Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on February 15, 2008. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y--Design and Construction Services for New Pier and Seawall Facilities at Iraqi Port of Umm Qsar

Closed
W917BK-08-R-0015Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 14 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The United States Army Corps of Engineers, Gulf Region South District, is seeking sources for design, construction, or design-build services to develop new pier and seawall facilities at the Port of Umm Qasr in Iraq. The project scope includes the construction of a 450-meter seawall, a 330-meter Phase I pier, and a 150-meter Phase II pier, along with necessary dredging and the paving of adjacent access and parking areas. The facilities must be designed to accommodate off-shore vessels, patrol ships, and patrol boats, with a final completion deadline of June 2009 and a preference for April 2009. Selected contractors will be responsible for providing comprehensive design services, including a Utility Master Plan, and full construction management. Construction requirements include providing all labor, materials, and equipment, as well as life support services, housing, and security for employees and government staff. The contractor must also implement quality control, provide a one-year warranty, and develop various operational plans, including health, safety, and contingency plans for vessel mooring.

General Info

US Army Corps of Engineers seeks design and construction for Iraq port facilities.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

U.S. Army Corps of Engineers, Iraq USACE GRS APO AE 09331, AE

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W076 Endist Expedition(provis)
ContactsNo contacts available
OfficeAPO, AE, 09366-0000, USA
Office AddressAPO, AE, 09366-0000, USA
ContactsNo contact information available

Full Description

Show more
SOURCES SOUGHT Subject: Design and Construction Services for New Pier and Seawall Facilities at Iraqi Port of Umm Qsar Date of this Source Sought Document: 15 February 2008 Closing Date for Receipt of Sources Sought Responses: 02 March 2008 Provide Responses to the E-mail Address: contact@example.gov Description of Requirement: The United States Army Corps of Engineers (USACE), Gulf Region South (GRS) District, is seeking information from Contractors in connecti on with a major US contract for Iraqi pier facilities at the Port of Umm Qasr, which is located in Iraq at the north end of the Persian Gulf, just north of the Iraq-Kuwait border. To view additional concept details and a video clip of an over flight of t he port, visit the following site: ftp://ftp.usace.army.mil/pub/grs/Port%20at%20Umm%20Qasr%20Over%20Flight/ Description of Project: The Contractor will be required to design and/or construct or design-build two piers and a seawall (concept dr awing attached) as described below: 1. A seawall of approximate length of 450m 2. A Phase I pier the approximate length of 330m (reference ftp-site drawing) 3. A Phase II pier with the approximate length of 150m (reference ftp-site drawin g) 4. Dredging to accommodate Max Draft dimensions provided below 5. Grade and pave adjacent access, lay down and parking areas to facilitate use of the piers including area lighting, vehicle shades, pavement markings and signage. 6. The final configuration and capacity of the piers shall facilitate moorage operations of the following types of ship: -- Off-Shore Vessel (OSV): Length O.A.=57.0m; Beam=11.0m; Max Draft=3.8m -- Patrol Ship (PS): Length O.A.=53.4m; Beam=8.1m; Max Draft=2.1 m -- Patrol Boat (PB): Length O.A.=34.1m; Beam=6.4m; Max Draft=1.8m 7. Complete construction no later than June 2009 with a preferred time of April 2009. Construction shall be executed to complete the Phase 1 Pier and Seawall prior to the Phas e 2 Pier to enable beneficial occupancy of the Phase 1 pier before April 2009. 8. Sources are being sought for: 8.a. Design services 8.b. Construction services 8.c. Design-Build services Description of Design: a. Complete the d esign. Submit the design for review at the 50%, 75%, and 100% stages of completion. The design will consist of project drawings and specifications. b. Participate in review meetings and incorporate appropriate review comments into design revisions. c. Provide a schedule for design through the 100% complete stage. d. Develop a Utility Master Plan (UMP) to include an assessment of existing; potable water distribution system, wastewater collection system, electrical power distribution system. The pl an shall also include an evaluation for system expansion. Description of Construction: a. Provide equipment, materials, and labor necessary to complete all required construction. b. Provide life support services for all employees and four (4) US Government staff. Life support services shall include housing, office space, food, and support logistics. c. Secure the project site and housing areas from unauthorized access. Provide on-site security for all personnel, equipment and material s at all times during construction. Ensure all employees possess appropriate MNF-I badges, required visas and work permits. Provide and maintain a current list of all workers on the site. d. Provide Quality Control for all construction activities. e. Provide and maintain a current construction schedule. f. Provide a one year warranty from final acceptance for all construction items. g. Provide As-Built drawings on electronic media. h. Provide a Commissioning Plan, Quality Control Plan, Healt h and Safety Plan, Life Support Plan, Security Plan and a Contingency Plan for temporary mooring of vessels in case pier facilities are not completed at the tim e of vessel delivery. Notes: 1. Capacities, dimensions, and quantities cited above for the design-build contract are approximate and subject to change. 2. The government will conduct a site visit during the contract solicitation period. 3. The government will assist the selected contractor(s) with site access and travel during the design and construction phases of this project. POC for this action is: MAJ J. D. Brands  email address: contact@example.gov

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS