Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Y--KNRI 257081 - Knife River Indian Village National Historic Site - Elbee Bend Bank Stabilization

Awarded
140P2026R0086Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Knife River Indian Village National Historic Site - Elbee Bend Bank Stabilization contract, identified by solicitation number 140P2026R0086, is a competitive negotiated request for proposal issued by the Department of the Interior through the DSC Contracting Services Division, with the National Park Service as the executing agency. The project involves comprehensive riverbank stabilization at the historic site, requiring the contractor to deliver all labor, materials, equipment, and services to execute earthwork operations, riprap and bedding, clearing and grubbing, topsoil application, seeding, and associated construction surveying and staking. This work must comply with strict archaeological protection, historic preservation, and safety protocols outlined in the specifications, and is governed by a detailed set of technical documents including specifications, geological investigations, geotechnical recommendations, permit conditions, and construction plans totaling over 500 pages. The project is classified under NAICS code 237990 and requires strict adherence to environmental sustainability standards, including use of recycled materials such as industrial paperboard and carrier board with minimum post-consumer content, preference for minimal and recyclable packaging per ASTM D5834, and coordination of deliveries to minimize on-site storage and prevent damage or deterioration. The contract includes a base bid with three lump sum line items covering mobilization/demobilization, embankment stabilization, and site restoration, plus two optional bid alternates for topsoil/erosion control and temporary access infrastructure, allowing funding flexibility. The estimated completion date is June 12, 2026, with performance required to be completed within 365 days of notice to proceed, subject to liquidated damages for delays and provisions for suspension of work and time extensions. Proposals must be submitted electronically no later than August 6, 2026, in two separate volumes: Volume I covering technical aspects including approach, schedule, project experience, key personnel credentials, management practices, and past performance, each organized under specific factor headings for evaluation; and Volume II containing pricing data, SF-1442 forms, and business certifications. Evaluation uses a best value continuum tradeoff process where technical and management factors carry equal weight and are approximately equally important to price. Offerors must be registered in SAM with a valid UEI, submit required representations and certifications, and demonstrate small business participation, with small businesses receiving maximum credit for this factor. Key personnel including a project manager, safety manager, and quality control manager are

General Info

Contract for heritage preservation and civil engineering at Knife River Indian Village, North Dakota, open to all contractors.

Contract Value

$7,529,000

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

CO, USA

Set-Aside

NONE

Award Issued Date

Documents

41

Amendment 0001 to Solicitation 140P2026R0086

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation 140P2026R0086

PDF, High priority: read this firstamendment
High

Amendment 0003 to Solicitation 14OP2026R0086

PDF, High priority: read this firstamendment
High

Amendment 0004 to Solicitation 140P2026R0086

PDF, High priority: read this firstamendment
High

Amendment 0005 to Solicitation 140P2026R0086

PDF, High priority: read this firstamendment
High

Amendment 0005 to Solicitation 140P2026R0086

PDF, High priority: read this firstamendment
High

Amendment 0006 to Solicitation 140P2026R0086

PDF, High priority: read this firstamendment
High

Amendment 0006 to Solicitation 140P2026R0086

PDF, High priority: read this firstamendment
High

Amendment 01 Answers to Questions for Solicitation 140P2026R0086

PDF, High priority: read this firstamendment
High

Amendment 01 B08 Section J Attachment 09 Small Business Subcontracting Plan

DOCX, High priority: read this firstsubcontracting-plan
High

Amendment 02 Answers to Questions for Solicitation 140P2026R0086

PDF, High priority: read this firstamendment
High

Amendment 02 Q&A for KNR1 257081 Knife River Indian Village Project

PDF, High priority: read this firstamendment
High

Amendment 02 to Solicitation 140P2026R0086 for Knife River Indian Village National Historic Site

PDF, High priority: read this firstamendment
High

Amendment 02 to Solicitation 140P2026R0086 Knife River Indian Village Bank Stabilization

PDF, High priority: read this firstamendment
High

Amendment 05 to Solicitation 140P2026R0086 for Knife River Indian Village National Historic Site

PDF, High priority: read this firstamendment
High

Amendment 06 to Solicitation 140P2026R0086 for Knife River Indian Village National Historic Site

PDF, High priority: read this firstamendment
High

B08 Section J Attachment 15 KNRI 257081 Q&A Document

PDF, High priority: read this firstq-and-a
High

Bid Bond Form for Solicitation B08

PDF, High priority: read this firstbid-bond
High

Geological Investigation Field Report for Knife River - Elbee Bend Bank Stabilization

PDF, High priority: read this firstgeotechnical-report
High

Geotechnical Recommendations Report for Knife River Elbee Bend Bank Stabilization

PDF, High priority: read this firstsow
High

IFB 140P2026R0086 Knife River Indian Village Bank Stabilization

PDF, High priority: read this firstifb
High

Knife River Elbee Bend Bank Stabilization Appendix D SWPPP and Inspection Records

PDF, High priority: read this firstsow
High

KNRI 257081 Knife River Elbee Bend Bank Stabilization Project Specifications Division 01

PDF, High priority: read this firstspecifications
High

KNRI 257081 Specifications Division 31 and 32 Earthwork and Topsoil

PDF, High priority: read this firstspecifications
High

KNRI Plan Set for Knife River Elbee Bend Bank Stabilization

PDF, High priority: read this firstconstruction-drawings
High

Pre-Solicitation Notice for RFP 140P2026R0086 Knife River Elbee Bend Bank Stabilization

PDF, High priority: read this firstpresolicitation
High

Proposed Equals Submission Form for Solicitation B08

DOCX, High priority: read this firstproposed-equals
High

Small Business Subcontracting Plan for Contract 140P202xxxxxxxx

DOCX, High priority: read this firstsubcontracting-plan
High

Solicitation 140P2025R00XX CLIN Price Sheet - Services

XLSX, High priority: read this firstclin-price-sheet
High

Solicitation 140P2026R0086 Contract Price Schedule

PDF, High priority: read this firstprice-sheet
High

Solicitation 140P2026R0086 Knife River Indian Village Bank Stabilization

PDF, High priority: read this firstifb
High

Solicitation 140P2026R0086 Knife River Indian Village Bank Stabilization

PDF, High priority: read this firstifb
High

Solicitation 140P2026R0086 Knife River Indian Village Bank Stabilization IFB

PDF, High priority: read this firstifb
High

Wage Determination for Heavy Construction in Mercer County, North Dakota

PDF, High priority: read this firstwage-determination
High

General References Form for Offerors

PDF, Low prioritygeneral-references
Low

Knife River Control Points Data

PDF, Low priorityother
Low

KNRI 257081 Pre-Bid Conference Sign-In Sheet

PDF, Low prioritypre-bid-conference-sign-in
Low

KNRI 257081 Pre-Bid Conference Sign-In Sheet

PDF, Low prioritypre-bid-conference
Low

Sovereign Land Permit SL2521 for Knife River Construction

PDF, Low prioritypermit-conditions
Low

Sovereign Land Permit SL2521 for Knife River Project

PDF, Low prioritypermit
Low

Attachment_20__Sheet_4_Site_Survey_0003.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

5 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Response deadline changed from Aug 6, 2026 to Aug 20, 2026. The notice title changed. The point of contact changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline time changed from 10:00 PM UTC to 11:00 PM UTC on Aug 20, 2026.

Awarded

Contract was awarded

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Dsc Contracting Services Division
Contacts1 person available
OfficeDenver, CO, 80225, USA
Office AddressDenver, CO, 80225, USA
Contacts

Full Description

Show more
KNRI 257081 - Knife River Indian Village National Historic Site - Elbee Bend Bank Stabilization

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 10 hours ago

DEADLINE

in 4 days
View Details

More opportunities from Department Of The Interior → Dsc Contracting Services Division

Same awarding agency

NAICS: 237110
New
Federal
Y--GRTE 237343 - Rehab 4 Lazy F Ranch
Solicitation # 140P2026R0098
Solicitation 140P2026R0098 is a Total Small Business Set-Aside for the rehabilitation of the historic 4 Lazy F Ranch in Grand Teton National Park, Wyoming, to provide employee housing. The project scope includes the comprehensive rehabilitation of one lodge, eight cabins, one garage, two outbuildings, and a water well structure. Key technical requirements involve structural repairs, historic preservation, and the installation of new potable water and wastewater systems, including a sanitary sewer collection system and lift station. The project is estimated to exceed 10 million dollars and has a mandatory negotiable performance period of 170 calendar days, with work beginning within 10 days of award. The procurement will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—technical approach, project experience, schedule, and past performance—are collectively equal in importance to price. Contractors must adhere to strict environmental and safety standards, including the management of lead-based paint and asbestos, compliance with the Davis-Bacon Act, and mitigation of impacts on bald eagle nesting and roosting bats. Proposals must be submitted electronically by November 20, 2026, and must include a detailed technical approach and a phasing plan to minimize park operational disruptions. Required insurance includes general liability of 500,000 dollars and employer liability of 100,000 dollars.
Water and Sewer Line and Related Structures Construction

POSTED

about 14 hours ago

DEADLINE

in 22 days
View Details
NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is a Small Business Set-Aside, Firm-Fixed-Price contract issued by the National Park Service for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. The project, identified as TIMU-335507, aims to repair and extend a seawall damaged by Hurricane Ian to protect critical cultural and ecological resources. The scope of work is divided into three primary CLINs: the installation of a new weatherable rigid vinyl sheet pile wall with tie rods in front of the existing wall, the extension of the wall eastward using structural FRP composite sheet piles, and comprehensive site restoration including excavation, backfilling, sodding, sea grass restoration, and the installation of limestone riprap. The estimated construction magnitude is between 1 million and 5 million dollars, with a mandatory performance period of 259 calendar days. Award will be determined using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, schedule, and management approach—are significantly more important than price. Contractors must adhere to strict environmental protection protocols to safeguard aquatic species, wetlands, and endangered wildlife, including manatees and sea turtles, in compliance with the Marine Mammal Protection Act and the Endangered Species Act. Additional requirements include adherence to the Davis-Bacon Act for prevailing wages, ADA compliance for public dock walkways, and the use of biodegradable or recyclable packaging. Proposals must be submitted electronically in two volumes by November 13, 2026, and include a bid bond and detailed past performance data.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 15 days
View Details
NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. A critical requirement is that the existing plant must remain in permitted operation until the new facility is accepted by the government, and the contractor must provide a 12-month operational support period. The contract is a firm-fixed-price acquisition with a magnitude exceeding 100 million dollars. The mandatory period of performance is 1095 calendar days, scheduled from February 1, 2027, to February 1, 2030. Award will be based on a multi-factor, best-value tradeoff process evaluating technical experience, technical approach, key personnel experience, and price. Required deliverables include a detailed commissioning plan covering startup sequencing, operator training, and regulatory coordination. The contractor must furnish performance and payment bonds and comply with union prevailing wage rates, Department of the Interior cybersecurity requirements, and ADA/ABA accessibility standards.
Sewage Treatment Facilities

POSTED

1 day ago

DEADLINE

in 20 days
View Details
NAICS: 237310
Federal
Z--BRCA 310427 Southbound Shuttle Stop
Solicitation # 140P2026R0065
Solicitation 140P2026R0065 is a small business set-aside for the construction of the Southbound Shuttle Stop at Bryce Canyon National Park, Utah. Managed by the National Park Service Denver Service Center, this firm-fixed-price contract has an estimated value between $1,000,000 and $5,000,000. The scope of work includes shuttle stop improvements, the addition of lanes, culvert installation, trail realignment, retaining wall construction, ADA ramp and sidewalk installation, and the placement of shelters and MUTCD-compliant signage. Due to the project's location, the contractor must implement protective measures for the adjacent UT Prairie Dog Habitat and ensure all equipment is clean and free of contaminants. The performance period is scheduled from May 1, 2027, to September 28, 2027, with a total duration of 150 calendar days following the notice to proceed. Award will be determined using the Best Value Continuum Tradeoff Process, evaluating technical approach, schedule, project experience, key personnel, and past performance alongside proposed pricing. Requirements include the submission of bid, performance, and payment bonds, compliance with Davis-Bacon Act wage determinations, and adherence to OSHA safety standards. Proposals must be submitted electronically in separate technical and price volumes, with a final response deadline of November 3, 2026.
Highway, Street, and Bridge Construction

POSTED

14 days ago

DEADLINE

in 5 days
View Details
NAICS: 237110
Federal
Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment
Solicitation # 140P2026R0091
Solicitation 140P2026R0091 is a firm-fixed-price construction contract issued by the National Park Service Denver Service Center to rehabilitate the Rainshed and Water Treatment System at Hawaii Volcanoes National Park. The project scope includes the rehabilitation of the rainwater catchment and water treatment systems, the replacement of Building 43 with a new metal building, and the replacement of Building 241 with a new open-air and CMU structure. Additional optional requirements include replacing the perimeter fence, repairing the water treatment system, and replacing ground catchment pavement. The project has a mandatory performance period of 610 calendar days, with primary CLINs scheduled from November 1, 2026, to July 3, 2028. The government will award the contract using a best value tradeoff process, evaluating non-price factors such as project experience, technical approach, management approach, and construction schedule against proposed pricing. Bidders must comply with the Davis-Bacon Act for prevailing wages and adhere to Buy American Act and Build America Buy America standards. Technical requirements include ADA compliance, the implementation of a Quality Control Plan, and adherence to specific environmental standards regarding ozone-depleting substances and recycled content. Due to the site's nature, the project involves Section 106 mitigation for historic buildings and requires careful construction phasing to ensure water production is not compromised. Proposals must be submitted electronically, and the awardee will be required to provide performance and payment bonds within 10 days of award.
Water and Sewer Line and Related Structures Construction

POSTED

17 days ago

DEADLINE

in 8 days
View Details
NAICS: 237310
Federal
Z--YELL 338223 - Bridge Preservation
Solicitation # 140P2026R0073
Solicitation 140P2026R0073 is a Small Business Set-Aside for bridge preservation services at Yellowstone National Park, Wyoming, managed by the National Park Service Denver Service Center. The project involves the rehabilitation of three specific bridges: Lava Creek, Thumb Creek, and an Unnamed Creek bridge. The scope of work includes concrete spall and structural repairs, crack sealing, stone masonry repointing, bridge expansion joint maintenance, painting of railings, and the application of epoxy overlays via hydro-demolition. Additional requirements include erosion repair, pavement markings, and strict traffic control. The anticipated period of performance is 155 calendar days from the Notice to Proceed, with an estimated contract value between $1 million and $5 million. The contract will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, project experience, key personnel, and past performance—are significantly more important than price. Required key personnel include a Site Superintendent with at least five years of experience and OSHA 30 certification, and a Traffic Control Supervisor with three years of experience meeting MUTCD standards. Contractors must adhere to strict work hour restrictions from 7 AM to 7 PM and comply with environmental protections for wildlife and cultural resources. Performance and payment bonds are required at 100 percent of the contract price, and the project is subject to Davis-Bacon Act labor standards. Proposals are due by October 30, 2026.
Highway, Street, and Bridge Construction

POSTED

17 days ago

DEADLINE

in about 18 hours
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS