Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on March 31, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y--Peoria Riverfront Ecosystem Development Project, Illinois Waterway, River Miles 165.5-166.1, Tazewell County, Illinois.

Awarded
W912EK-09-R-0010Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
International
Construction of Big White Pickleball Courts
Solicitation # RDKB-26-PBCBW
The Regional District of Kootenay Boundary (RDKB) is soliciting bids for the construction of two pickleball courts at the Big White Ski Resort, specifically located at the Happy Valley Skating Rink in British Columbia. This unit price contract encompasses a comprehensive scope of work including earthworks, site grading, drainage, the removal of oversized boulders, pavement construction, concrete curbing, asphalt paving, and court surfacing. Key deliverables include the installation of cast-in-place net pole bases and the provision of survey layout and project record documents. The project is scheduled for substantial completion by June 7, 2027, with final completion required by June 15, 2027. Prospective bidders must submit their proposals in PDF format via email to Mark Daines by the December 11, 2026, deadline. Submissions must include detailed company information, a designated Project Manager as the single point of contact, at least two relevant references, and a comprehensive fee structure including a total maximum upset fee and a schedule of hourly rates. Bidders must also provide a work plan, methodology, and a list of all proposed subconsultants. Mandatory requirements include the ability to maintain Comprehensive General Liability Insurance of at least 5,000,000.00 CAD, compliance with the British Columbia Workers Compensation Act, and the submission of a Health and Safety Manual and Occupational Health and Safety Plan prior to commencing onsite work. Award decisions are based on a ranking process, and the successful proponent must provide performance security within 10 days of being deemed the highest ranked.
Regional District of Kootenay-Boundary

POSTED

1 day ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Peoria Riverfront Ecosystem Development Project involves the construction of a 21-acre island in Tazewell County, Illinois, located between river miles 165.5 and 166.1. The contractor is responsible for utilizing a high-solids dredging technique to fill geotextile containers with fine-grained river bottom sediments to form the island perimeter and interior. This process includes excavating a channel of specific depth and side slopes to support fish habitat, removing all encountered debris from the site, and installing erosion protection stone in designated areas. A mandatory test section requiring a second layer of stacked geotextile containers must also be completed. The scope of work requires the movement of up to 125,000 cubic yards of material within a single construction season. Additionally, the contractor must provide a boat and field office for government quality assurance activities. While this contract covers the initial construction and perimeter work, the interior filling to finished grade will be handled under a separate Stage 2 contract. The estimated order of magnitude for this project ranges from 1,000,000 to 5,000,000 dollars.

General Info

Agency

N/A

Contract Value

$2,971,611.68

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

IL, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

5 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from Jan 6, 2009 to Jan 15, 2009. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
ContactsNo contacts available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
A 21-acre island will be constructed by placing geotextile containers on the river bottom (in 1 to 5 feet of water) around the perimeter of the proposed island footprint. The geotextile containers will be filled with fine-grained river bottom sediments utilizing a high-solids dredging technique that will be proposed by the Contractor. The river bottom material will be excavated in a manner to create a channel of prescribed depth and side slopes around the entire constructed island for fish habitat. During excavation, the contractor should anticipate encountering debris, and will separate and remove all debris from the project site. Once the geotextile containers are filled to the prescribed height, additional dredged material will be placed within the island footprint utilizing the same high-solids method. Erosion protection stone will also be placed adjacent to the geotextile containers in defined areas. Lastly, a test section is required, which will consist of constructing a second layer of geotextile containers stacked on top of the first layer. The contract will require up to 125,000 cubic yards of material in one construction season utilizing the approved high-solids dredging technique. The contractor will also be required to provide a boat and field office for the Government to utilize for quality assurance activities. The interior of the island will be filled to finished grade under a separate contract (Stage 2). Estimated Order of Magnitude for this project: $1,000,000 to $5,000,000 Plans and Specs will be available on or about 17 November 2008.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS