This Government Contract opportunity from Department Of Defense was posted on September 12, 2015. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y--C-44 Reservoir/STA Project, Contract No. 2, Martin County Florida

Awarded
W912EP14R0016Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Pennsauken Community Pool Improvements
Solicitation # 2026-BID-15
The Township of Pennsauken, New Jersey, is soliciting bids for the complete rehabilitation and improvement of the Pennsauken Community Pool under solicitation number 2026-BID-15. The scope of work includes significant structural improvements to the pool, the demolition and construction of the pool mechanical room, electrical upgrades, and the installation of plumbing and other general complex upgrades. Specific deliverables include reinforced concrete flooring and walls, sandblasting the pool interior, and the installation of two 25 by 25 foot shade structures. All work must adhere to the 2019 NJDOT Standard Specifications for Road and Bridge Construction, the Americans with Disabilities Act of 1990, and New Jersey Prevailing Wage Act requirements. Bids must be submitted electronically via the OpenGov Procurement Portal by November 10, 2026, at 10:30 AM. The contract will be awarded to the lowest qualified responsible bidder. Submission requirements include a bid bond of 10 percent not to exceed 20,000 dollars, a notarized Non-Collusion Affidavit, a Certificate of Non-Debarment, and signed acknowledgments for Addenda 01 and 02. The successful contractor must provide a performance bond within three days of the contract award. The initial contract period is one year, with a possible one-year extension upon mutual agreement. Payment will be processed through the Township Governing Body following certification by the Township Engineer and the submission of itemized invoices and certified payrolls.
Procurement

POSTED

about 16 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

The C-44 Reservoir/STA Project, Contract No. 2, located in Martin County, Florida, involves the construction of an above-ground reservoir and associated water management infrastructure to capture water from the C-44 Basin. The project features a 3,400-acre reservoir with a storage capacity of approximately 50,600 acre-feet, utilizing 50,000 linear feet of earthen embankment with soil cement surfaces and integrated drainage systems. Key structures include the S-402 discharge tower with slide gates and a service spillway, as well as the Western and Eastern Reservoir Perimeter Canals designed to manage surface runoff and seepage. Additional scope includes the construction of a 20,000-foot distribution canal to convey flows to the Eastern Storm Treatment Area Collection Canal, the completion of a project access road, and the installation of several cast-in-place box culverts for vehicular access. The contract also requires the installation of permanent power conduits, boat ramps, and a comprehensive monitoring network consisting of piezometers, groundwater monitoring wells, and settlement plates. This award was managed by the Department of Defense through the Jacksonville District.

General Info

Contract Value

$227,984,960.57

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

FL, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

10 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from Jan 8, 2015 to Jan 12, 2015. The notice description changed.

Notice updated

Response deadline changed from Jan 12, 2015 to Feb 12, 2015. The notice title changed. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Feb 12, 2015 to Feb 20, 2015.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Feb 20, 2015 to Feb 24, 2015.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Jacksnvlle
ContactsNo contacts available
OfficeJACKSONVILLE, FL, 32207-0019, USA
Office AddressJACKSONVILLE, FL, 32207-0019, USA
ContactsNo contact information available

Full Description

Show more
The C-44 Reservoir/STA Project, Contract No. 2, Martin County Florida project includes a Base Bid with Options for soil cement (In place) - utilizing off-site aggregate. The work includes an above-ground reservoir, discharge canal, and associated structures to capture water from the C-44 Basin. Specific project components include the following items and incidental related work: The remaining portion of the Project Access Road from the termination of the portions of the road built by others. A reservoir (D-400) comprised of approximately 50,000 linear feet of earthen embankment with a soil cement crest surface and soil cement facing on the interior embankment face. Additional embankment components include an internal inclined sand chimney drain and horizontal blanket drain with pipes running parallel to the embankment with discharge points draining to a swale, and a 3-feet wide trench drain of sand and drain pipes running parallel to the downstream toe of the embankment. The approximately 3,400 acre reservoir has a normal full storage level of 15 feet (EL 41 feet NAVD88) and provides approximately 50,600 acre-feet of storage capacity. A reservoir discharge tower structure (S-402) comprised of three (3) 7 feet by 7 feet slide gates to convey a maximum of 1,100 cubic feet per Second (cfs) (600 cfs under normal operations) through two 7 feet by 7 feet cast-in-place box culverts (with operable slide gates) to the system discharge canal. The structure also includes a service spillway capable of conveying 810 cfs for emergency discharges and a 50 cfs low reservoir stage withdrawal pump. The Western Reservoir Perimeter Canal (WRPC) (C-400W) is approximately 35,000 linear feet in length, paralleling most of the northern, western, and southern extent of the reservoir embankment. The WRPC maintains a bottom width of 5 feet for a majority of the canal with a transition from 5 feet to 25 feet along the south side of the reservoir. The canal bottom is constant at EL 12.0 foot NAVD88 for the majority of the canal. The canal includes a 1.5 ft thick sand filter below normal water level along the side slopes and bottom of the canal. The WRPC will be used to transmit surface runoff, seepage flow from the embankment internal drain and the trench drain systems. WRPC spillway (S-403) is a 50 foot wide spillway which discharges to the intake canal with a crest elevation of 18 feet NAVD88 and a 1,100 cfs capacity. The Eastern Reservoir Perimeter canal (ERPC) (C-400E) approximately 15,000 linear feet in length paralleling the eastern embankment of the reservoir. The canal maintains a bottom width of 5 feet at an elevation of 12 feet NAVD88. The canal includes a 1.5 ft thick sand filter below normal water level along the side slopes and bottom of the canal. The ERPC is designed to convey runoff and seepage from the embankment internal drain and the trench drain system. The termination of the ERPC includes a drop-inlet drainage structure (S-419) to convey water from the ERPC to the Intake Canal. The discharge canal conveys flows from the reservoir through the Distribution Canal (C-401N and C-401S) to the Eastern Storm Treatment Area (STA) Collection Canal (C-402E); note; only a portion of this canal will be built as part of this contract, which will be connected to a portion being constructed by others. The canal maintains a bottom width of 10 feet, a bottom elevation of 18.5 feet NAVD88, and a normal operating elevation of 28-29 feet NAVD88 with a design conveyance capacity of 1,100 cfs. One side of the Distribution Canal includes STA berms on one side; this berm will be built by others and the canal constructed under this contract will tie into those previously constructed slopes. The Distribution canal is approximately 20,000 feet in length. The installation of buried conduits for permanent power for the reservoir discharge structure, connecting to conduit being placed by others. The installation of several cast-in-place box culverts (S-420A, S-420B) in various locations around project footprint to provide vehicular access across canals. Additionally, the reservoir embankment includes the construction of several boat ramps for access to the reservoir interior. The installation of embankment piezometers and associated conduit and Remote Terminal Units (RTUs) to transmit data back to the future pump station, as well as several groundwater monitoring wells to do the same. The embankment crest includes the installation of settlement plates for long-term settlement monitoring.

More opportunities from Department Of Defense → W074 Endist Jacksnvlle

Same awarding agency

NAICS: 541620
New
Federal
Notice of Intent to solicit a single source – Fish and Macroinvertebrate (Nekton) Monitoring (St. Johns River)
Solicitation # W912EP-27-Q-1CTH
The U.S. Army Corps of Engineers, Jacksonville District, intends to award a sole-source contract to the Fish and Wildlife Research Institute of the Florida Fish and Wildlife Conservation Commission. The project focuses on nekton monitoring within selected zones and tributaries of the Lower St. Johns River in Northeast Florida. This effort is categorized under NAICS code 541620 for Environmental Consulting Services and is designed to assess the ecological impacts of a 2022 channel deepening project that increased the river depth to 47 feet to accommodate larger vessels for the Jacksonville Port Authority. The primary objective is to evaluate how changes in salinity and water quality resulting from the deepening affect the spawning, recruitment, and population dynamics of commercially and recreationally important species, such as blue crab, white shrimp, and red drum. Monitoring will specifically target critical habitats between river kilometers 14 and 48, as well as areas upstream of Julington Creek, to determine if shifting salinity gradients are impacting nursery habitats or resident freshwater species. This long-term sampling will provide the necessary data to gauge the overall environmental effects of the channel modifications on the estuary's nekton assemblages.
Environmental Consulting Services

POSTED

3 days ago

DEADLINE

in 12 days
View Details
NAICS: 237990
Federal
Tampa Harbor Improvements Industry Day
Solicitation # W912EP27Z1CUA
The U.S. Army Corps of Engineers, Jacksonville District, has issued a special notice for an Industry Day event scheduled for November 18, 2026, regarding the Tampa Harbor Improvements project. This notice is for preliminary planning purposes and is not a solicitation for proposals. The event aims to gauge the capabilities and interest of the construction community, including small businesses, for a requirement slated for a fiscal year 2028 award. The overall project is expected to span six contracts over an eight to ten-year period, with a construction magnitude estimated between 100 million and 500 million dollars under NAICS code 237990. The specific focus of this Industry Day is Contract 1, which involves construction dredging to deepen and widen various sections of the Tampa Harbor federal navigation channel. Key deliverables include deepening Cut-C (HB), Port Sutton Channel, Port Sutton Turning Basin, East Bay Channel, and Cut-D (HB) to 49 feet MLLW, the Port Sutton Terminal Channel to 44 feet MLLW, and East Bay Channel Extensions 1 and 2 to 41 feet MLLW. The scope includes widening the Port Sutton Channel, Port Sutton Turning Basin, and East Bay Channel, with an estimated dredging volume of 4.4 million cubic yards. All work will incorporate one foot of allowable overdepth, and dredged materials will be disposed of in the East Bay Placement Area, DMMA 2-D, and DMMA 3-D. Interested parties must be registered in the System for Award Management to be eligible for future awards.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS