Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Y--Boiler Plant Lintel Repair A/E

Active
36C24619Q0370Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The VHA Network Contracting Office 6 is conducting a sources sought notice to identify qualified Architect/Engineer (A/E) firms to provide professional services for the repair of structural beams and support systems at the Boiler Plant Building 15 located at the Hampton VA Medical Center. This notice is for market research only and does not represent a solicitation; no contract or payment will result from responses. The project budget is estimated at $300,000, and work includes site investigation, architectural design, condition assessment, construction drawings and specifications, third-party estimates, construction administration, and infection control risk assessments. A thorough evaluation of existing conditions, including hazardous materials and asbestos surveys, is required, with design submissions following specific milestones from schematic design through construction documents. The A/E must develop bid alternatives to reduce costs if estimates exceed the budget and ensure designs adhere to life safety and infection control standards while minimizing disruption to medical center operations. Selected firms will provide construction period services for up to five years, including review of contractor qualifications, submittal evaluations, site inspections, and final acceptance inspections with punch lists. The A/E must perform field verifications, site visits, and prepare as-built drawings and updates to the VA’s building database. Firms must demonstrate relevant qualifications, experience, capacity, past performance, and proximity to the project within 500 miles of Hampton, VA. Responses must be submitted in writing by the specified deadline, including company information, SAM registration status, NAICS code, socio-economic size status, and a capabilities statement. This effort seeks to ensure the government identifies capable firms capable of managing the technical complexity and administrative requirements of the project.

General Info

Seeking qualified A/E firms for structural repairs at Hampton VA Boiler Plant, budget $300,000.

Agency

N/A

NAICS

541330 - Engineering Services

Place of Performance

Department of Veterans Affairs;100 Emancipation Drive;Hampton VA 23667 23667 USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSources Sought
Posted

Sources Sought

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyN/A
ContactsNo contacts available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
THIS IS A SOURCES SOUGHT NOTICE ONLY. This notice does NOT constitute a request for proposal, request for quote, or invitation for bid. No formal solicitation document exists at this time. We are seeking information for market research purposes only. The Government will not pay for any information solicited. The VHA Network Contracting Office 6 (NCO 6) is conducting a market survey to find qualified Architect Engineers (AE) Repair Structure at Boiler Plant Building 15 for the Hampton Department of Veterans Affairs Medical Center (VAMC), 100 Emancipation Drive, Hampton VA 23667. The Estimate Cost of Construction for this project is $300,000. The proposed NAICS 541330 is applicable to this acquisition; with a size standard of $15 Million. -- Services -- Provide professional Architect/Engineer services to include: Site investigation Architectural Design Condition Assessment Construction drawings and specifications Third party construction estimates Construction period services Construction Final Inspection Conduct Infection Control Risk Assessment (ICRA) in conjunction with VA Safety/Infection Control staff -- Project Scope -- SCOPE: Provide A/E services for the Evaluation, Design and Construction Period Services of the Boiler Plant Foundation Building 15 design structural beams and support system repairs, as required. This project will include an investigation by the A/E to determine the condition of the beams and support structures to identify deficiencies. The A/E shall conduct a hazardous material and asbestos survey in the tunnel area to identify any presence of these materials and supply a report as part of the 35% design submission. Design for a construction budget of $300,000. Completed design shall result in a cost that is within the budget limitations. To ensure this, the A/E shall set up one or more bid deduct alternatives totaling 10% of the construction cost. If the base bid cost exceeds budget, and deduct alternates do not bring the project within the construction budget, the A/E shall re-design or take necessary steps to reduce the cost so that budget limitations are not exceeded. The Architect/Engineer shall make a thorough investigation of the existing site. Existing conditions shall be determined by verifying information from field investigations and any documentation that may be available. A survey shall be conducted to obtain sufficient information to permit designers to develop a detailed cost estimate and schematics. The entire Veterans Affairs drawing files will be made available and accessible along with reproduction materials, but the A/E shall provide the manpower to reproduce prints. AutoCAD drawings are also available for use, but are for reference only. This information is the best available, but the Government does not guarantee its accuracy or completeness. The A/E investigation of field conditions shall be performed in a competent, professional manner in accordance with Architectural Design Manual PG 18-10. Incorporate in the preliminary drawings the pre-construction risk assessment/evaluation as the sample shown below. PRE- CONSTRUCTION RISK ASSESSMENT/EVALUATION PROJECT NAME____________ PROJECT NUMBER______________ EXPECTED IMPACTS PLANS/MEASURES TO ADDRESS IMPACTS UTILITY/ESSENTIAL SERVICES OUTAGES - VIBRATIONS - DUST (INFECTION CONTROL)/AIR QUALITY - NOISE - EQUIPMENT - CREATION OR SPREAD OF CONTAMINANTS - TRAFFIC FLOW--PATIENTS, VISITORS, STAFF, CONTRACT PERSONNEL - LIMITS OF CONSTRUCTION, BARRIER LOCATION - Provide bound specifications and 100% construction drawings with all xref s bound. Construction documents will be required to be furnished in hard copy, electronic .dwg files (AutoCAD 2018 or most current at the time of final design submission) and electronic .pdf files. All AutoCAD drawings (including subcontractors) shall be in an organized drawing file system using its Project Browser/Navigator . Cost estimates detailing quantities of materials, labor, profit, overhead, insurance, taxes, etc. in the format found at http://www.cfm.va.gov/contract/aedessubreq.asp Life safety and infection control will be taken into account during all phases of design. Final construction documents will detail measures to be taken by the contractor to assure life safety and infection control. A preconstruction risk assessment will be completed and included in project submissions. Plans for phasing construction to minimize impact on the medical center will be incorporated into the construction documents. Plan construction to include impacts on the medical center such as relocating patient and staff equipment, providing temporary barriers, providing temporary utilities, minimizing impact on patient flow, etc. All design submissions will be submitted in accordance with the Program Guide PG-18-15, Volume C, for Minor/NRM projects. These submission requirements may be found at the following web site: http://www.cfm.va.gov/contract/aeDesSubReq.asp. Other applicable program guides can be found at http://www.cfm.va.gov/contract/ae.asp. Provide construction administration to include shop drawing and submittal review, site inspections, and RFI response. -- Site Investigations -- EXPECTATION: A/E shall make site visits as necessary to survey existing conditions. Make site visits as required to determine existing as-built conditions affecting this project. Note: Information, including drawings and other documentation, provided to the A/E is for reference only. All additional references and specifications are available in VHA s Technical Information Library at address http://www.cfm.va.gov/TIL/. A/E shall field verify every aspect that relates to the project. Coordinate visits with the Project Manager/Contracting Officer Representative (COR) as assigned after award. The A/E shall arrange for and oversee the performance of such investigations. Auto CAD architectural background drawings will be provided by the VA upon request, if available. The A/E shall field verify all dimensions, wall layouts, etc. A/E shall field verify every aspect that relates to the project. -- Design Review Schedule -- EXPECTATION: Submit review package so they are received on the noted day. Review Due Date (Calendar Days After NTP) Initial Project Design Meeting (PDT) 0 35% Schematic Design 60 VA Review 74 65% Design Development 119 VA Review 133 95% Construction Documents 163 VA Review 177 100% Construction Documents 192 Note: NTP will be issued at PDT meeting. A/E will be required to attend and take minutes of each Project Design Team (PDT) Meetings. Minutes will be submitted electronically to the Project Manager/COR and Contracting Officer within three calendar days of each meeting. -- Design Requirements/Submissions EXPECTATIONS: Submit complete review package in accordance with the following requirements and guidelines outlined in http://www.cfm.va.gov/contract/aeDesSubReq.asp. Please pay specific attention to the schematic, design and construction submission requirements. As appropriate, depending upon the complexity of the design, the A/E may elect to delete individual submissions where not required (i.e. Do not address A. Site Development, Landscaping for interior renovation projects) DELIVER: Schematic Design (35%): Provide proposed equipment, utility requirements, etc. Budget estimate for proposed with breakouts for equipment, materials, labor. Achieve a consensus on design approach before proceeding to 65% design. Complete Schematic Submission Checklist Design Development (65%): Address all comments from the Schematic Design Submission review. Complete Design Development Checklist Construction Documents (95%): Address all comments from the Design Development review. Submit a complete document of all contract requirements. The Cover Page shall be submitted separately for approval signatures. If necessary, update and submit until approved by the VA. Consolidate all necessary submittals by specification section on an Excel spreadsheet. Checklist to be utilized to track/monitor submittal process Complete Construction Documents Checklist Construction Documents (Bid documents): Address all comments from the Construction Documents review. Submit required numbers of hard copies as specified in A/E Submission Instructions document referenced above. -- Construction Period Services PROVIDE: Construction Period Services for a period of up to five (5) years. Assist the VA to determine whether the contractor or subcontractor meets qualification requirements, support by written recommendations of any problems or litigation encountered in past based on firsthand knowledge. Review all submittals and provide recommendations to the VA within fourteen (14) calendar days upon request. Review and provide replies to contractor generated RFIs when required by the project manager within seven (7) calendar days. Review contractor's cost estimates and provide recommendations to the VA. Make site visits on requests of the VA and prepare written reports to include agreed upon changes in design as determined necessary during the construction. Visits made based on errors and omissions in design will be at no cost to the VA. Participate in partial/final acceptance inspections as scheduled and generate punch list items for completion. The punch list shall reference the contract documents for specific deficiencies (i.e. specification section, drawing detail, etc.) Upon construction completion, red line drawings will be furnished to the A/E to prepare as-built drawings. Final as-built drawings will be furnished as master building drawings in a project manager format prescribed by the VA. Upon construction completion the new database will be updated to incorporate all upgrades with the installation date and the projected lifespan input into the database. During construction, the A/E shall allow for a minimum of 4 site visits as directed and scheduled by the COR. Provide up to 30 days of environmental air monitoring services during construction. The following evaluation criteria will be used during the A/E selection process: (1) Professional qualifications necessary for satisfactory performance of required services (2) Specialized experience and technical competence in the type of work required (3) Capacity to accomplish the work in the required time (4) Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules (5) Location in the general geographical area of the project and knowledge of the locality of the project (6) Reputation and standing of the firm and its principal officials with respect to professional performance, general management, and cooperativeness. (7) Record of significant claims against the firm because of improper or incomplete architectural and engineering services. (8) Specific experience and qualifications of personnel proposed for assignment to the project and their record of working together as a team. Firms desiring consideration must have a working office within 500 miles of the Hampton, Virginia project location. All interested parties should respond, in writing via email to contact@example.gov No telephone inquiries will be accepted. In response, please include the following: Company/individual name Address Point of contact with email and/or phone number Information describing your interest Evidence of current SAM registration (see internet site: https://www.sam.gov for more information) DUNS number Proposed NAICS code (if different from above) Capabilities statement Company Socio-Economic SIZE (example large, small, SDVOSB, VOSB, WOSB etc.) Your response is required by 3:00 PM EST on Tuesday, March 12, 2019.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
On-Call Structural and Seismic/Disaster Engineering Services
Solicitation # FAS 2026-037
The City of Seattle Finance and Administrative Services Capital Development division is seeking to establish two on-call contracts for professional structural and seismic/disaster engineering services under solicitation FAS 2026-037. The selected consultants will provide technical expertise on an as-needed basis for small to medium projects throughout the planning, design, procurement, and construction phases, utilizing delivery methods such as Design-Bid-Build, Job Order Contracting, and the Small Works Roster. The scope of work includes structural engineering studies, seismic evaluations, confidence testing, fall protection design, and the preparation of construction documents stamped by a licensed engineer. All deliverables must adhere to specific CAD standards, including software compatibility with AutoCAD 2025.1.3 and AIA/US National CAD Standard V5. Eligible firms must be licensed to practice in Washington State and the City of Seattle, demonstrate experience with current code compliance, and provide three relevant projects completed within the last seven years. The contract features an initial one-year term with up to four optional one-year renewals, for a maximum duration of five years. Evaluation of proposals is based on relevant technical experience (40 percent), approach and methodology (30 percent), and an inclusion plan (15 percent) focusing on women and minority-owned businesses. Responses are due by December 2, 2026, via the OpenGov portal, with a target contract execution date of December 15, 2026. Consultants are required to maintain Commercial General Liability insurance and comply with various local and federal regulations, including ADA and City of Seattle labor ordinances.
Finance and Administrative Services

POSTED

about 14 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 15 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 16 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS