Measurement and Payment: This technical specification document outlines the measurement and payment criteria for various construction activities, including basin regrading, outlet structure installation, riprap protection, and debris removal. It defines the basis for payment (lump sum or unit price) and specifies what labor, materials, and equipment are included in the compensation for each line item.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 29 00 - Contract Considerations: This technical specification document outlines the administrative requirements for contract management, including the submission of the Schedule of Values, monthly application for payment procedures, and detailed change order processes (Stipulated Price, Unit Price, Work Change Directives, and Time and Material changes).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 31 00 - Coordination and Meetings: Technical specification section 01 31 00 detailing requirements for project coordination, field engineering, and meeting protocols. It outlines the contractor's responsibilities for survey control, preconstruction meeting agendas, and the scheduling and documentation of progress meetings.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 33 00 - Submittals: Technical specification section 01 33 00 detailing the requirements and procedures for submittals, including construction progress schedules, product data, shop drawings, certificates, and manufacturer's instructions. It outlines the submission process, review timelines, and documentation standards required for the Engineer's approval.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 40 00 - Quality Controls: Technical specification section 01 40 00 detailing quality control requirements for a construction project. It covers quality assurance, installation tolerances, reference standards, mock-up requirements, testing laboratory services, observation services, and manufacturer field services, as well as execution requirements for site examination and preparation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 42 13 - Organization and Reference Acronyms: This document is a technical specification section (01 42 13) providing a comprehensive list of acronyms and their corresponding organizations or references used throughout the Project Manual, including standards from AASHTO, ANSI, ASTM, and PennDOT.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 50 00 - Construction Facilities and Temporary Controls: Technical specification section 01 50 00 detailing requirements for construction facilities and temporary controls. It covers temporary sanitary facilities, barriers, water control, protection of installed work, security, parking, progress cleaning, waste removal, project identification, dust control, and the removal of temporary utilities.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 55 26 - Traffic Regulation: Technical specifications detailing the contractor's obligations for traffic regulation during construction. It covers the implementation of traffic control plans, notification requirements for local authorities, parking controls, the use of certified flag persons, haul routes, and the installation and removal of traffic signs and signals.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 56 39 - Landscape Protection: Technical specifications for landscape protection during construction. The document outlines requirements for protective fencing, site inspection, root preservation, pruning, fertilization, and utility trenching/tunneling to ensure the survival of plant materials.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 57 13 - Soil Erosion and Sediment Controls: Technical specifications for Soil Erosion and Sediment Control, detailing the implementation of the project's control plan. It mandates compliance with Pennsylvania DEP and PennDOT Publication 408 standards, covering temporary and permanent measures such as silt fences, inlet protection, and seeding, including requirements for weekly inspections and final stabilization.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 60 00 - Material and Equipment: Technical specification section 01 60 00 detailing requirements for the procurement, transportation, handling, storage, and protection of materials and equipment. It includes specific guidelines for product options and the formal procedure for requesting substitutions.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 70 00 - Contract Closeout: Technical specifications detailing the requirements for contract closeout, including final cleaning, punchlist completion, project record documents (as-builts), and final documentation such as payroll certifications and lien waivers required for final payment.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 71 13 - Mobilization: Technical specifications for Section 01 71 13 regarding Mobilization. It outlines the assembly and set-up of facilities, permit and insurance requirements, and the necessity for video and photographic documentation of existing roadway conditions. Note that mobilization is incidental to other work and contains no separate payment line item.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 02 41 16 - Demolition: Technical specifications for demolition work, including requirements for removal procedures, site protection, utility coordination (including Pennsylvania Act 172 compliance), asbestos standards, and debris disposal.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 03 11 00 - Concrete Formwork: Technical specifications for Section 03 11 00, detailing requirements for concrete formwork, shoring, bracing, and anchorage. The document covers design requirements per ACI standards, material specifications for wood forms and accessories, and execution procedures including erection, form release agent application, and removal tolerances.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 03 20 00 - Concrete Reinforcement: Technical specifications for concrete reinforcement, including reinforcing steel bars, wire fabric, and accessories. The document outlines reference standards (ACI, ASTM, CRSI), submittal requirements, quality assurance, material grades (ASTM A615, 60 ksi), and execution guidelines for placement and fabrication.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 31 11 00 - Clearing and Grubbing: Technical specifications for Section 31 11 00, covering clearing, grubbing, topsoil stripping, and debris disposal. It defines the scope of work, required submittals (burning permits and disposal agreements), material requirements for fencing, and execution procedures for utility relocations and site restoration.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 31 20 00 - Earthwork: Technical specifications for earthwork, covering site grading, topsoil/subsoil removal, building excavation, and backfill. It defines quality assurance standards (ASTM and PennDOT), submittal requirements for soil testing, material specifications for fill and drainage, and detailed execution procedures for excavation and compaction.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 31 22 10 - Topsoiling and Finish Grading: Technical specifications for Section 31 22 10, covering the preparation of subgrade, placement of topsoil, and finish grading for landscaping. It details quality assurance, reference standards (ASTM, PennDOT), submittal requirements for soil analysis, and specific material requirements for both on-site and imported topsoil.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 31 23 33 - Excavation, Backfill and Compaction: Technical specifications for excavation, backfill, and compaction activities associated with utility construction and structures. The document details quality assurance requirements, including PennDOT and ASTM testing standards, submittal requirements for certifications, job conditions regarding traffic control and utility protection, and specific material requirements for pipe bedding and embedment.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 31 37 16 - Energy Dissipator: Technical specifications for the installation of Rock Energy Dissipators. The document outlines quality assurance standards based on Pennsylvania Department of Transportation Publication 408, material requirements for rock and Class 1 geotextile fabric, and execution procedures for preparation, installation, and restoration.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 13 13 - Portland Cement Concrete Paving: Technical specifications for Portland Cement Concrete Paving, covering the installation of concrete sidewalks, curbs, and driveway aprons. The document details quality assurance standards (ACI, ASTM, PennDOT), material requirements for forms and reinforcement, concrete mix criteria (Class A, 3,000 psi at 28 days), and execution procedures for subgrade preparation, forming, and finishing.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 92 00 - Finish Grading, Seeding, and Sodding: Technical specifications for finish grading, seeding, and sodding. The document outlines requirements for topsoil quality, fertilizer and lime standards, seed mixtures, and sod installation. It includes detailed execution procedures for subgrade preparation, topsoil placement, and specific timing for seeding operations, referencing Pennsylvania Department of Transportation Publication 408.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 93 02 - Landscaping: Technical specifications for landscaping work, including the planting of trees, shrubs, and ground covers. The document details requirements for quality assurance, regulatory compliance (ANSI and USDA), harvesting, delivery, storage, environmental constraints, and an 18-month warranty. It also specifies requirements for topsoil composition and organic soil amendment materials.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 33 41 00 - Storm Drain Pipe: Technical specifications for the installation of storm sewer pipelines. The document details quality assurance standards (AASHTO, ASTM, and PennDOT Publication 408), submittal requirements, and material specifications for corrugated galvanized steel, non-reinforced concrete, reinforced concrete, and smooth-lined corrugated polyethylene pipes. It also provides execution instructions for trench preparation, pipe laying, and backfilling.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 33 44 14 - Storm Inlets, Catch Basins, Trench Drains and End Sections: Technical specifications for the installation and materials of storm drainage curb inlets, catch basins, trench drains, and end sections. The document outlines quality assurance standards (ASTM and PADOT), approved manufacturers, submittal requirements, and detailed execution instructions for excavation, construction, and backfilling.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Village Green Detention Basin Restoration - List of Drawings: A list of drawing sheets for the Village Green Detention Basin Restoration project, identifying sheets 1-2 as the restoration plans.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Village Green Detention Basin Restoration Plans: Technical plans and specifications for the restoration of the Village Green Detention Basin. The document contains engineering drawings and design details necessary for the procurement of restoration services.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Village Green Detention Basin Restoration Plans: Technical plans and specifications for the restoration of the Village Green Detention Basin.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Organization & Contact Information
Show more
AgencyPennsylvania → Brown Township Municipal Authority, Mifflin County
Online sealed bids for the construction of WWTP Blower Replacement - Electrical Improvements will be received by Brown Township Municipal Authority via the PennBid Program (pennbid.bonfirehub.com) until Tuesday, May 13, 2025 at 11:00 am local prevailing time; at which time said bids will be publicly opened and read aloud.
Copies of the Contract Documents may be obtained at no cost at pennbid.bonfirehub.com.
All questions about the meaning or intent of the Contract Documents shall be submitted via PennBid’s Public Q&A section. No questions will be accepted by phone, fax, or direct e-mail.
Each bidder must deposit, with the bid, Security in the amount of 10 percent of the bid and subject to the conditions provided in the Instructions to Bidders.
The work in connection with this project constitutes a Public Works by a Public Body under Pennsylvania Prevailing Wage Act. Bidders are advised that prevailing minimum wage rates, promulgated by the Pennsylvania Secretary of Labor, which must be paid to workmen employed on this project, are incorporated in the Contract Documents.
All bids shall remain irrevocable for sixty days after the actual date of the opening thereof unless award is delayed due to the required approval of another government agency, the sale of bonds, or the award of a grant or grants; in which case, bids shall be irrevocable for one hundred twenty days in compliance with Act 317 of 1978 approved November 26, 1978, as amended.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award