Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on January 23, 2008. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y -- EWP PA

Awarded
AG2D37S080143Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 14 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

This emerging small business set-aside contract, solicitation number AG2D37S080143, involves a stream stabilization project at the Allen and Felicia Morin site in Lake Ariel, Pennsylvania. The scope of work requires shaping a 150-foot length of the eroded left bank of Middle Creek and installing R-7 riprap to a top-of-bank height averaging 7 feet to protect a residential home. The estimated value of the project is between 25,000 and 100,000 dollars. Prospective vendors must utilize the official government website for all plans, specifications, and bid materials. Requirements for the contract include Central Contract Registration, Online Certifications and Representations, and direct deposit, with a potential 20 percent bid bond on Standard Form 24. All riprap must strictly adhere to the provided size specifications.

General Info

Agency

N/A

Contract Value

$19,000

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Not specified

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Presolicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Tim SittigContract Specialist

Full Description

Show more
*** NOTICE TO REPUBLISHERS/CLIPPING SERVICES OF THIS INFORMATION. PLEASE REFER YOUR CUSTOMERS TO WWW.FBO.GOV FOR PLANS, SPECIFICATIONS, AND BID MATERIALS. THE POINT OF CONTACT SHOULD ONLY BE CONTACTED AFTER A REVIEW OF THE DOCUMENTS ON WWW.FBO.GOV. THESE PROJECTS ARE LOCATED PRIMARILY IN NORTHEASTERN PA. NONE ARE IN DAUPHIN COUNTY (HARRISBURG.) ALL VENDORS WHO CONTACT US WILL BE DIRECTED TO WWW.FBO.GOV THERE ARE NO BIDDER LISTS NOR LISTS OF PLAN HOLDERS*** EMERGING SMALL BUSINESS SET ASIDE (FAR 19.1007(C)) Stream stabilization projects: (DSR WA 06-015). The Allen & Felicia Morin site, located at 1658 Cortez Road, Lake Ariel, PA 18436 is adjacent to Middle Creek and has the following description of work; the damaged left bank (viewed downstream) is eroded and threatening the Morin home. Repairs consist of shaping a 150feet length of streambank and installing R-7 riprap to the top of bank that averages 7feet in height. See attached specifications and drawings for specifics. The magnitude of this projects is between $ 25,000 and $100,000 The site showing information is published on Page 32 of the Provisions and Clauses. Central Contract Registration, Online Certifications and Representations, and direct deposit are required for this contract. A 20% bid bond on a Standard Form 24 may be required, see Block 13.B below. The rip rap size to use on this project is the size specified on the rip rap specification. All other references to size are to be disregarded.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS