This Solicitation opportunity from Department Of Defense was posted on August 12, 2015. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y--River Chamber Completion at Charleroi Locks and Dam, Monongahela River, PA

Awarded
W911WN15B0005Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Henry H. Bradby Park Phase 1
Solicitation # 2027-7110-114
Solicitation 2027-7110-114 is an Invitation for Bids for Phase 1 construction of Henry H. Bradby Park in Rushmere, Isle of Wight County, Virginia. The project involves the development of a 51.67-acre county-owned parcel, with approximately 6.63 acres of land disturbance and 45.038 acres remaining as undisturbed open space. The scope of work includes site preparation, clearing, demolition, grading, drainage, and the installation of erosion and sediment control and stormwater management facilities. Additionally, the contractor will construct parking trails, recreational facilities, site furnishings, and landscaping, all while adhering to the 2018 Virginia Statewide Building Code and the latest Virginia Stormwater Management Handbook. The project is funded via the National Park Service's Land and Water Conservation Fund, making it subject to strict federal oversight, including Build America, Buy America Act material sourcing restrictions and compliance with the Federal Civil Rights Act of 1964. Award will be granted to the lowest responsive and responsible bidder. The performance period requires substantial completion within 300 days of the notice to proceed, with final completion due 45 days thereafter. Financial requirements include a 5% retainage on construction projects and the provision of performance and payment bonds, with a specific bid bond required for bids exceeding 500,000 dollars. Bids must be submitted through the designated procurement portal by November 16, 2026.
Parks & Recreation

POSTED

about 3 hours ago

DEADLINE

in 17 days
NAICS: 237990
New
Federal
Small Business Multiple Award Task Order Contract (MATOC) for the Missouri River Bank Stabilization and Navigation Project (BSNP)
Solicitation # PANNWD26P0000030936
The U.S. Army Corps of Engineers, Kansas City District, is conducting market research for the Bank Stabilization and Navigation Program to identify qualified contractors capable of performing complex riverine construction work along the Missouri River, from River Mile 0 near St. Louis, Missouri, to River Mile 553 near Nebraska City, Nebraska. The work involves constructing, modifying, or repairing stone dikes, revetments, bank paving, revetment overlays, and excavation of notches, all of which must be executed using floating equipment due to the absence of land access. Operations require mobilization of barges to transport graded stone from quarries and placement via track-hoe from work barges, with equipment needing to operate in water depths of four feet or more. The Government plans to establish a Multiple-Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Task Order Contract with a combined ceiling of $50 million, consisting of a three-year base period and a two-year optional ordering period. The North American Industry Classification System code is 237990, with a small business size standard of $45 million, and businesses of all sizes are encouraged to respond, though small, 8(a), HUBZone, service-disabled veteran-owned, and women-owned businesses are specifically encouraged to participate, as responses will inform potential set-asides. Respondents must submit a ten-page capability statement detailing their business size, UEI and CAGE codes, bonding capacity, experience with similar projects completed in the last five years, subcontracting arrangements, and joint venture structure, along with organizational contact information. All submissions must be provided electronically in Word or PDF format by the deadline of 12 p.m. CDT on June 1, 2026, to the designated contract specialist and contracting officer. This is a sources sought notice only, not a solicitation, and no funds are available for response preparation or reimbursement. Responses are voluntary, non-binding, and will be used solely for market research to shape future procurement decisions, with proprietary information protected from disclosure.
W071 Endist Kansas City

POSTED

about 5 hours ago

DEADLINE

N/A

General Info

Contract Value

$289,554,225.22

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

USACE District, Pittsburgh 1000 Liberty Avenue, W.S. Moorhead Federal Building, 22nd Floor Pittsburgh PA 15222-4186 US, PA

Set-Aside

NONE

Award Issued Date

Documents

23

Amendment 0001 to Solicitation W911WN-15-B-0005

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation W911WN-15-B-0005

PDF, High priority: read this firstamendment
High

Amendment 0003 to Solicitation W911WN-15-B-0005

PDF, High priority: read this firstamendment
High

Bid Schedule - Charleroi Locks and Dam River Chamber Completion (AM2)

XLSX, High priority: read this first14 pages · bid-schedule
High

Charleroi Locks and Dam - Monoliths M-22 to M-27 Reference Drawings

PDF, High priority: read this firstspecifications
High

Charleroi Locks and Dam - River Chamber Completion Bid Schedule AM1

XLSX, High priority: read this first14 pages · bid-schedule
High

Charleroi Locks and Dam River Chamber Completion Bid Schedule AM2

XLSX, High priority: read this first14 pages · bid-schedule
High

Charleroi River Chamber Completion Detailed Bid Abstract

PDF, High priority: read this firstbid-abstract
High

Solicitation W911WN-15-B-0005: Charleroi Locks and Dam River Chamber Completion

PDF, High priority: read this firstifb
High

W911WN-15-B-0005 Contract Drawings Volume 2 - Concrete and Reinforcement Notes

PDF, High priority: read this firstspecifications
High

W911WN-15-B-0005 Contract Drawings - Volume 3

PDF, High priority: read this firstspecifications
High

W911WN-15-B-0005 Contract Drawings - Volume 4

PDF, High priority: read this firstspecifications
High

W911WN-15-B-0005 Reference Drawings Vol 2 - Monongahela River New Lock No. 4

PDF, High priority: read this firstspecifications
High

W911WN-15-B-0005 River Chamber Completion Technical Specifications

PDF, High priority: read this firstspecifications
High

W911WN-15-B-0005 River Chamber Completion - Volume 2 Attachments to Specifications

PDF, High priority: read this firstspecifications
High

Pre-Proposal Site Visit Attendees - W911WN-15-B-0005

PDF, Low priorityindustry-day
Low

W911WN-15-B-0005 Bid Results - Charleroi Locks and Dam

PDF, Low prioritybid-results
Low

Charleroi_RCC_Animation_Video.wmv

OCTET-STREAM

W911WN-15-B-0005_-_Contract_Drawings_-_Volume_1.pdf

PDF

W911WN-15-B-0005_REFERNCE_DRAWINGS_VOL_1.pdf

PDF

W911WN-15-B-0005_REFERNCE_DRAWINGS_VOL_3.pdf

PDF

W911WN-15-B-0005_REFERNCE_DRAWINGS_VOL_4.pdf

PDF

W911WN-15-B-0005_REFERNCE_DRAWINGS_VOL_5.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

15 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Aug 3, 2015 to Aug 4, 2015. The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Aug 4, 2015 to Aug 3, 2015. The notice description changed.

Notice updated

Response deadline changed from Aug 3, 2015 to Aug 6, 2015. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Pittsburgh
Contacts1 person available
OfficePITTSBURGH, PA, 15222-4198, USA
Office AddressPITTSBURGH, PA, 15222-4198, USA
Contacts

Full Description

Show more
The U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves the construction of the River Chamber Completion at Charleroi Locks and Dam, Monongahela River, PA. The major features of the requirement are identified below: 1. Middle Wall Monoliths M-1 to M-21. Construction consists of building steel cofferboxes in order to construct the new reinforced concrete Middle Wall that is approximately 835 feet by 35 feet in plan. Construction of the Middle Wall is to be performed using a combination of in-the-wet and in-the-dry construction methods. The lock wall monoliths will be built using a combination of tremie concrete and cast-in-place concrete within a cofferbox. Construction of the lock wall involves underwater excavation of both soil and rock; heavy lifting and placement of sheet piles, king piles and associated steel waler and strut installation for cofferbox construction from a floating plant; and installation of 72 inches diameter drilled shaft foundations that are constructed in-the-wet. 2. Middle Wall Control Tower and Shelter Buildings. Construction of one Control Tower and two Shelter Buildings is required. The Control Tower is approximately 30 feet by 20 feet in plan, and approximately 80 feet tall. The Shelter Buildings are each approximately 15 feet by 12 feet in plan, and approximately 25 feet tall. All building construction consists of cast-in-place reinforced concrete that will be constructed in-the-dry. 3. Secant Pile Wall. The Secant Pile Wall is approximately 600 feet long. The wall consists of a series of drilled rock sockets approximately 3 feet in diameter, that are backfilled with tremie concrete and heavy steel wide flange sections. Construction of the Secant Wall is to be performed in-the-wet. 4. Cofferdam Cells. Construction and removal of the temporary cofferdam system consists of two large diameter sheet pile cells, two small diameter sheet pile cells, and three intermediate sheet pile cells that are formed by arcs between the large diameter cells. The large diameter cells are each approximately 65 feet in diameter, the small diameter cells are each approximately 25 feet in diameter, and each of the intermediate cells are approximately 20 feet wide. 5. Heavy Demolition. Demolition items include the existing Original River Wall, existing downstream closure cell, existing wall closure, and the removal of various items within the existing Land Chamber in preparation for closure. Both in-the-wet and in-the-dry demolition is required. 6. Service Bridge (Footbridge). Installation of a new section of the service bridge (footbridge) is required. The new footbridge is approximately 260 feet long and consists of fabricated steel plate girders. 7. Various Cast-In-Place Reinforced Concrete. Items include bulkhead and miter sills, lock floor culverts, lock floor slab, River Wall top lifts and wall facing, and storage foundations. These items will be constructed in-the-dry. 8. Mechanical and Electrical. The contract requires substantial installation of various mechanical and electrical items within the lock walls and building systems. 9. Full lock functionality and testing of the mechanical and electrical systems. 10. Guide Wall Stabilization. Stabilizing of the existing Lower Guide Wall is required. Construction includes soil excavation and placement of large riprap stone berms. Both in-the-wet and in-the-dry construction is required. 11. Closure of the Existing Land Chamber. After completion of the new River Chamber, the existing Land Chamber will be closed. The closure requires construction of three large diameter sheet pile cells, one small diameter sheet pile cell, and five intermediate sheet pile cells that are formed by arcs between the large diameter cells. The large diameter cells are each approximately 50 feet in diameter, the small diameter cell is approximately 15 feet in diameter, and each of the intermediate cells are approximately 10 feet wide. 12. Heavy Marine Lifting. Several Government Furnished items are required to be transported and installed with use of a floating plant. Some items require heavy lifting including steel miter gates, Guard Wall precast concrete box beam and shaft enclosure, steel lock and valve bulkheads, steel culvert liners, and steel floating mooring bitts. Construction work will occur in close proximity to waterway traffic. The existing landside lock chamber is currently operated 24 hours a day, 7 days a week. Maintaining unimpeded access (to the extent possible under this contract) of this facility to waterway traffic and maintaining stability of the existing middle wall are underlying goals of this contract. Environmental protection will include requirements to remain in compliance with the NPDES permitting at both VH and the Concrete Batch Plant. Operation and maintenance of the Government owned Concrete Batch Plant, concrete delivery system, and ancillary items will be required. Maintenance of the batch plant will include repair and/or replacement of various items necessary for continued operation of the plant. Disposal of suitable excavated materials and concrete rubble without embedded ferrous material will be required. The offloading area at Victory Hollow (VH), approximately 7 miles downstream of Charleroi Locks and Dam, will be utilized to stockpile and dispose of the suitable materials from the construction activities. Ferrous and other construction waste material will be disposed at a commercially permitted facility licensed to accept the waste or recycled if applicable Overlapping contract work - A portion of the new middle wall M22-M27 is being constructed concurrently with the River Chamber completion contract. The overlap will be incorporated into the River Chamber Completion Contract as follows: Concrete - While the M22-M27 contract is ongoing, all concrete will be produced by the M22-M27 contractor. As such, the concrete for the subject contract will be provided as Government Furnished Material and the contractor will only be paid costs associated with transporting and placing the concrete. After the M22-M27 contract is complete, the contractor will take over operation and maintenance of the Government owned Concrete Batch Plant, concrete delivery system, and ancillary items. The contractor will also be responsible for maintenance of the batch plant to include repair and/or replacement of various items necessary for continued operation of the plant. It is anticipated the contract documents will be structured using a base contract and multiple awardable options for various features of the project. At the end of the contract, a single fully operational 84 ft by 720 ft lock chamber will occur. The magnitude of the project is between $250,000,000 and $500,000,000. This procurement will be advertised on an Unrestricted basis. The Invitation for Bid (IFB) will be issued approximately June 5, 2015 online only through the Federal Business Opportunities website; therefore, requests for hardcopies of the specifications and drawings will not be honored.

More opportunities from Department Of Defense → W072 Endist Pittsburgh

Same awarding agency

NAICS: 237990
New
Federal
JP Murtha Float Mooring Bitts Retrofit
Solicitation # W911WN27BA001
The United States Army Corps of Engineers, Pittsburgh District, is soliciting a Firm-Fixed-Price construction contract for the John P. Murtha Floating Mooring Bitts Retrofit at the John P. Murtha Locks and Dam in Westmoreland County, Pennsylvania. This project requires complex in-the-wet construction to install Government-furnished floating mooring bitts into contractor-fabricated embedded frames on the existing river chamber middle wall. The scope of work includes engineering design, the fabrication and installation of two structural steel dewatering boxes with a maximum 90-day duration, heavy concrete demolition using wire-sawing and core drilling, and the integration of cast-in-place concrete. The contractor must provide a fully compliant floating plant, certified commercial dive teams for underwater rigging and sealing, and adhere to EM 385-1-1 safety standards. The total period of performance is 730 calendar days following the Notice to Proceed. This is an unrestricted full and open solicitation under NAICS code 237990, with a small business size standard of 45 million dollars. Award will be granted to the lowest responsive and responsible offeror, with a 10 percent price evaluation preference provided to HUBZone firms. Bidders must be registered in the System for Award Management and the Procurement Integrated Enterprise Environment, where all electronic bids must be submitted. The contract is subject to the Davis-Bacon Act for wage determinations and requires a three-phase Quality Control System. Key deliverables include the fully operational mooring bitt assemblies and comprehensive quality control documentation. Performance and payment bonds are required, with the performance bond set at 100 percent of the original contract price.
Other Heavy and Civil Engineering Construction

POSTED

3 days ago

DEADLINE

in 6 days
View Details
NAICS: 238210
New
Federal
RFI - Survey for Advance Contract Initiative Temporary Emergency Power
Solicitation # ACI-TEP-Survey
The Department of Defense, through the USACE Pittsburgh District, is conducting a sources-sought fact-finding exercise for an Advance Contract Initiative regarding Temporary Emergency Power. This initiative aims to establish a contract prior to federal declared emergencies to ensure rapid response capabilities across the United States and its territories. The current objective is to gather industry feedback on logistics, mobilization sequencing, subcontractor relationships, and cost drivers to inform future scope considerations and efficiency improvements. The scope of work involves providing all labor, equipment, and materials to support temporary emergency power activities through three phases: Mission Readiness, Mission Mobilization, and Mission Execution. Key responsibilities include conducting pre-installation inspections to determine generator sizing and connection methods, managing equipment at staging areas, and executing the installation of generators and external fuel tanks. Contractors must adhere to specific FEMA Bill of Materials standards and maintain 24-hour response operations. Operational requirements include the potential deployment of a five-person Advanced Echelon team and the appointment of a Site Safety and Health Officer. Performance is measured by the accuracy of installation assessments and the ability to mobilize assets to staging areas in a fully operational status. The process is governed by strict reporting timelines, including a 30-minute voice communication response standard and a 60-minute notification window for mishaps or incidents.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

4 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
Federal
Canonsburg-Houston, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation
Solicitation # W911WN27QA005
The U.S. Army Corps of Engineers, Pittsburgh District, is soliciting a Firm-Fixed-Price purchase order for the rehabilitation of the Canonsburg-Houston Local Protection Project in Strabane, Washington County, Pennsylvania. This total small business set-aside project, under NAICS 237990, focuses on restoring federal project integrity and design conveyance capacity along Chartiers Creek following severe storm damage. The scope of work includes vegetation clearing, the installation of erosion and sediment controls, the creation of temporary water diversions, and the removal and replacement of damaged geotextile fabric and riprap. The anticipated construction cost is between $150,000.00 and $350,000.00, with an expected award date of December 11, 2026. The project must be completed within 365 calendar days after the written Notice to Proceed, with a performance start window of 10 days. Work is restricted to weekdays from 7:30 AM to 4:00 PM. The government will award the contract based on best value, evaluating quotes on price and past performance. Key requirements include the provision of a Project Superintendent, a CQMC-certified Quality Control System Manager, and a dedicated Site Safety and Health Officer. Compliance with USACE EM 385-1-1 (2024) and the Davis-Bacon Act is mandatory. Performance and payment bonds are required at 100 percent of the original contract price, and liquidated damages for delays are set at $566.00 per calendar day.
Other Heavy and Civil Engineering Construction

POSTED

8 days ago

DEADLINE

in 24 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS