This Solicitation opportunity from Department Of The Interior was posted on August 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y--USFWS FLINT HILLS NWR, KS - PUMP REPLACEMEN

Awarded
140FGA26Q0048Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Additional deliverables include the installation of new gravity sewers, manholes, and a fully operational pumping station equipped with mechanical and electrical systems, a generator, and odor control equipment. The project has an estimated value of 16,690,000 dollars. This solicitation is set aside for Small Businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone Small Businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation criteria focusing on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts and Table A. The agreement is based on EJCDC standard forms, requiring performance and payment bonds, as well as proof of insurance. Bids are due by November 10, 2026, with a final bid opening date of November 12, 2026. Contract administration involves monthly progress payments due 30 days after presentation to the owner, subject to review by the Engineer and the Resident Project Representative. The contractor must adhere to rigorous technical standards, including AWS D1.2 for welding and NEMA standards for motors. Materials must be delivered in original manufacturer packaging with specific labeling and storage requirements, such as maintaining a minimum ambient temperature of 45 degrees Fahrenheit for coatings. The project commences upon the issuance of a Notice to Proceed, which typically occurs within 30 to 60 days of the bid opening or effective date.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing, restoration, and the installation of FRP reinforcing systems. Mechanical and structural requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation of new slide gates and modifications to existing sluice gates. Additional technical tasks include the rehabilitation of reactor mixers and aerators, the installation and operation of a temporary 11 MGD pumped bypass, and extensive electrical and instrumentation upgrades, including the replacement of motor control center components. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of bid for reimbursement. Requested services and supplies include lead abatement, metals fabrication, painting and coatings, trucking and hauling, and the provision of access hatches. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. Submissions should be based on Garney Standard PO and Subcontract Forms, with any exceptions submitted as redlines.
Garney Pacific, Inc.

POSTED

about 2 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The U.S. Fish and Wildlife Service is seeking a small business contractor to replace a submersible pump and associated underground piping system at Flint Hills National Wildlife Refuge in Kansas, under solicitation number 140FGA26Q0048, which was posted on July 24, 2026, with proposals due by August 24, 2026. This is a Total Small Business Set-Aside under FAR 19.5, restricted to small businesses qualifying under NAICS code 237110 for water and sewer line construction. The project requires installation of a 5000 gpm, three-phase, single-stage submersible pump with a 30-foot head, operating at a 35–50 degree angle, connected to 12–15 inch corrosion-resistant piping made of fiberglass or stainless steel. The system must be VFD-controlled, include a flap gate at discharge, and be accompanied by a five-year warranty on parts and labor. All work must be completed within 80 calendar days of the Notice to Proceed, with materials delivered dry, undamaged, stored off the ground, and protected from moisture and environmental exposure. The contractor is responsible for all permits, labor, materials, and compliance with OSHA, EPA, and state and local environmental regulations, while the Refuge provides excavation equipment. Installation must occur without construction on weekends or federal holidays without prior written approval, and work must stop immediately if fossils or cultural materials are discovered, with notification required to the Contracting Officer. Contractors must submit detailed documentation including valid licenses, product data sheets, warranties, as-built drawings, and a completed submittal form; all materials and proposed alternatives require prior written approval from the Contracting Officer. Work will be inspected and accepted on-site at the refuge, approximately 2.5 miles north of Hartford, Kansas, only after the contractor certifies full compliance with all contractual requirements and the government confirms satisfactory performance. The Contracting Office is located in Falls Church, Virginia, with the primary point of contact being Thomas Ikner, while technical oversight is provided by Michael Wandersee, Mike Assenmacher, and TJ Cooper. No formal contract clauses, packaging standards, evaluation factors, pricing line items, or accounting data are included in the solicitation; the bid schedule containing estimated quantities is referenced but not provided. Payment terms, invoicing methods, and contract value remain unspecified, and no UEI or CAGE code submission is

General Info

Small business set-aside for pump and piping replacement at Flint Hills NWR, firm fixed price, 90-day performance, $100K–$350K.

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

VA

Set-Aside

SBA

Documents

8

A04_Maxwell_pump_SOW_06112026_1 - Statement of Work for Maxwell Pumping Station

PDF, High priority: read this firstsow
High

Amendment 0001 to Solicitation 140FGA26Q0048

PDF, High priority: read this firstamendment
High

Davis Bacon Wage Determination KS20260020

PDF, High priority: read this firstwage-determination
High

Flint Hills Indian Hills Pump Submittal Data 2021

PDF, High priority: read this firstsubmittal
High

Solicitation 140FGA26Q0048 Flint Hills NWR Pump Replacement Amendment 1

PDF, High priority: read this firstamendment
High

Solicitation 140FGA26Q0048 Pump Replacement at Flint Hills NWR

PDF, High priority: read this firstifb
High

Statement of Work for Flint Hills NWR Pump Replacement

PDF, High priority: read this firstsow
High

Statement of Work for Maxwell Pumping Station Flint Hills NWR Pump Replacement

PDF, High priority: read this firstsow
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Response deadline changed from Aug 24, 2026 to Aug 27, 2026. The notice title changed. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Sat Team 1 Fws
Contacts1 person available
OfficeFalls Church, VA, 22041, USA
Office AddressFalls Church, VA, 22041, USA

Full Description

Show more
USFWS FLINT HILLS NWR, KS - PUMP REPLACEMENT
Amendment 1: Updated Statement of Work, Added attachment with current pump information and testing.

More opportunities from Department Of The Interior → Sat Team 1 Fws

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS