Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on September 13, 2006. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y -- Installation well/well pump

Awarded
009-06Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236210
New
Federal
F-15EX 8-Bay Maintenance Hangar Complex-Industry Day
Solicitation # W50S8527H1CU0
The National Guard Bureau is seeking market intelligence for the construction of an aircraft maintenance hangar complex at Selfridge Air National Guard Base in Harrison Township, Michigan. This project supports 21 Primary Aircraft Authorization F-15 EX aircraft and is estimated to have a magnitude between 150 million and 200 million dollars. The scope includes the demolition of buildings 3, 5, 117, and 120, with new parking constructed in the footprints of buildings 117 and 120. The construction may be executed in three phases: Hangar 1, a 2-bay corrosion control and fuel cell hangar; Hangar 2, a 4-bay maintenance hangar; and Hangar 6, a 2-bay munitions and training facility. The project also requires necessary utility and infrastructure upgrades. The government is considering a fixed-price agreement utilizing an Other Transaction Agreement under the authority of 10 U.S.C. 2808a, with funding potentially provided in annual phases of approximately one-third of the total cost. Technical requirements include compliance with DoD antiterrorism and force protection standards, adherence to Air Force and base design standards, and specialized foundations to meet flood plain requirements. Design is anticipated to be 100 percent complete by early 2027. This notice is for planning purposes only and is not a formal solicitation. Interested firms under NAICS code 236210 must provide company details, bonding capacity, and evidence of experience with aviation facilities and constrained-site construction to the designated points of contact by the response deadline of December 1, 2026.
W7NF Uspfo Activity Miang 127

POSTED

2 days ago

DEADLINE

in about 1 month
NAICS: 236210
New
SLED
Facilities & Parks New Supply Warehouse Building
Solicitation # ITB FM 04-27
The Board of County Commissioners of Okaloosa County, Florida, is soliciting bids under ITB FM 04-27 for the construction of a new 9,000 square foot metal supply warehouse for the Facilities and Parks Department located at 5489 Old Bethel Road in Crestview. The project involves comprehensive site preparation and construction, including the installation of energy-efficient HVAC systems, electrical and plumbing work, and telecommunications wiring. All work must comply with the 2023 8th Edition Florida Building Code, ADA standards, and OSHA regulations, with specific structural requirements to withstand 160 MPH ultimate wind speeds. A fire alarm system is explicitly not required for this project. Bids must be submitted electronically via OpenGov by November 4, 2026, at 3:00 pm CST. The contract will be awarded to the responsive and responsible vendor with the lowest bid, though the County reserves the right to negotiate the most advantageous agreement. The selected contractor must provide a dedicated project manager and furnish both bid and performance bonds. The project timeline is 12 months from the notice to proceed. Payment will be processed through the County Finance Office in accordance with the State of Florida Local Government Prompt Payment Act, contingent upon annual appropriation. For projects involving federal grant funding, contractors must be registered in SAM.gov and comply with Buy America and Trafficking Victims Protection Act requirements.
Facilities & Parks

POSTED

7 days ago

DEADLINE

in 5 days

AI Contract Overview

Show more

This contract outlines the requirements for installing a new eight-inch deep well, estimated at 300 feet, at the Woodstock Job Corps Center in Maryland. The project includes the installation of a submersible pump capable of providing a minimum of 80 GPM, a two-inch supply line to the existing pump house, and all necessary electrical work and controls. The contractor is responsible for providing all labor, materials, and equipment, including the installation of a pitless adapter, well vent, and the integration of new controls that monitor water levels in the existing pre-storage tank. All work must comply with Maryland Department of the Environment regulations, the National Plumbing Code, and the National Electrical Code. Key requirements include a hydrostatic pressure test of 150 psi for one hour, thorough disinfection of the well, and adherence to Davis Bacon Act Wage Requirements. The contractor is responsible for all permits and sediment control. The contract provides a one-year warranty on materials and labor, with a five-year warranty specifically for the well pump motor.

General Info

Agency

N/A

Contract Value

$47,775

NAICS

236210 - Industrial Building Construction

Place of Performance

Not specified

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Combined Synopsis

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
ContactsNo contacts available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
WOODSTOCK JOB CORPS CENTERSCOPE OF WORK INSTALLATION OF A NEW EIGHT INCH (8) WELL, WELL PUMP, WATER SUPPLY LINE AND ASSOCIATED ELECTRICAL WORK The intent of this scope of work is to provide construction services to drill a new eight inch deep well and pump to provide a minimum of 80 GPM of water. This scope is based on a 300ft well. 1.1 Scope of Work: A: This project consists of but is not limited to the installation of a new deep well, pump, associated electrical work and the installation of a two (2) inch supply line to the existing pump house. B: The contractor shall furnish all labor, materials, equipment and services necessary to complete the project in its entirety according to this scope of work. C: The contractor shall supply and install 8 - steel well casing. D: The contractor shall grout the new well casing. 1.2: Location: A: The project is located at the Woodstock Job Corps Center at 10900 Old Court Rd, Woodstock Md 21163. 1.3: Site Visitations: A: The contractor shall visit the site and familiarize himself with the conditions under which the work will be performed. No allowance will be made for any error on the contractors part for failure to take into account any conditions or circumstances existing at the site which might affect the contemplated work. The fact that a bid is submitted will be taken as evidence that the contractor has full knowledge of the extent and character of the contemplated work and the problems to be encountered in performing same. 1.4: Regulations: A: All work under this contract shall conform with applicable sections of the general specifications for the design of wells of the State of Maryland, Department of the Environment Regulation ( Well Construction ) the National Plumbing Code, Maryland Department of Licensing and Regulations and the National Electrical Code. B: The contractor shall install all sediment control fences and structures as required to conform with all current Maryland Department of the Environment regulations regarding sediment and erosion control. 1.5: Permits: A: The contractor shall, at his own expense, procure all permits, certificates and license required of him by law for the execution of his work. 1.6: Well Pump, Motor and Controls: A: The deep well pump shall be capable of pumping a minimum of eighty (80) GPM against a total dynamic head of 650-feet. B: The pump shall be of the submersible type with built-in lighting protection and 3 phase, 208 volts. C: Pump shall be furnished with a compatible magnetic starter as part of the well pump package. Pump shall be as manufactured by Goulds or approved equal. D: The pump shall be set a minimum distance of 10-feet from the bottom of the well in accordance with COMAR Regulations. E: The contractor shall supply and install a new well controls for the new well and also the existing well. The new controls shall work off the water levels in the existing pre-storage tank located in the Boiler Room in Bldg #9. The new well controls shall have signal lamps too show when the wells are running. 1.7: Electrical Connections: A: The contractor shall tie the new well pump into the existing service from the 2 older wells. 1.8: Pitless Adapter: A: The contractor shall supply and install a pitless adapter in the well casing for connecting the 2 inch vertical well pump discharge line to the 2 inch horizontal discharge line. B: The adapter shall consist of a male to female slide connection which will form a positive seal. C: The adapter shall be brass and attach to the well casing with inner and outer seals, brass collar and nut to insure a positive seal. D: The pitless adapter shall be as manufactured by Martinson or equal. 1.9: Well Vent: A: The contractor shall vent the well by installing a device in the well cap which will prevent the entrance of surface water, dust, insects or other foreign material from entering the well while allowing for pressure changes within the well due to pumping. 1.10: Well Discharge Pipe: A: The vertical discharge pipe extending from the pitless adapter to the well pump shall be 2 inch schedule 40 galvanized steel piping. 1.11: Water Line: A: The water line (horizontal) shall extend from the pitless adapter to existing Pump House and connect to the existing water system piping. B: The contractor shall provide all piping, adapters and fittings as required to make the connection between the pitless adapter and the existing water line in the Pump House. C: The 2 inch water line shall be PVC water service tubing rated at 160 psi operating pressure. Fittings and adapters for connections shall be as recommended by the water service tubing manufacturer. D: The new water line inside the Pump House shall be minimum schedule 40 PVC pipe rated 200 psi working pressure. Fitting shall match pipe requirements. Joints shall be solvent-weld where applicable. The contractor shall provide adapters for connection to various valves, pipe and fitting materials in accordance with pipe manufacturer's recommendations. E: The valves shall be cleaned of all foreign matter, stuffing boxes tightened, and the valve fully opened and fully closed to ensure that all parts are in working condition before installation. F: The gate valves shall be class 125, all bronze construction, rising stem. Solid wedge gate with suitable adapters for installation in PVC pipe lines. G: The check valves shall be swing check type having a minimum working pressure of 200 psi. H: The contractor shall supply and install all supports and anchors as required to firmly secure the valves, pipe and fittings in the Pump House. 1.12: Testing: A: After the pipe is installed and joints have cured the new pipe line and fittings shall be subjected to a hydrostatic pressure test of 150 psi for a period of one hour. 1.13: Disinfection: A: Following completion of all construction and testing, the well shall be thoroughly disinfected in accordance with the Department of the Environment regulation. 1.14: Excavation, Utility installation and Backfill: A: The contractor shall perform all clearing, grading, excavation and backfill in accordance with the latest Maryland Department of the environment requirements for sediment and erosion control. B: No trench excavation shall be made in advance of the amount of pipe and electrical cable that can be laid in that workday. No excavation shall be left open overnight. C: The area within the confines of the well construction site and utility trench alignment shall be cleared only to the extent necessary to facilitate access and construction. D: All vegetative materials cleared, downed branches, limbs, etc. , shall be removed from the area and disposed of at an off site disposal site. 1.15: Trench Excavation and Backfill: A: The water line trench shall be excavated in a neat, workman like manner with sidewalls as nearly vertical as possible and with as minimal disturbance to adjacent areas and vegetation as possible. B: Water line and well pump electrical lines shall be installed in the same trench. Electrical lines shall be installed a minimum of 4 inches above the water line. Water line and Cables shall be bedded in a minimum of 4 inches of clean sand above and below the lines. C: The trench shall be excavated to a depth necessary to insure a minimum 42 inches of cover to the water line. D: Backfill shall consist of material removed from the trench except that no root matter, marl, debris, or rock 6 inches or larger in any direction, shall be allowed to be replaced as fill. Backfill shall be placed above the coving and bedding and be compacted. E: The contractor shall supply and install an appropriate marking tape over the electric lines. Tape shall be installed in the trench a minimum 6 inches below final grade. F: The top of the trench shall be limed, fertilized, seeded and mulched. 1.16: Demolition/Removal. A: The contractor shall verify location and extent of demolition required to accomplish the work. B: Construction debris must be removed from the site and construction area must be secured to the centers satisfaction at the end of each workday. 1.17: Rules. A: The contractor shall at all times abide by the centers rules and regulations. B: The contractor must meet the Davis Bacon Act Wage Requirements. 1.18: Warranty. A: All materials, services and labor shall be warranted free for a period of one year. B: Well pump motor shall be warranted free for a period of five years. 1.19: Bid Requirement. A: The contractor shall submit their bid in a Labor cost and Material cost format. 1.20: Site Plan. A: See site plan for location of new well. Please note that a walk-through will be conducted on August 25th 2006 @ 10:00am. Written bids should be submitted to me by COB on September 1st 2006. You may fax or e-mail your bids to +1 (555) 000-0000 or contact@example.gov. For additional information please contact Dave Bonsal, Maintenance Manager, @ +1 (555) 000-0000 or me DeNora Brown @ +1 (555) 000-0000. Please note that Adams and Associates, Inc., reserves the right to reject any bids and select the bid deemed most responsible. Bidders should be aware of bid requirements for federally funded projects and act accordingly.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS