Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of The Interior was posted on June 12, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y--MEVE-317500, Replace Morefield and Wetherill Water Lines, Mesa Verde National P

Closed
140P2025R0087Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction effort for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key station improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also requires the installation of new gravity sewers, manholes, and various site improvements including stormwater facilities, fencing, and paving. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 10, 2026, and must include a bid bond, a completed bid form, and evidence of authority to sign. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and insurance from companies with an A.M. Best rating of A-VII or better. Performance is measured by the Engineer's issuance of a Certificate of Substantial Completion, with technical adherence to AWWA, NEMA, AWS, and ASTM standards. Payment is processed via Applications for Payment and becomes due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 19 days

General Info

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

CO

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Dsc Contracting Services Division
Contacts1 person available
OfficeDenver, CO, 80225, USA
Office AddressDenver, CO, 80225, USA

Full Description

Show more
This is a Sources Sought Notice (SSN) for the purpose of conducting market research. Proposals are NOT being requested, nor accepted at this time. Responses are being requested from both large and small businesses. Purpose: The purpose of this notice is to gain knowledge regarding the type of interested businesses and their qualifications. The National Park Service (NPS) will use information obtained through this notice to develop an acquisition strategy. The Government anticipates conducting a competitive acquisition for this requirement. The amount of interest or lack thereof will determine the possibility of a small business or other socio-economical small business set-aside for the solicitation. Analysis of the quality of responses to this source sought announcement will be considered in the market research being conducted, and in the making of any small business set-aside determination for this requirement. Additional Information: No proposal package, solicitation, specification or drawings are available with this notice. Cost Reimbursement: Response to this announcement is strictly voluntary; no reimbursement will be made for any costs associated with providing information in response to this sources sought announcement or any follow-up information requests. North American Industry Classification System (NAICS) code: 237110 Water and Sewer Line and Related Structures Small Business Size Standard: $45 Solicitation: The NPS anticipates issuing a request for proposals in the Summer 2025. Bonding: The NPS anticipates bid, performance and payment bonds will be required Project Description: Mesa Verde was a cultural indegionious people community with historical dwellings. The project is located at: Mesa Verde National Park, Cortez. CO. The construction magnitude is $5M -$10M mandatory. The surrounding area is rural with limited staging located at pull outs and along the water line alignment. Note any unique material delivery requirements. The construction site is approximately 34 miles from nearest suppliers and lodging facilities. The Park will remain open during construction, thus contract activities and logistics must be structured and scheduled to minimize visitor impact. The site requires protective measures to ensure the surrounding area remains undisturbed. The structure is a historic/natural/cultural resource. There are seasonal/other shutdowns mandated through the construction season. Winter construction may be required. (plus anything else describing common conditions we ask about) Project Scope: The park domestic water services infrastructure has components constructed in the 1980's with various ages of modifications, upgrades, and replacements since construction. Domestic water storage tanks at Chapin Mesa and water distribution pipes serving Morefield Campground and Wetherill Mesa and have exceeded, their typical useful service lives, and have been identified to be replaced. Morefield Area: The Morefield area serves all campers at Mesa Verde National Park (MEVE), seasonal and permanent park residents and a large concessions operation. Morefield domestic water pipe replacement project includes about 3.3 miles of water supply pipe that operates under high-pressure up steep grades to fill the Morefield storage tank. This main water supply pipe was originally constructed in 1983 with several sections of pipe replaced since original construction. The most recent pipe section replacement project was in 2010 with the pipe length now constructed of three types of pipe materials and ages. Pipe isolation valves in concrete vaults create confined workspaces making maintenance and operation more difficult. The Morefield Area includes the park's only 267 site campground located at the head of Morefield Canyon - open approximately 7 months out of the year with an observed 25,000 campers in 2019. Park staff housing in this area includes occupant law enforcement, structural fire fighters and other permanent and seasonal employees, and their families. The concessions store, laundry, gas station, restaurant and shower facilities are served by this waterline. Wetherill Area: MEVE's Visitor Distribution and Transportation Vision Plan identifies Wetherill Mesa as critical component in redistributing visitor use on Chapin Mesa particularly in Headquarters and Mesa Top Loops area. The existing waterline that serves Wetherill Mesa is the original pipeline installed during the Mission 66 development of Wetherill Mesa and frequency of leaks is increasing as this piping continues to deteriorate and fail. Increased visitor use of Wetherill Mesa requires replacing aged and failing water service pipe to the visitor contact station, concession facility and the public comfort stations. The new water will also serve for structural and resource fire protection. Having reliable water service at Wetherill Mesa will increase visitor safety. In 2019 approximately Wetherill Mesa received 192,00 of the park's visitors accounting for approximately 20% of the park's visitation. These water line replacements will significantly reduce the risk of a catastrophic failure of service that would prevent use of the Morefield and Wetherill areas of the park. Maintenance of this water supply is essential for park operations, visitor use and safety, concession operations and fire protection of park cultural resources. Scope of Work: The objective of this project is to replace the water line serving the Morefield housing area, campground operations and also replace the water line serving the Wetherill Mesa and Badger House Community comfort station within MEVE near Cortez, Colorado. The existing facilities to be replaced or refurbished include approximately 13 miles of water line at Wetherill Mesa and 5 miles of water line at Morefield. Along with the water line replacemen twill be surfacing replacement, new valves and valve boxes, fire hydrants, tank connections, and select demo of existing facilities. Morefield Water Line: The new Morefield water line alignment is planned to be about 10-20-foot offset from the existing line throughout the lower segments in order to maintain service during construction. The lower segment will be a combination of open trench installation and HDD installation and the upper segment is anticipated to be all HDD installation. The segment of the water line going up the Mesa shall also be offset from the existing alignment by approximately 10-20 feet, however some segments may be re-aligned to shorten the length of the overall alignment. The minimum bury depth for the water main shall be four feet and maximum eight feet unless there are specific locations where it needs to be lower to avoid conflicts. Any roadways disturbed by pipe installation will be restored to preexisting conditions. The Morefield water line is the only line feeding the Morefield campground area and thus the existing main will need to remain in service to the maximum extent feasible during construction with short shutdowns allowed for switch over connections at each end. There is a segment of the Morefield water line just north of the stainless-steel replacement pipe where the pipe is currently outside of the MEVE park boundary. The replacement pipe will be relocated to be under the access road within the park boundary. The north portion of the Morefield line, before turning west toward the Visitor Center, is located within an easement in the Henneman Life Estate. The water line replacement in this area will need to be coordinated with the current residents The existing water line is a 6-inch diameter spiral welded steel water line except for the two segments that were replaced in 2010 with stainless steel totaling approximately 2,730 linear feet. Pressures in this segment range from 100 psi to 800 psi and there is an elevation change of over 1,050 vertical feet from the lower segment up the mesa to the Morefield Tank. Due to the high pressures, 2250 psi=rated Flex Steel was the recommended pipe type for this segment of water line replacement. Installation methods shall be a combination of HDD and open trench for this segment as shown in the plan sheets. The existing main must remain in service during construction and thus the new water line will be installed offset approximately 10 feet from the existing water line. The replacement valves and fittings shall be stainless steel fittings and valves rated to 2250 psi. There are three isolation valves on this segment of water line that will be replaced with this project and two new valves anticipated to be installed. Wetherill Water Line: The Wetherill water line will be replaced with a 6-inch diameter water line in a similar alignment to the existing line within the roadway for the majority of the length between the Navajo Hill tank and the Wetherill tank using traditional open trench installation methods while also minimizing impacts to undisturbed areas and archaeological sites. Minimum bury depth for the water main shall be 4 feet and maximum 8 feet unless there are specific locations where it needs to be lower to avoid conflicts. The current water line is a 6-inch diameter ductile iron water line for the entire length. Pressures in the system range from 27 psi to 550 psi just upstream of the existing PRV station near the Wetherill tank and there is an elevation change of approximately 1,150 vertical feet from the Navajo Hill two-million-gallon tank to the end of the line near Badger House. Adding PRVs along the alignment to keep the pressure under 150 psi for the entire length was discussed at the VA meeting but would require four separate PRVs installed along the alignment instead of the two PRVs currently installed in one location near the tank. The preferred alternative was to install a new PRV station on the water main near the Wetherill tank to reduce pressure. This led to the selection of 1500 psi rated Flex Steel as the water line material for the entire Wetherill alignment due to the pressure ratings and cost. Installation method will be open trench for this water main and possibly some short segments of HDD in select areas to avoid conflicts. The main water line feed will no longer route through the Wetherill Tank and will instead route directly down the access road to the comfort stations. The tank will be connected to the water main with isolation valves upstream and downstream for use in fire flow events or if a portion of the upstream water line needs to be shut down for maintenance. This will help with the water quality issues the park has been having at the end of the line and reduce the amount of treated water that needs to be flushed near the comfort stations. All replacement valves and fittings shall be stainless steel fittings and valves rated to 1500 psi. There will be new air release valves installed at all the high points in the water line profile and new isolation valves and drain lines installed at all the low points in the water line profile, currently eight estimated for both air release and drain valves. Six new Fire Hydrants will be installed at the three parking areas along the roadway, near the Wetherill Tank, near the Wetherill Mesa Comfort Station, and near the Badger House Comfort Station. Submittal Contents: Interested (small and large) businesses should submit the following information: (1) Company name, DUNS number, address, point of contact, telephone number, and email address. (2) Business type: Classification as a Large or Small Business under the above listed NAICS, Small Business Administration (SBA) certified Historically Underutilized Business Zone (HUBZone), Veteran-Owned Small Businesses (VOSB), Service-Disabled Veteran-Owned Small Businesses (SDVOSB), SBA certified Woman Owned Small Business (WOSB), Economically Disadvantaged Woman Owned Small Business (EDWOSB). The size of a small business firm includes all parents, subsidiaries, affiliates, etc.see 13 CFR 121.108.) Misrepresentation of size status can result in penalties. (3) Statement regarding your company's bonding capacity. Letters from bonding companies are not required at this time. (4) Information demonstrating experience and capability on projects of same or similar size, scope and magnitude, and constructed under similar conditions. (5) In addition businesses may submit existing marketing materials such as capability statements and brochures. Submittal Due Date/Time: 6/27/25 Submit To: CO: james_waller@nps.gov and CS: kristin_tauber@nps.gov

More opportunities from Department Of The Interior → Dsc Contracting Services Division

Same awarding agency

NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is an Invitation for Bid issued by the National Park Service Denver Service Center for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. This Small Business Set-Aside project, with an estimated construction magnitude between 1 million and 5 million dollars, focuses on repairing and extending a seawall damaged by Hurricane Ian. The scope of work is divided into three primary components: the installation of a new weatherable rigid vinyl sheet pile wall with tie rods and deadman walls, the eastward extension of the wall using structural FRP composite sheet pile, and comprehensive site restoration including excavation, backfilling, limestone riprap installation, and spartina sea grass restoration. The contract is a Firm-Fixed-Price award with a mandatory performance period of 259 calendar days, requiring work to commence within 10 days of award. Award decisions will be based on the Best Value Continuum Tradeoff Process, where non-price factors—including technical approach, management, project experience, and past performance—are significantly more important than price. Bids are due by November 6, 2026, and must be submitted electronically. The project is subject to the Davis-Bacon Act and requires strict adherence to environmental standards, including the use of biodegradable packaging and the elimination of ozone-depleting compounds. Contractors must provide a bid bond and subsequent performance and payment bonds, and all invoicing must be processed through the U.S. Department of the Treasury's Invoice Processing Platform.
Other Heavy and Civil Engineering Construction

POSTED

2 days ago

DEADLINE

in 16 days
View Details
NAICS: 237310
New
Federal
Z--BRCA 310427 Southbound Shuttle Stop
Solicitation # 140P2026R0065
Solicitation 140P2026R0065 is a small business set-aside for the construction of the Southbound Shuttle Stop at Bryce Canyon National Park, Utah. Managed by the National Park Service Denver Service Center, this firm-fixed-price contract has an estimated value between $1,000,000 and $5,000,000. The scope of work includes shuttle stop improvements, the addition of lanes, culvert installation, trail realignment, retaining wall construction, ADA ramp and sidewalk installation, and the placement of shelters and MUTCD-compliant signage. Due to the project's location, the contractor must implement protective measures for the adjacent UT Prairie Dog Habitat and ensure all equipment is clean and free of contaminants. The performance period is scheduled from May 1, 2027, to September 28, 2027, with a total duration of 150 calendar days following the notice to proceed. Award will be determined using the Best Value Continuum Tradeoff Process, evaluating technical approach, schedule, project experience, key personnel, and past performance alongside proposed pricing. Requirements include the submission of bid, performance, and payment bonds, compliance with Davis-Bacon Act wage determinations, and adherence to OSHA safety standards. Proposals must be submitted electronically in separate technical and price volumes, with a final response deadline of November 3, 2026.
Highway, Street, and Bridge Construction

POSTED

5 days ago

DEADLINE

in 13 days
View Details
NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. The project is estimated to exceed 100 million dollars, with a period of performance from February 1, 2027, to February 1, 2030, and a revised assumed Notice to Proceed date of April 1, 2027. The government will utilize a multi-factor, best-value tradeoff process for award, evaluating technical experience, technical approach, key personnel experience, and price. Key requirements include the provision of performance and payment bonds, adherence to union prevailing wage rates, and a 12-month operational support period following construction. Technical specifications emphasize strict cybersecurity hygiene for SCADA/MES equipment, full government rights to supplied software and source code, and compliance with ADA standards. Proposals must be submitted electronically in separate volumes, with specific evaluations focusing on the contractor's ability to manage complex wastewater plant commissioning and regulatory approvals.
Sewage Treatment Facilities

POSTED

5 days ago

DEADLINE

in 28 days
View Details
NAICS: 237110
Federal
Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment
Solicitation # 140P2026R0091
Solicitation 140P2026R0091 is a firm-fixed-price construction contract issued by the National Park Service Denver Service Center to rehabilitate the Rainshed and Water Treatment System at Hawaii Volcanoes National Park. The project scope includes the rehabilitation of the rainwater catchment and water treatment systems, the replacement of Building 43 with a new metal building, and the replacement of Building 241 with a new open-air and CMU structure. Additional optional requirements include replacing the perimeter fence, repairing the water treatment system, and replacing ground catchment pavement. The project has a mandatory performance period of 610 calendar days, with primary CLINs scheduled from November 1, 2026, to July 3, 2028. The government will award the contract using a best value tradeoff process, evaluating non-price factors such as project experience, technical approach, management approach, and construction schedule against proposed pricing. Bidders must comply with the Davis-Bacon Act for prevailing wages and adhere to Buy American Act and Build America Buy America standards. Technical requirements include ADA compliance, the implementation of a Quality Control Plan, and adherence to specific environmental standards regarding ozone-depleting substances and recycled content. Due to the site's nature, the project involves Section 106 mitigation for historic buildings and requires careful construction phasing to ensure water production is not compromised. Proposals must be submitted electronically, and the awardee will be required to provide performance and payment bonds within 10 days of award.
Water and Sewer Line and Related Structures Construction

POSTED

8 days ago

DEADLINE

in 16 days
View Details
NAICS: 237310
Federal
Z--YELL 338223 - Bridge Preservation
Solicitation # 140P2026R0073
Solicitation 140P2026R0073 is a Small Business Set-Aside for bridge preservation services at Yellowstone National Park, Wyoming, managed by the National Park Service Denver Service Center. The project involves the rehabilitation of three specific bridges: Lava Creek, Thumb Creek, and an Unnamed Creek bridge. The scope of work includes concrete spall and structural repairs, crack sealing, stone masonry repointing, bridge expansion joint maintenance, painting of railings, and the application of epoxy overlays via hydro-demolition. Additional requirements include erosion repair, pavement markings, and strict traffic control. The anticipated period of performance is 155 calendar days from the Notice to Proceed, with an estimated contract value between $1 million and $5 million. The contract will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, project experience, key personnel, and past performance—are significantly more important than price. Required key personnel include a Site Superintendent with at least five years of experience and OSHA 30 certification, and a Traffic Control Supervisor with three years of experience meeting MUTCD standards. Contractors must adhere to strict work hour restrictions from 7 AM to 7 PM and comply with environmental protections for wildlife and cultural resources. Performance and payment bonds are required at 100 percent of the contract price, and the project is subject to Davis-Bacon Act labor standards. Proposals are due by October 30, 2026.
Highway, Street, and Bridge Construction

POSTED

8 days ago

DEADLINE

in 9 days
View Details
NAICS: 237110
Federal
Y--GRTE 237343 - Rehab 4 Lazy F Ranch
Solicitation # 140P2026R0098
Solicitation 140P2026R0098 is a Total Small Business Set-Aside for the rehabilitation of the historic 4 Lazy F Ranch in Grand Teton National Park, Wyoming, to provide employee housing. The project scope includes the comprehensive rehabilitation of one lodge, eight cabins, one garage, two outbuildings, and a water well structure. Key technical requirements involve structural repairs, historic preservation, and the installation of new potable water and wastewater systems, including a sanitary sewer collection system and lift station. The project is estimated to exceed 10 million dollars and has a mandatory negotiable performance period of 170 calendar days, with work beginning within 10 days of award. The procurement will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—technical approach, project experience, schedule, and past performance—are collectively equal in importance to price. Contractors must adhere to strict environmental and safety standards, including the management of lead-based paint and asbestos, compliance with the Davis-Bacon Act, and mitigation of impacts on bald eagle nesting and roosting bats. Proposals must be submitted electronically by November 20, 2026, and must include a detailed technical approach and a phasing plan to minimize park operational disruptions. Required insurance includes general liability of 500,000 dollars and employer liability of 100,000 dollars.
Water and Sewer Line and Related Structures Construction

POSTED

16 days ago

DEADLINE

in 30 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS