This Solicitation opportunity from Maryland was posted on September 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The City of Bowie, Maryland, is soliciting bids for the removal and replacement of the existing concrete sludge pad at the Public Works Department Wastewater Treatment Plant located at 16550 Annapolis Road. The project, identified as C27_010, requires the demolition of the current pad and the installation of a new 4,000 psi reinforced concrete slab measuring approximately 81 feet 1.5 inches by 80 feet with a nominal thickness of 8 inches. Key technical requirements include a compacted CR-6 stone base, #4 reinforcing bars spaced 24 inches on center, and a durable, slip-resistant finish. The pad must be sloped from the edges to the centerline to ensure proper drainage.
The contract features a strict performance timeline, requiring substantial completion within 7 calendar days from the Notice to Proceed, with work hours restricted to 8:00 a.m. to 4:00 p.m., Thursday through Wednesday. Bidders must submit their proposals electronically via Bid Locker by November 5, 2026, following a mandatory pre-bid meeting on October 15, 2026. The award will be granted to the lowest responsive and responsible bidder. Required submission documents include a 5% bid bond, bid certification, EEO and drug-free workplace certifications, an affidavit of public contracting eligibility, a contractor responsibility questionnaire, a reference list, and an Experience Modification Rate form with OSHA 300 logs.
Upon award, the contractor must provide performance and payment bonds and submit a safety plan within 10 days of the Notice to Proceed. Payment is based on an approved schedule of values in AIA format, with a 5% retainage withheld from each estimate until the project is 95% complete, and the final 5% released upon final acceptance. The contractor is responsible for adhering to ACI recommendations for concrete curing and complying with all OSHA and MOSH safety regulations.
General Info
Bowie, Maryland seeks bids to replace a concrete sludge pad by November 5, 2026.
HighAI Summary for City of Bowie - Instructions to Bidders (WWTP Sludge Pad Replacement): Revised January 2, 2024, this document provides the Instructions to Bidders for the City of Bowie, Maryland, Department of Public Works regarding the WWTP Sludge Pad Replacement project. It outlines bid submission requirements via Bid Locker, mandatory attachments (Bid Certification, EEO, etc.), bid security requirements (5% bid bond), and the process for bid opening and contract execution.
PDF
PDF, High priority: read this first16 pages · specifications
HighAI Summary for City of Bowie Sludge Pad Replacement - Division 1 and Specs: Dated July 23, 2026, this document contains the Division 1 General Requirements and technical specifications for the Sludge Pad Replacement project (C27_010) at the City of Bowie Wastewater Treatment Facility. It outlines the scope of work, a strict 7-calendar day completion schedule, work hour restrictions, waste disposal requirements, and administrative procedures for payment, submittals, and project closeout.
PDF
PDF, High priority: read this first10 pages · contract-document
HighAI Summary for City of Bowie - Wastewater Treatment Plant Sludge Pad Replacement Agreement: A formal agreement between the City of Bowie, Maryland, and a contractor for the Wastewater Treatment Plant Sludge Pad Replacement. The document outlines the scope of services, incorporation of bidding documents, payment terms, political contribution disclosures, and insurance requirements. It specifies a completion timeline of 7 calendar days from the Notice to Proceed.
PDF
PDF, High priority: read this first1 page · ifb
HighAI Summary for City of Bowie - Wastewater Treatment Plant Sludge Pad Replacement IFB: Invitation for Bids (IFB) issued by the City of Bowie, Maryland, for the removal and replacement of the existing sludge pad at the Public Works Department Wastewater Treatment Plant. The document specifies a mandatory pre-bid meeting on October 15, 2026, a deadline for clarifications by October 22, 2026, and a final electronic bid submission deadline via Bid Locker by November 5, 2026.
PDF
PDF, High priority: read this first1 page · bid-certification
HighAI Summary for City of Bowie - WWTP Sludge Pad Replacement Bid Certification: A bid certification form for the City of Bowie's Wastewater Treatment Plant (WWTP) Sludge Pad Replacement project. The document requires the bidder to certify the accuracy of their submission via the Bid Locker platform and provide company details, including legal structure, Federal ID number, and contact information.
PDF
PDF, High priority: read this first1 page · experience-modification-rate-form
HighAI Summary for Experience Modification Rate Form 2026: This document is the Experience Modification Rate (EMR) Form for 2026, to be completed and submitted with a bid or proposal. It requires the bidder to provide OSHA 300 form data for 2023-2025, including man hours, cases involving days away or restricted activity, DART rate, and serious OSHA violations. The form also requests the company's NAICS code, safety program administrator, and insurance EMR for the past three years. Attachments of OSHA 300 and 300a forms are required. The form includes signature and company information fields.
PDF
PDF, High priority: read this first1 page · past-performance
HighAI Summary for Reference List Construction - Fillable: A fillable reference list form requiring bidders to provide details on similar construction experience, including structure type, year constructed, owner information, and contact details. Completion of this form is mandatory to avoid bid rejection.
PDF
PDF, High priority: read this first3 pages · sow
HighAI Summary for Sludge Pad Replacement - Scope of Work (C27_010): Scope of Work for City Project Number C27_010 involving the demolition and replacement of a concrete sludge pad (approx. 82' x 42' x 8'') at the City's Wastewater Treatment Plant. The document details requirements for mobilization, demolition, subgrade preparation with CR-6 stone, installation of 4,000 psi reinforced concrete, and includes two add-alternate options for aluminum oxide aggregate finishes.
PDF
PDF, High priority: read this first6 pages · specifications
HighAI Summary for Supplemental Conditions: This document outlines the Supplemental Conditions for a City procurement project. It details requirements for site examination, the nature of approximate quantities, procedures for change orders and extra work (including force account payment terms), protocols for deleted work, and guidelines regarding proprietary articles to ensure competition.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Wastewater Treatment Facility Sludge Pad Replacement Plan View: Technical drawing and plan view for the Sludge Pad Replacement at the Wastewater Treatment Facility (Project No. C27_010), dated 07/23/2026. The document provides specific dimensions for the concrete pad (81'-1 1/2 x 80'-0), bin sizes, drainage requirements, and nominal thickness of 8 inches.
PDF
PDF, Low priority2 pages · bid-bond
LowAI Summary for Bid Bond - Wastewater Treatment Plant Sludge Pad Replacement: A standard bid bond template for the City of Bowie, Maryland, regarding the Wastewater Treatment Plant Sludge Pad Replacement project. It outlines the legal obligations of the Principal and Surety to ensure the contract is entered into and performed upon bid acceptance.
PDF
PDF, Low priority2 pages · affidavit
LowAI Summary for City of Bowie Affidavit of Public Contracting Eligibility: A legal certification form for bidders/offerors submitting proposals to the City of Bowie, Maryland. The document requires the bidder to attest to non-collusion, lack of criminal convictions related to bribery or antitrust laws, absence of debarment, and compliance with Maryland state laws regarding investment activities in Iran.
PDF
PDF, Low priority1 page · certification
LowAI Summary for City of Bowie - Equal Opportunity Employer and Drug Free Workplace Certification: A certification form for the City of Bowie, Maryland, requiring bidders to affirm compliance with equal opportunity employment laws and drug-free workplace policies.
PDF
PDF, Low priority2 pages · payment-bond
LowAI Summary for City of Bowie - Payment Bond - Wastewater Treatment Plant Sludge Pad Replacement: A template for a Payment Bond for the Wastewater Treatment Plant Sludge Pad Replacement project for the City of Bowie. The document outlines the legal obligations of the Contractor (Principal) and the Bonding Company (Surety) to ensure payment to laborers and material suppliers.
PDF
PDF, Low priority2 pages · past-performance
LowAI Summary for Contractor Responsibility Form - Construction: A standard contractor responsibility questionnaire used to evaluate a bidder's financial stability, business history, equipment capacity, and past performance on large-scale construction projects. Updated 5.4.23.
PDF
PDF, Low priority2 pages · performance-bond
LowAI Summary for Performance Bond - Wastewater Treatment Plant Sludge Pad Replacement: A legal performance bond template for the City of Bowie regarding the Wastewater Treatment Plant Sludge Pad Replacement project. The document outlines the obligations of the Contractor (Principal) and the Bonding Company (Surety) to ensure the project is completed according to contract terms.
The City of Bowie, Maryland requests bids from qualified and experienced contractors for the removal and replacement of the existing sludge pad, located at the Public Works Department Wastewater Treatment Plant, 16550 Annapolis Road, Bowie, Maryland.