This Government Contract opportunity from Department Of Defense was posted on September 14, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
This contract, awarded by the U.S. Army Corps of Engineers Pittsburgh District, focuses on the Phase I aquatic ecosystem restoration of North Park Lake in Allegheny County, Pennsylvania. The project involves dry excavation from the upstream end of the North Fork Pine Creek arm toward the dam, increasing water depths from a few inches to approximately 12 feet. Work is centered at North Park Lake, the Wildwood Mine Sediment Disposal Site, and associated haul routes.
The scope of work includes the installation of habitat structures such as rock humps and porcupine cribs to support fish cover and benthic production, as well as the placement of coir logs and wetland vegetation to prevent shoreline erosion. Additionally, the contractor is responsible for the staging, installation, and removal of temporary stream diversions and crossings to facilitate the restoration process.
HighAI Summary for Amendment 0001 - W911WN-09-B-0005: Amendment 0001 for solicitation W911WN-09-B-0005 extends the response deadline from July 8, 2009, to July 22, 2009. It adds Table 2 (Plantings on and Adjacent to Coir Logs) to Section 01 57.23.00 15 and provides a detailed Q&A section addressing drawing availability, payment basis for excavation, coordination with county projects, and scope clarifications regarding the Wildwood placement area and habitat restoration limits.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 0003 to Solicitation W911WN-09-B-0005: Amendment 0003, dated July 24, 2009, for solicitation W911WN-09-B-0005 issued by the U.S. Army Engineer District, Pittsburgh. This amendment extends the offer submission deadline to August 7, 2009, at 11:00 AM. Key changes include revisions to multiple specification sections and drawings, the deletion of awardable option items 0005AA through 0005AG, and the addition of new items 0001CN and 0001CP for temporary lakebed culverts. A revised bid schedule is provided.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for North Park Lake Section 206 Aquatic Ecosystem Restoration Project - General Requirements: Section 01 30 00.10 of the North Park Lake Section 206 Aquatic Ecosystem Restoration Project (Phase I), revised by Amendment 0003 for contract W911WN-09-B-0005. This document outlines general requirements, including scope, submittal requirements for traffic control plans, drawing verification, and work area restrictions.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for North Park Lake Section 206 Aquatic Ecosystem Restoration Project - Measurement and Payment: This document is Section 01 22 00.00 10, 'Measurement and Payment', for the North Park Lake Section 206 Aquatic Ecosystem Restoration Project (Phase I), revised by Amendment 0003. It defines the payment structures for both lump sum items (e.g., traffic control, lake access ramps, stream diversions) and unit price items (e.g., sediment excavation, environmental improvements, plantings), detailing what constitutes full compensation for each item.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for North Park Lake Section 206 Aquatic Ecosystem Restoration Project Phase I - Technical Specifications: Technical specifications for Phase I of the North Park Lake Section 206 Aquatic Ecosystem Restoration Project (Contract W911WN-09-B-0005). The document includes a detailed project table of contents and specific sections on measurement and payment, outlining lump sum and unit price items such as traffic control, lake access ramps, stream diversions, and sediment excavation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for North Park Lake Section 206 Aquatic Ecosystem Restoration Project - Section 02 30 00 Earthwork: Technical specifications for Earthwork (Section 02 30 00) for the North Park Lake Section 206 Aquatic Ecosystem Restoration Project, Phase I. The document details requirements for excavation, stripping of topsoil, grading, backfilling, and compaction, including material classifications (satisfactory vs. unsatisfactory) and applicable ASTM/AASHTO testing standards. This version was revised by Amendment 0003 for contract W911WN-09-B-0005.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for North Park Lake Section 206 - Section 33 11 00 Clearing and Grubbing: Technical specifications for Section 33 11 00 (Clearing and Grubbing) for the North Park Lake Section 206 Aquatic Ecosystem Restoration Project, Phase I. The document outlines requirements for clearing, tree removal, pruning, grubbing, and disposal of materials, including submittal requirements for product data and samples. This version was revised by Amendment 0003 for contract W911WN-09-B-0005.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for North Park Lake Section 206 - USACE Quality Control (Section 01 45 00): Technical specification section 01 45 00 for the North Park Lake Section 206 Aquatic Ecosystem Restoration Project (Phase I), contract W911WN-09-B-0005, revised by Amendment 0003. It details the requirements for the Contractor Quality Control (CQC) system, including the submission of a CQC Plan, personnel qualifications, the three-phase control system, and testing procedures.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Solicitation W911WN-09-B-0005 Amendment 0004: Amendment 0004 to solicitation W911WN-09-B-0005, issued by the U.S. Army Engineer District, Pittsburgh on July 31, 2009. The amendment provides responses to four technical questions regarding drawing packages and site preparation and corrects the description for SUBCLIN 0001CP from an 18-inch to a 24-inch HDPE temporary culvert. The offer receipt date remains August 7, 2009, at 11:00 am.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for W911WN-09-B-0005-0003 Conformed Price Schedule: This document is a conformed price schedule (Section 00010) for contract W911WN-09-B-0005-0003. It details a comprehensive list of Firm Fixed Price (FFP) line items (CLINs) for environmental and construction work, including stream diversions at Pine Creek and Irwin Run, lake sediment excavation, and extensive emergent wetland and shoreline scrub-shrub plantings.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for W911WN-09-B-0005-0004 Conformed Price Schedule: A conformed price schedule for contract W911WN-09-B-0005-0004, detailing Firm Fixed Price (FFP) line items for environmental restoration and construction. Key items include stream diversions at Pine Creek and Irwin Run, lake sediment excavation, and extensive emergent wetland and shoreline scrub-shrub plantings.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for W911WN-09-B-0005-0005 Conformed Price Schedule: A conformed price schedule for contract W911WN-09-B-0005-0005, detailing Firm Fixed Price (FFP) line items for environmental and construction work. Key items include stream diversions at Pine Creek and Irwin Run, lake sediment excavation, and extensive emergent wetland and shoreline scrub-shrub plantings.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for W911WN-09-B-0005 Amendment 0002: Amendment 0002 to solicitation W911WN-09-B-0005. Key changes include extending the required response date from July 22, 2009, to July 29, 2009, and updating the Department of Labor Wage Rates (General Decision Number PA080004) for heavy and highway construction projects across various counties in Pennsylvania.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for W911WN-09-B-0005 Wage Determination: Modification 0005 to contract W911WN-09-B, updating the Department of Labor Wage Rates (General Decision Number: PA080004 dated 07/24/2009) for Heavy and Highway construction projects across various counties in Pennsylvania. The document specifies hourly rates and fringes for multiple trades, including Boilermakers, Bricklayers, Carpenters, and Electricians.
DOC
DOC, Low priorityaward
LowAI Summary for Bid Results - W911WN-09-B-0005 North Park Lake Aquatic Ecosystem Restoration: Bid tabulation for contract W911WN-09-B-0005 regarding the North Park Lake Aquatic Ecosystem Restoration. Lists bids from Sippel Development, Charles J. Merlo, Inc., Allison Park Contractors, Inc., and Joseph B. Fay Co., alongside the Independent Government Estimate.
DOC
DOC, Low prioritysite-visit-attendance
LowAI Summary for NPL Site Visit Attendance Register - W911WN-09-B-0005: Attendance register for the pre-bid site visit held on June 17, 2009, regarding Solicitation No. W911WN-09-B-0005 for the North Park Lake Section 206 Aquatic Ecosystem Restoration. The document lists representatives from various contracting firms and USACE Pittsburgh District employees who attended.
PDF
PDF
ZIP
ZIP
DOC
DOC
ZIP
ZIP
AI Contract Breakdown
Uniform Contract Format
Contract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
8 updates
PhaseAwarded
Posted
Presolicitation
Notice updated
Response deadline changed from Sep 30, 2009 to Jul 8, 2009. The notice description changed. The point of contact changed.
Notice updated
The notice description changed.
Notice updated
Response deadline changed from Jul 8, 2009 to Jul 22, 2009. The notice description changed.
Notice updated
Response deadline changed from Jul 22, 2009 to Jul 29, 2009. The notice description changed.
Notice updated
Response deadline changed from Jul 29, 2009 to Aug 7, 2009. The notice description changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Type Changed
Presolicitation → Solicitation
Awarded
Contract was awarded
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Organization & Contact Information
Show more
AgencyDepartment Of Defense → W072 Endist Pittsburgh
The work under this contract shall be performed at North Park Lake, the Wildwood Mine Sediment Disposal Site, and the haul routes to the disposal site, all located in Allegheny County, PA. North Park Lake is located within North Park, a County-operated recreation facility that lies about 10 miles north of the City of Pittsburgh, PA. The project is separated into three construction packages (Site Preparation Allegheny County, Phase I U.S. Army Corps of Engineers (USACE), and Phase II- Allegheny County). This contract award is for Phase I only, which is the only phase of the project awarded by the U.S. Army Corps of Engineers, Pittsburgh District. Phase I consists of excavation from the upstream end of North Fork Pine Creek arm to an area near the dam. Water depths in the North Fork Pine Creek arm currently range from a few inches to about 2 feet. Excavation of this area willcreate depths that range from shallow shoreline areas to approximately 12 feet at the most downstream end of the lake arm. The volume of excavation isspecified in the contract line item schedule. Excavation will be performed in the dry. Following excavation, habitat structures (rock humps, porcupine cribs, etc.) will be placed to provide cover for fish and to increase benthic production. Coir logs will be placed along portions of the shoreline to prevent erosion and encourage wetland vegetation growth near shore. These habitats are important for fish spawning and provide nursery areas for young fish. Phase I work will also include installation, staging, and removal of temporary stream diversions, including temporary crossings; and wetland vegetation planting, including c oir log plantings and surrounding shoreline plantings.