Y--OR-KLAMATH FALLS NFH CONSTRUCTION OF PHASE 1

Awarded
140F0322B0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236210
New
Federal
F-15EX 8-Bay Maintenance Hangar Complex-Industry Day
Solicitation # W50S8527H1CU0
The National Guard Bureau is seeking market intelligence for the construction of an aircraft maintenance hangar complex at Selfridge Air National Guard Base in Harrison Township, Michigan. This project supports 21 Primary Aircraft Authorization F-15 EX aircraft and is estimated to have a magnitude between 150 million and 200 million dollars. The scope includes the demolition of buildings 3, 5, 117, and 120, with new parking constructed in the footprints of buildings 117 and 120. The construction may be executed in three phases: Hangar 1, a 2-bay corrosion control and fuel cell hangar; Hangar 2, a 4-bay maintenance hangar; and Hangar 6, a 2-bay munitions and training facility. The project also requires necessary utility and infrastructure upgrades. The government is considering a fixed-price agreement utilizing an Other Transaction Agreement under the authority of 10 U.S.C. 2808a, with funding potentially provided in annual phases of approximately one-third of the total cost. Technical requirements include compliance with DoD antiterrorism and force protection standards, adherence to Air Force and base design standards, and specialized foundations to meet flood plain requirements. Design is anticipated to be 100 percent complete by early 2027. This notice is for planning purposes only and is not a formal solicitation. Interested firms under NAICS code 236210 must provide company details, bonding capacity, and evidence of experience with aviation facilities and constrained-site construction to the designated points of contact by the response deadline of December 1, 2026.
W7NF Uspfo Activity Miang 127

POSTED

1 day ago

DEADLINE

in about 1 month
NAICS: 236210
New
SLED
Facilities & Parks New Supply Warehouse Building
Solicitation # ITB FM 04-27
The Board of County Commissioners of Okaloosa County, Florida, is soliciting bids under ITB FM 04-27 for the construction of a new 9,000 square foot metal supply warehouse for the Facilities and Parks Department located at 5489 Old Bethel Road in Crestview. The project involves comprehensive site preparation and construction, including the installation of energy-efficient HVAC systems, electrical and plumbing work, and telecommunications wiring. All work must comply with the 2023 8th Edition Florida Building Code, ADA standards, and OSHA regulations, with specific structural requirements to withstand 160 MPH ultimate wind speeds. A fire alarm system is explicitly not required for this project. Bids must be submitted electronically via OpenGov by November 4, 2026, at 3:00 pm CST. The contract will be awarded to the responsive and responsible vendor with the lowest bid, though the County reserves the right to negotiate the most advantageous agreement. The selected contractor must provide a dedicated project manager and furnish both bid and performance bonds. The project timeline is 12 months from the notice to proceed. Payment will be processed through the County Finance Office in accordance with the State of Florida Local Government Prompt Payment Act, contingent upon annual appropriation. For projects involving federal grant funding, contractors must be registered in SAM.gov and comply with Buy America and Trafficking Victims Protection Act requirements.
Facilities & Parks

POSTED

6 days ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The U.S. Fish and Wildlife Service, through the Fws Pacific Regional Office, issued solicitation 140F0322B0001 for the construction of Phase I of the Sucker Fish Facility at the Klamath Falls National Fish Hatchery in Klamath County, Oregon. This firm-fixed-price contract, with an estimated project magnitude between 4 million and 6 million dollars, involves the development of a new hatchery facility on private land leased by the agency. The scope of work includes the construction of an influent retention pond, up to ten aquaculture ponds, geothermal supply and drainage pipelines, access roads, and a metal storage building. Key technical requirements cover extensive earthwork, cast-in-place concrete, metal fabrications, magnetic flow meters, and comprehensive erosion and sedimentation control in compliance with Oregon DEQ standards. The procurement process included multiple amendments to refine the bid schedule, update technical specifications, and provide responses to bidder inquiries regarding site access, permitting responsibilities, and utility coordination. A Finding of No Significant Impact (FONSI) was previously issued, concluding that the project would not significantly affect the human or natural environment. Contractors are required to adhere to Davis-Bacon prevailing wage rates for heavy construction in Klamath County and must provide a 20 percent bid bond for responsiveness. The project performance period is established as 24 months from the date of award.

General Info

Contract Value

$10,227,007.77

NAICS

236210 - Industrial Building Construction

Place of Performance

OR, USA

Set-Aside

NONE

Award Issued Date

Documents

48

01 71 23 Field Engineering - Amendment 2

PDF, High priority: read this first3 pages · amendment
High

05 50 00 Metal Fabrications - Amendment 2

PDF, High priority: read this first7 pages · specifications
High

140F0322B0001 Amendment 0001

PDF, High priority: read this first2 pages · amendment
High

140F0322B0001 Amendment 0003

PDF, High priority: read this first3 pages · amendment
High

140F0322B0001 Amendment 0006

PDF, High priority: read this first3 pages · amendment
High

140F0322B0001 Amendment 0007

PDF, High priority: read this first3 pages · amendment
High

140F0322B0001 Amendment 0008

PDF, High priority: read this first3 pages · amendment
High

Amend 2 - Attach 13 - KF NFH Electrical Addendum 0002

PDF, High priority: read this first3 pages · amendment
High

Amend 2 - KFH Phase 1A Addendum 0002 - Project Limits

PDF, High priority: read this first14 pages · amendment
High

Amendment 0002 - Answers to Questions, Sol. 140F0322B0001

PDF, High priority: read this first6 pages · amendment
High

Amendment 0002 - Revised Bid Schedule, Klamath Falls NFH Phase 1

PDF, High priority: read this first2 pages · amendment
High

Amendment 0004 - Answers to Questions for Solicitation 140F0322B0001

PDF, High priority: read this first9 pages · amendment
High

Amendment 0004 - Sol 140F0322B0001

PDF, High priority: read this first4 pages · amendment
High

Amendment 0005 - 140F0322B0001

PDF, High priority: read this first3 pages · amendment
High

Amendment 0005 – Sol. No. 140F0322B0001 Q&A Responses

PDF, High priority: read this first7 pages · amendment
High

Amendment 0006 - Sol. No. 140F0322B0001 - Questions & Answers

DOCX, High priority: read this first8 pages · amendment
High

Amendment 0007 – Solicitation 140F0322B0001 Q&A Updates

PDF, High priority: read this first10 pages · amendment
High

Amendment 0008 - Answers to Updated Questions, Sol. 140F0322B0001

PDF, High priority: read this first13 pages · amendment
High

Amendment 2 - Attach 12 - KFH Phase 1B Addendum 0002

PDF, High priority: read this first16 pages · amendment
High

Amendment 2 - Attachment 9 - 01 57 13 Erosion and Sedimentation Control

PDF, High priority: read this first4 pages · amendment
High

Amendment 2 - Section 31 00 00 Earthwork

PDF, High priority: read this first15 pages · amendment
High

Amendment 4 - Attachment 2 - Earthwork Specification

PDF, High priority: read this first15 pages · amendment
High

Amendment 5 - Section 01 71 23 Field Engineering

PDF, High priority: read this first3 pages · specifications
High

Amendment 5 – Section 03 30 00 Cast-in-Place Concrete

PDF, High priority: read this first12 pages · amendment
High

Construct Phase I Sucker Fish Facility - Clauses and Provisions

PDF, High priority: read this first48 pages · contract-document
High

IFB 140F0322B0001 Amendment 0004 Bid Schedule

DOC, High priority: read this first2 pages · amendment
High

IFB 140F0322B0001 Amendment 0005 - Revised Bid Schedule

DOC, High priority: read this first2 pages · amendment
High

IFB 140F0322B0001 - Construct Phase I Sucker Fish Facility

PDF, High priority: read this first4 pages · ifb
High

IFB 140F0322B0001 - Construct Phase I Sucker Fish Facility

PDF, High priority: read this first1 page · ifb
High

Klamath Falls National Fish Hatchery Geotechnical Report

PDF, High priority: read this first128 pages · sow
High

Klamath Falls New Hatchery Scope Narrative v2

PDF, High priority: read this first5 pages · sow
High

Klamath Falls NFH Compiled Specifications

PDF, High priority: read this first172 pages · specifications
High

New Hatchery Phase 1 Bid Schedule - Klamath Falls National Fish Hatchery

DOC, High priority: read this first2 pages · bid-schedule
High

OR20220071 Wage Determination (01/07/2022)

PDF, High priority: read this first10 pages · wage-determination
High

Phase 1A National Fish Hatchery Klamath Falls project limits

PDF, High priority: read this first77 pages · sow
High

Recorded Lease Legal Descriptions and Map - Klamath Falls NFH

PDF, High priority: read this firstspecifications
High

Section 03 30 00 Cast-in-Place Concrete – Amendment 2

PDF, High priority: read this first12 pages · amendment
High

Section 33 10 00 Water Utilities - Amendment 2 Attach 4

PDF, High priority: read this first8 pages · specifications
High

Section 33 10 00 Water Utilities - Amendment 5 Attachment 4

PDF, High priority: read this first8 pages · specifications
High

Section 33 40 00 – Drainage Systems (Amend 2)

PDF, High priority: read this first8 pages · specifications
High

Section 40 71 13 - Magnetic Flow Meters

PDF, High priority: read this first5 pages · sow
High

Sol 140F0322B0001 Amendment 0002

PDF, High priority: read this first3 pages · amendment
High

Attach 8 - Klamath Falls Site Photos

PDF, Low priorityspecifications
Low

IFB 1407032208001 Site Visit Sign-In Sheet

PDF, Low priorityamendment
Low

Klamath Falls National Fish Hatchery FONSI - October 2020

PDF, Low priority9 pages · fonsi
Low

Sol. No. 140F0322B0001 RFI Responses and Clarifications

PDF, Low priority2 pages · q-and-a
Low

USFWS Klamath Falls National Fish Hatchery Final Environmental Assessment

PDF, Low priority223 pages · environmental-assessment
Low

Amend_2_-_Attach_14_-_X-GRADING_0002.zip

ZIP

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

9 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Response deadline changed from Mar 15, 2022 to Mar 29, 2022. The notice title changed.

Notice updated

The notice description changed.

Deadline changed

Response deadline changed from Mar 29, 2022 to Apr 12, 2022.

Deadline changed

Response deadline changed from Apr 12, 2022 to Apr 21, 2022.

Deadline changed

Response deadline changed from Apr 21, 2022 to Apr 28, 2022.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Apr 28, 2022 to May 9, 2022.

Notice updated

Notice type changed from Solicitation to Special Notice. Set-aside removed. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Fws Pacific Regional Office
Contacts1 person available
OfficePORTLAND, OR, 97232, USA
Office AddressPORTLAND, OR, 97232, USA
Contacts

Full Description

Show more
The U.S. Fish and Wildlife Service is issuing a sealed bid solicitation to solicit for and procure a firm-fixed-price contract for the construction of a new fish sucker fish hatchery located on Lower Klamath Lake Road in Klamath Falls, Oregon (Klamath County). This is the same requirement that was advertised last calendar year around this same time frame against solicitation number 140F0121B0001 that was cancelled, but issues encountered have since been resolved to continue with the project. The proposed period of performance is anticipated to start during the spring of 2022 and complete in the fall of 2023 (15 months after contract award or approximately May 1, 2022 through August 1, 2023). Project magnitude is between $4,000,000.00 and $6,000,000.00 This procurement is being solicited as a Small Business Set-Aside. The NAICS code is 236210 with a size standard of $39.5 million or less annually when averaged over a three year period. The work to be performed will be as defined in associated specifications and drawings provided when solicitation is issued. Detailed requirements and/or specifications will be listed within the solicitation. A Firm Fixed Price award is contemplated from this sealed bid solicitation with an award to the responsive/responsible bidder providing the lowest combined total price for all line items. A project summary narrative of new hatchery work is as follows: The proposed project involves the construction of a new fish sucker fish hatchery located on Lower Klamath Lake Road in Klamath Falls, Oregon. The proposed project will be located on land that is owned by a private party and leased to the U.S. Fish and Wildlife Service for the project. Existing aquaculture operations occupy portions of the project site. The hatchery will include a 1.08 acre earthen, lined pond for water storage known as the Influent Retention Pond (IRP), and up to 10 earthen, lined ponds for aquaculture with harvest kettle structures built into their berms, water supply, and drainage. The aquaculture ponds will typically be 5 to 7 feet deep with berms that are 6 to 8 feet tall, and vary in size from 1/8-acre to 1/4-acre. The IRP will be 10 feet deep. Supply pipelines, drainage pipelines and access roads will be constructed around each of the ponds. The project will include an 8-inch diameter buried geothermal supply (GS) pipeline beginning at an existing well on the site and extending approximately 2,990 feet to discharge at the IRP. GS pipeline will typically be placed with 3 feet of cover. The project will also include construction of gravel and asphalt concrete surfaced access roads connecting the beginning at Lower Klamath Lake Road and extending northward into the property and around the perimeter of each of the ponds. The width and surfacing of the road will vary throughout the site based on the anticipated usage. Near Lower Klamath Lake Road, the access road will be 24 feet wide and surfaced with asphalt concrete over a length of approximately 250 feet. From this point, the primary access road will narrow to 16 feet and will be surfaced with an 8-inch thickness of crushed rock, continuing approximately 1,280 feet to the IRP. Additional crushed rock surfaced access roads will be constructed around the perimeter of all aquaculture ponds and the IRP. In the southern portion of the site a 24-foot wide and 40-foot long metal building structure and a concrete slab foundation will be constructed for storage of materials and supplies used by the hatchery operators. Construction work needed to facilitate the project includes excavation, fill placement, grading, temporary erosion and sedimentation control, permanent seeding, pond liners, cast-in-place concrete structures, paving and crushed rock road surfacing, pressurized pipelines for geothermal water distribution, gravity pipelines for drainage, gabion wall and a pre-engineered metal building. Existing Site Description The 25-acre site is located immediately east of Lower Klamath Lake Road and approximately 12 miles south of Klamath Falls in southern Klamath County, Oregon. The site lies at the southwest flank of the Klamath Hills adjacent to farmland reclaimed from the former Lower Klamath Lake. The site can be divided into two areas, including an irregularly shaped 21-acre area, identified as the northern portion, as well as an approximately 4.7-acre rectangular area adjacent to the Lower Klamath Lake Road identified as the southern portion. The site is currently occupied by a private fish hatchery. The majority of the site is lightly developed with facilities operated by the current fish hatchery, which includes several dozens of lined hatchery ponds and three tarp-covered workshops. The hatchery site is surrounded by undeveloped juniper and sagebrush grassland. Existing access roadways at the site are mostly surfaced with gravel; however, many of the pathways are undeveloped and consist of native soils. A geothermal well is located south of the southern portion of the site with metal piping that routes the hot geothermal water to cooling ponds far northeast of the northern portion of the site. Site Geotechnical Conditions Subsurface conditions encountered in geotechnical investigations performed at the site include gravel road base, reworked site soil fill, and residual soil overlying Tertiary sedimentary rocks that extended to the depths explored. Topsoil was observed in few of the explorations. although generally poorly developed due to the arid weather at the site. All explorations encountered and terminated in Tertiary sedimentary rocks at the site, which consist of tuffaceous mudstone with minor occurrences of sandstone. While considered bedrock, relative hardness of these materials was generally R0 to R1 (extremely soft to very soft) with minor zones of R2 and R3 (soft to medium hard) and was easily excavated/drilled through during explorations. The bedrock was observed below a thin layer of topsoil or crushed rock or directly at the surface in many explorations, especially in areas where cuts were made during initial grading at the site. Where not exposed at the surface, depth to bedrock varied between 2 and 7 feet bgs across the site, although it is deeper in areas of extensive fill, such as at exploration location B-6 where bedrock was observed at approximately beneath 12.5 feet bgs. Influent Retention Pond (IRP) The Influent Retention Pond will provide over 1.08 acres of pond surface area for geothermal tempering. The construction of the IRP will require excavation and embankment construction to provide a 3 to 1 side slope, an earthen perimeter berm, and a 12-foot wide access roadway surrounding the IRP. The overall depth of the IRP will be 10-feet, providing 9 feet of water storage and tempering depth and 1 foot of freeboard. The entirety of the pond will be lined with a vented, impermeable liner. A layer of sand shall be placed between the liner and the subgrade at the bottom of the pond. Within the berm of the IRP, an overflow structure and two water supply intake structures will be constructed to allow water to be moved from the IRP to the aquaculture ponds. Aquaculture Ponds Up to ten aquaculture ponds will be constructed. Aquaculture ponds will be 1/8-acre and -acre surface area. Each pond will have a perimeter earthen berm and a 10-foot or 12-foot wide access roadway on all sides of the pond. The entirety of the pond will be lined with a vented, impermeable liner. A layer of sand shall be placed between the liner and the subgrade at the bottom of the pond. Within the berm of each pond, a cast-in-place concrete kettle will be constructed to facilitate fish harvesting, pond water surface management and pond drainage. Kettles will include stop log and screen channels, and a concrete stairway on the exterior face of the kettle extending from the top of berm to the bottom of pond. Water supply pipes will be constructed to feed each aquaculture pond, including pipes for supply of geothermal supply water from the on-site well and supply of water from the IRP. Discharges for these water sources will be positioned above the water surface at multiple points on each pond. Drainage pipes will be constructed at each pond to facilitate discharge of water for conveyance downstream to additional ponds (flow in series) and for complete drainage of the pond to the Pond Drain Pipeline. Supply and drainage pipes will be routed to each of ponds within the limits of the pond access roads. Water supply pipes will typically be buried within the access roads with 3 to 4 feet of cover and drainage pipes will typically be buried with 3 to 7 feet of cover. Access Roads Access roads will be constructed on prepared subgrade covered with a geotextile separation fabric. Access road surfacing materials will include asphalt concrete pavement and base aggregate conforming to Oregon Department of Transportation Standard Specifications for Construction. Access road surfacing requirements will vary based on the anticipated use of the access road. Overall the project will include approximately 250 feet of asphalt concrete paved access road and 2,000 to 5,000 feet of roadway surfaced with base aggregate, depending on the awarded bid items. Generally, roads will be graded with a 2% cross slope, however roads between aquaculture ponds will be flat, with no longitudinal or cross slope. Geothermal Supply (GS) Pipeline The construction of 2,990 linear feet of new 8-inch diameter geothermal supply pipeline from the existing well within southern portion of the property to the proposed IRP will include approximately 1,120 feet of buried pipeline across the southern portion of the site, routed adjacent of the existing above grade geothermal supply, and approximately 1,870 feet of buried pipeline routed adjacent to the proposed primary access road north to the IRP. The GS pipeline will be buried with a typical cover depth of 3 feet. Construction of the GS pipeline will require maintenance and protection of existing water supply pipelines serving the existing hatchery operation. Pond Drain Pipeline The pond drain pipeline consists of a 1,035 foot, 24-inch gravity pipeline and five precast catch basin structures. The pipeline will be constructed within and adjacent to a new gravel access road. A segment of the pipeline, approximately 126 feet in length, will be partially exposed and constructed of reinforced concrete pipe placed on concrete cradles. The remainder of the pipeline will be buried and will be constructed of polyvinyl chloride (PVC) pipe, burial depth varies from 0 to 15 feet along the pipeline alignment. Four of the five precast catch basin structures will be 48-inch diameter, with flat top sections. One of the five precast catch basin structures will be 72-inch diameter, with a flat top section and slide gate mounted on the outlet pipe. Pre-Engineered Metal Building The pre-engineering building will consist of a 24-foot wide and 40-foot long metal building structure and a concrete slab foundation. The building will be used for storage of materials and supplies used by the hatchery operators. The building will be located adjacent existing aquaculture operations buildings on sloped area within the southern portion of the site. Excavation will be required to establish the footprint for the building foundation, maximum depth of excavation for the building is approximately 5 feet. The site area disturbed during building construction will be restored with topsoil, mulch and seeding. Access is available to the building location on an existing gravel surfaced access road which is approximately 10-12 feet wide. Bid Items Base Bid Base Bid includes but is not limited to construction of 1.08 acre, lined Influent Retention Pond (IRP) water storage pond, pond overflow structure and two water supply intake structures and associated excavation, embankment, grading, seeding; construction of approximately 2,250 lf of gravel surfaced and asphalt concrete surfaced access road varying in width from 12 to 24 feet, ditches and associated excavation, embankment, grading and seeding; construction of 2,990 feet of 8-inch diameter geothermal supply pipeline, stubs for supply to future ponds along the pipeline alignment, discharge laterals for supply to the IRP, associated trenching, bedding and backfill; construction and maintenance of temporary erosion and sedimentation control measures on the project site. Bid Option No. 1 Bid Option No. 1 includes but is not limited to construction of approximately 1,035 feet of 24-inch diameter pond drain pipeline, including five catch basin structures. Pipeline shall be buried polyvinyl chloride pipe and above grade reinforced concrete pipe in concrete pipe cradles. Bid Option No. 2 Bid Option No. 2 has already been completed to construction a 960 square foot pre-engineered metal building and concrete foundation, associated excavation, grading and seeding. Bid Option No. 3 Bid Option No. 3 includes but is not limited to construction of four 1/8-acre, lined, earthen berm aquaculture ponds and associated access roads, crushed stone road surfacing, water supply pipelines, cast-in-place concrete pond kettles, and pond drainage pipelines. Bid Option No. 4 Bid Option No. 4 includes but is not limited to construction two 1/4-acre, lined, earthen berm aquaculture ponds and associated access roads, crushed stone road surfacing, water supply pipelines, cast-in-place concrete pond kettles, and pond drainage pipelines. Bid Option No. 5 Bid Option No. 5 includes but is not limited to construction of four 1/4-acre, lined, earthen berm aquaculture ponds and associated access roads, crushed stone road surfacing, water supply pipelines, cast-in-place concrete pond kettles, and pond drainage pipelines. Documents will be posted to and be available on the https://beta.sam.gov/ web site on or about mid February of 2022. Prior to submission of bid, interested contractors must be registered in the System for Award Management (SAM) in order to participate in this requirement. The SAM can be found at https://www.sam.gov. Payments will be made via Electronic Funds Transfer using the data within the SAM registration database. Contracting Officer and Point of Contact information for this requirement is: Karl Lautzenheiser U.S. Fish and Wildlife Service, Region 10 Contracting Officer: Karl Lautzenheiser Email: contact@example.gov All inquiries and questions shall be submitted in writing; no verbal questions will be accepted.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS