Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of The Interior was posted on March 23, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y--MEVE-STABILIZE SPURCE TREE HOUSE ARCH

Closed
140P1222R0004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex located at 28 Bare Cove Park Drive. This fixed-price lump sum project has an estimated construction cost of $1,300,000. The scope of work includes site preparation such as the removal of trees, shrubs, and stumps, re-grading the site, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the contractor is responsible for a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor must coordinate with the Town and the demolition contractor, Pasquazzi Bros, Inc., and is responsible for maintaining construction fencing and erosion control throughout the project duration. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or paved athletic facilities. Bidders must submit their proposals electronically via the OpenGov portal by November 3, 2026, including a 5% bid security and a Statement of Qualifications with at least three similar public project references. Awarded contractors must provide a payment bond equal to 50% of the total project cost and adhere to Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code. The project includes a minimum one-year warranty for labor and a two-year warranty for materials. Final payment is contingent upon the submission of AIA affidavits for the payment of debts and release of liens.
Recreation

POSTED

about 3 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
Pre-Qualification For Construction Of Park, Recreation & Libraries Parks And Facilities For 2027
Solicitation # 13-202
Solicitation 13-202 is a pre-qualification process issued by the City of Roseville, California, for the construction of park, recreation, and library facilities scheduled for 2027. The objective is to identify qualified contractors with the capacity and experience to execute new park construction and rehabilitation projects. Interested parties must submit their pre-qualification packages via email to the City Clerk’s Office by 3:00 p.m. on November 23, 2026. Submissions are limited to 25 megabytes and must include a signed questionnaire, DIR registration for all contractors and subcontractors, and current workers' compensation certificates of insurance. To achieve pre-qualified status, applicants must meet essential qualifications, including a valid California Contractor's license and specific insurance limits of 1,000,000 dollars per occurrence and 2,000,000 dollars aggregate. Experience requirements mandate the completion of at least six new park construction projects for public agencies within the last three years, with a maximum of three rehabilitation projects allowed toward this total. Financial solvency is verified through third-party credit checks, where a score of 650 or less may lead to disqualification. Evaluation also considers compliance with California apprenticeship laws, Davis-Bacon prevailing wage requirements, and CAL OSHA safety standards.
City of Roseville, Parks, Recreation & Libraries Department (PRL)

POSTED

about 3 hours ago

DEADLINE

in 25 days

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

NM

Set-Aside

NONE

Documents

2

MARKET_RESEARCH_Questionnaire_1.docx

DOCX

Market_Research_Sources_Sought_Spruce_Tree_House_Arch_Stabilization_20220318_1.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Imr Santa FE(12100)
Contacts1 person available
OfficeSANTA FE, NM, 87504, USA
Office AddressSANTA FE, NM, 87504, USA

Full Description

Show more
MEVE-STABILIZE SPURCE TREE HOUSE ARCH SOURCES SOUGHT FOR MARKET RESEARCH The Department of the Interior, National Park Service - Mesa Verde National Park In accordance with FAR 15.201 this is a SOURCES SOUGHT FOR MARKET RESEARCH ONLY. This notice is a request for information only to be used for preliminary planning purposes. THIS IS NOT A SOLICITATION ANNOUNCEMENT, AN INVITATION FOR BIDS, A REQUEST FOR PROPOSALS, OR A REQUEST FOR QUOTES NOR A PROMISE TO ISSUE A SOLICITATION IN THE FUTURE, AND NO CONTRACT WILL BE AWARDED FROM THIS SOURCES SOUGHT. No reimbursement will be made for any costs associated with providing information in response to this announcement or any follow-up information requests. No request for a bid package or solicitation will be accepted. Not responding to this RFI does not preclude participation in any future solicitation, if any is issued. If a solicitation is released, it will be synopsized on the SAM.com website. It is the responsibility of interested parties to monitor these sites for additional information pertaining to this requirement. The information received will be used within the Department of the Interior, National Park Service (NPS) to facilitate the decision-making process and will not be disclosed outside of the agency. A decision will be made whether to issue any potential solicitation as a competitive set-aside for Small Business, U.S. Small Business Administration (SBA) certified 8(a), SBA certified HUBZone, Women Owned Small Business (WOSB), Service-Disabled Veteran-Owned Small Businesses, Total Small Business, or whether to issue as full and open competition (unrestricted). The purpose of this Sources Sought is to gain knowledge of interested businesses that have the capability and relevant experience to stabilize the soft sandstone arch which is the leading edge of and is immediately adjacent to the alcove roof covering of Spruce Tree House, an Ancient Puebloan habitation site, located in Mesa Verde National Park. A determination by the Government to compete this requirement as a set-aside based upon responses to the notice and other market research is solely within the discretion of the Government. The information provided in the RFI is subject to change and is not binding on the Government. The release of this RFI should not be construed as a commitment or as an authorization to incur cost for which reimbursement would be required or sought. All submissions will become Government property and will not be returned. 1.0 Description The National Park Service (NPS) in support of Mesa Verde National Park is seeking information from qualified contractors of interest on a project to stabilize the alcove cliff lead edge above the prehistoric Spruce Tree House (STH) cliff dwelling. The nose of the alcove contains a thin arch delineated by a persistent curved crack, which extends about 270 ft north from above the south end of the alcove. The original crack gap between the alcove roof and the back of the arch varied between hairline thin up to roughly five (5) feet wide at the widest location. The arch cross section is roughly 10 ft thick (depth) by 20 ft high, at the greatest cross-section. As part of a stabilization project in the early 1960s, this gap was filled with concrete, as discussed below. Spruce Tree House cliff dwelling was constructed in a natural alcove. Both the alcove and the dwellings are in a culturally and environmentally sensitive environment, located directly adjacent (across the canyon) to the park headquarters district. A 1960s investigation led to a stabilization program of the southern half that included rockbolts and a thorough cleaning and filling of the crack with concrete along the complete length of the arch. Recent detailed engineering analyses (3-D finite difference method) indicate that the existing 1960s era stabilization is nearing the end of its life cycle and may fail. A stabilization design of installing additional longer and reticulated rockbolts to stabilize the main arch, shorter rockbolts to stabilize individual arch rock blocks, selective vegetation removal and rock scaling of the cliff, treatment of the crack between the arch and alcove cliff, and instrumentation to monitor the installed stabilization has been completed by a geotechnical and structural engineering consultant for the NPS. The analysis and construction plan, as presented in the construction drawings and specifications, shall be followed for the stabilization. The geostructural project presented in the construction drawings and specifications and associated work elements shall include, but are not limited to: - Site preparations to include two staging areas: one to include a larger nearby (less than 1 mile away from the project site) 1.1 acre main staging area and field office complex, and the 0.5 acre project construction area for needs of the daily work within the project construction limits, with access of approved vehicular type and traffic. - Plan and install system(s) to protect natural resources within the project construction limits including vegetation, soils, and exposed rock surfaces. - Plan and install system(s) to protect Spruce Tree House cliff dwelling and other cultural resources delineated within the project construction limits. - Selective removal of up to 20 small trees and approximately 100 sq. feet of vegetation embedded in and on the cliff face. - Selective scaling of designated rock pieces, with total surface area of approximately 360 sq. feet of the cliff rock surface with an average thickness of two (2) feet. Appropriate protection of the existing alcove rock surfaces and ground features below the scaling work shall be provided by the contractor. - Installation and maintenance of erosion and sedimentation control measures within the 1.1 acre nearby staging and field office area and the 0.5-acre project construction area, both on top of the alcove and below along the canyon edge. - Preconstruction installation, at agreed upon locations within the project limits, and testing of up to five (5) installed tensioned rockbolts and 3 passive anchors for verification of design assumptions. - Preconstruction mock-up panels and/or on-site patching demonstrating patching material coordination of color and texture, and methods of installation and application for anchor recessed holes for bearing plates. There will be enough example patches to be representative of the range of colors and rock surface conditions for this project. - All drilling for rockbolts or anchors shall be conducted with non-impact drill methods and drilling in the dry, with HEPA air filtration systems to capture a minimum of 95% of the cuttings dust. - Installation (drill hole diameter = 2.5), tensioned (48 kips lock-off), and Portland cement grouting of rockbolts. 76 - 1 3/8 diameter 20-foot long R1H hollow-core spin lock-off grouted rock bolts (Gr. 80) by Williams Form Engineering Corp., or approved equal, with recessed anchor plates, in the cliff face. - Installation (drill hole diameter = 1-1/4) and resin grouted passive anchored rockbolts. 23 - #7 (7/8) diameter 8-feet long R61 (Gr. 80) All-thread Rebar by Williams Form Engineering Corp., or approved equal, with recessed anchor plates, in the cliff face. - Installation (drill hole diameter = 1-1/4) and resin grouted passive anchored rockbolts. 17 - #7 (7/8) diameter 7-feet long R61 (Gr. 80) All-thread Rebar by Williams Form Engineering Corp., or approved equal, with recessed anchor plates, in the cliff face. - Installation (drill hole diameter = 3/4) and resin grouted passive anchored rockbolts. 36 - 5/8 diameter 4-feet long All-thread Rebar with a material grade that conforms to ASTM F593, Alloy Group 1, Condition CW1, Type 304 with a recess in the cliff face. - Installation (drill hole diameter = 3/4) and resin grouted passive anchored rockbolts. 15 - 5/8 diameter 8-feet long All-thread Rebar with a material grade that conforms to ASTM F593, Alloy Group 1, Condition CW1, Type 304 with a recess in the cliff face. - Installation (drill hole diameter = 3/4) and resin grouted passive anchored rockbolts. 29 - 5/8 diameter 6-feet long All-thread Rebar with a material grade that conforms to ASTM F593, Alloy Group 1, Condition CW1, Type 304 with a recess in the cliff face. - Placement of dry-packed cement-based mortars to provide encapsulation and corrosion protection to new rockbolts that custom match the surrounding rock surfaces. - There shall be treatment of portions of the lower exposure of the 1960s era concrete in-fill of the crack between the back of the arch and the alcove cliff (along the crack). Crack shall be cleaned with power washer (20 psi, max.) and dried by compressed air (20 psi, max.) only in area where horizontal joint seal is to be installed. A horizontal joint seal will be installed, with the minimum height equals the width of the existing crack. Polyethylene drain tubes (1/2 diameter) shall be installed in the horizontal joint seal at twelve (12) spacing, approximately flush at the top and extending downward roughly four (4) inches below the bottom of the joint seal. Prevention of any spillage is required, where the contractor is responsible for cleaning any spillage and restoration to original conditions. Approximate length = 100 feet. - Installation of geotechnical instrumentation including up to seven (7) vibrating wire strain gauges on rockbolts, up to four (4) multipoint extensometers and up to eight (8) vibrating wire crack gauges with remote datalogging and transmitting capabilities to be centralized in either the Park Headquarters or the Chief Ranger Office building, located directly across the canyon from STH. - Install two reinforced concrete triangular shaped haunches with rock bolts, each approximately 8 feet long, with triangular side legs of 1.5 feet and 2.5 feet, and 3 feet secured with #7 (7/8) diameter 7-feet long R61 (Gr. 80) All-thread Rebar by Williams Form Engineering Corp., or approved equal, that are resin grouted with anchor plates bearing on the back plane and enclosed within the concrete haunches. This project will require extreme care to contain cement grout and only low vibration dry drilling with HEPA type dust capture systems will be allowed for the installation of the rockbolts and other anchors. The work site shall be closed during construction, but pedestrian controls to secure the work site will be required and vehicle traffic control will be required from the contractor to maintain employee and visitor safety along the public roads necessary to access the work site. 2.0 Contract Information The anticipated firm fixed price construction contract is expected to have a magnitude between $2,000,000 and $3,000,000. Performance Period: Estimated 150 days after the Notice to Proceed. The performance period takes in to account the fact that construction may occur during the autumn, winter and/or spring when the ground is frozen but not wet. The contractor must provide all labor, materials, equipment, transportation, subsistence, and other resources necessary (except as furnished by the U.S. Department of Interior, NPS). 3.0 Requested Information & Responses All interested parties should email their interest and capabilities statement to Marcia Fox, Contracting Officer, contact@example.gov. Include in your email the information requested below in the Market Research Questionnaire. This information will be used only to determine if there is interest by qualified firms and will not be used in award. Please limit your response to five pages or less. Only completed questionnaires will be accepted. 4.0 Questions Questions regarding the announcement shall be submitted in writing by e-mail only to contact@example.gov. Telephone inquiries and responses will not be entertained or honored. All responses are due March 30, 2022, at 12:00 PM (MDT).

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award