Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on September 25, 2006. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y -- Flood control construction

Awarded
AG-8C30-S-06-0019Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 8 hours ago

DEADLINE

in 5 days

AI Contract Overview

Show more

The USDA Natural Resources Conservation Service New Mexico State Office is seeking bids for the Truth or Consequences - Williamsburg Arroyos Watershed, Site 3C project, specifically Phase V of this flood control initiative. The scope of work involves extensive excavation for trapezoidal channels and the installation of gabion mattress lining, loose rock riprap, and grouted rock riprap. Additionally, the project requires the construction of reinforced concrete structures, including a broken-back inlet transition and multiple box conduits with associated wing walls. Further requirements include the installation of guard rails, chain link fencing, a twin-pipe culvert under Morgan Street, and rill erosion work. The project also entails the reinstallation and grouting of loose rock riprap downstream of the Arroyo 2 outlet under Interstate Highway 25. This unrestricted solicitation, identified by number AG-8C30-S-06-0019, has an estimated price range between 1,000,000 and 5,000,000 dollars.

General Info

Agency

N/A

Contract Value

$2,584,081.5

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

NM, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Joseph B. GraineyContracting Officer

Full Description

Show more
The USDA Natural Resources Conservation Service New Mexico State Office is requesting bids for flood control project identified as Phase V of the Truth or Consequences - Williamsburg Arroyos Watershed, Site 3C project. Work will include but may not be limited to the excavation required to construct trapezoidal channels and to install 275 feet of gabion mattress lining, 1,450 feet of loose rock riprap lining, and 515 feet of grouted rock riprap lining. Work will also include the excavation and backfill for installing reinforced concrete for a 48 foot long - broken-back inlet transition, a 67 foot long 3 barrel (each barrel 7 feet high by 6 feet wide) box conduit, a 101 foot long 2 barrel (each barrel 5.5 feet high by 6 feet wide) box conduit, and associated wing walls. All quantities listed in this announcement are approximates. Additional work will include the installation of guard rails throughout the project area, chain link fencing adjacent to an existing rectangular reinforced concrete channel, a twin-pipe culvert under Morgan Street just north of the existing floodwater retarding basin, rill erosion work on the west excavated basin side slope, and the reinstallation of loose rock riprap (and then grouted) immediately downstream of the Arroyo 2 outlet under Interstate Highway 25. This solicitation is unrestricted and the price range is between $1,000,000 and $5,000,000. The solicitation package is scheduled to be posted at http://www.fbo.gov on or about July 7, 2006.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS