Y--River Chamber Completion at Charleroi Locks and Dam, Monongahela River, PA

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The U.S. Army Corps of Engineers, Pittsburgh District, is preparing for a full and open competition recompete for the River Chamber Completion at Charleroi Locks and Dam on the Monongahela River in Pennsylvania. The current contract, held by a joint venture of Trumbull Corporation and Brayman Construction Corporation, has a value of approximately 289.5 million dollars and is expected to end on October 31, 2026. This high-confidence recompete opportunity involves complex marine construction and heavy civil engineering to create a single operational 84 by 720 foot lock chamber. The scope of work includes the construction of middle wall monoliths, a control tower, shelter buildings, and a secant pile wall using both in-the-wet and in-the-dry methods. Key requirements involve heavy demolition of existing structures, the installation of a service footbridge, and the closure of the existing land chamber using sheet pile cells. The project also necessitates heavy marine lifting for government-furnished items, mechanical and electrical system installations, and the operation and maintenance of a government-owned concrete batch plant. The estimated magnitude of the project is between 250 million and 500 million dollars, utilizing a firm fixed price pricing structure.

General Info

USACE recompete for Charleroi Locks construction, estimated between 250 and 500 million dollars.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

USACE District, Pittsburgh 1000 Liberty Avenue, W.S. Moorhead Federal Building, 22nd Floor Pittsburgh PA 15222-4186 US, PA, 150620001, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

pre-forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Pittsburgh
Contacts1 person available
OfficePITTSBURGH, PA, 15222-4198, USA
Office AddressPITTSBURGH, PA, 15222-4198, USA
Contacts

Full Description

Show more
Predicted recompete opportunity based on federal award data.
Current Contract: W911WN15C0009 Incumbent: TRUMBULL CORPORATION AND BRAYMAN CONSTRUCTION CORPORATION, A JOINT VENTURE Contract Value: $289,554,225.22 Potential End Date: 2026-10-31T00:00:00.000Z Competition: FULL AND OPEN COMPETITION Pricing: FIRM FIXED PRICE Classification: full-recompete (Confidence: high - 90/100)
The U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves the construction of the River Chamber Completion at Charleroi Locks and Dam, Monongahela River, PA. The major features of the requirement are identified below: 1. Middle Wall Monoliths M-1 to M-21. Construction consists of building steel cofferboxes in order to construct the new reinforced concrete Middle Wall that is approximately 835 feet by 35 feet in plan. Construction of the Middle Wall is to be performed using a combination of in-the-wet and in-the-dry construction methods. The lock wall monoliths will be built using a combination of tremie concrete and cast-in-place concrete within a cofferbox. Construction of the lock wall involves underwater excavation of both soil and rock; heavy lifting and placement of sheet piles, king piles and associated steel waler and strut installation for cofferbox construction from a floating plant; and installation of 72 inches diameter drilled shaft foundations that are constructed in-the-wet. 2. Middle Wall Control Tower and Shelter Buildings. Construction of one Control Tower and two Shelter Buildings is required. The Control Tower is approximately 30 feet by 20 feet in plan, and approximately 80 feet tall. The Shelter Buildings are each approximately 15 feet by 12 feet in plan, and approximately 25 feet tall. All building construction consists of cast-in-place reinforced concrete that will be constructed in-the-dry. 3. Secant Pile Wall. The Secant Pile Wall is approximately 600 feet long. The wall consists of a series of drilled rock sockets approximately 3 feet in diameter, that are backfilled with tremie concrete and heavy steel wide flange sections. Construction of the Secant Wall is to be performed in-the-wet. 4. Cofferdam Cells. Construction and removal of the temporary cofferdam system consists of two large diameter sheet pile cells, two small diameter sheet pile cells, and three intermediate sheet pile cells that are formed by arcs between the large diameter cells. The large diameter cells are each approximately 65 feet in diameter, the small diameter cells are each approximately 25 feet in diameter, and each of the intermediate cells are approximately 20 feet wide. 5. Heavy Demolition. Demolition items include the existing Original River Wall, existing downstream closure cell, existing wall closure, and the removal of various items within the existing Land Chamber in preparation for closure. Both in-the-wet and in-the-dry demolition is required. 6. Service Bridge (Footbridge). Installation of a new section of the service bridge (footbridge) is required. The new footbridge is approximately 260 feet long and consists of fabricated steel plate girders. 7. Various Cast-In-Place Reinforced Concrete. Items include bulkhead and miter sills, lock floor culverts, lock floor slab, River Wall top lifts and wall facing, and storage foundations. These items will be constructed in-the-dry. 8. Mechanical and Electrical. The contract requires substantial installation of various mechanical and electrical items within the lock walls and building systems. 9. Full lock functionality and testing of the mechanical and electrical systems. 10. Guide Wall Stabilization. Stabilizing of the existing Lower Guide Wall is required. Construction includes soil excavation and placement of large riprap stone berms. Both in-the-wet and in-the-dry construction is required. 11. Closure of the Existing Land Chamber. After completion of the new River Chamber, the existing Land Chamber will be closed. The closure requires construction of three large diameter sheet pile cells, one small diameter sheet pile cell, and five intermediate sheet pile cells that are formed by arcs between the large diameter cells. The large diameter cells are each approximately 50 feet in diameter, the small diameter cell is approximately 15 feet in diameter, and each of the intermediate cells are approximately 10 feet wide. 12. Heavy Marine Lifting. Several Government Furnished items are required to be transported and installed with use of a floating plant. Some items require heavy lifting including steel miter gates, Guard Wall precast concrete box beam and shaft enclosure, steel lock and valve bulkheads, steel culvert liners, and steel floating mooring bitts. Construction work will occur in close proximity to waterway traffic. The existing landside lock chamber is currently operated 24 hours a day, 7 days a week. Maintaining unimpeded access (to the extent possible under this contract) of this facility to waterway traffic and maintaining stability of the existing middle wall are underlying goals of this contract. Environmental protection will include requirements to remain in compliance with the NPDES permitting at both VH and the Concrete Batch Plant. Operation and maintenance of the Government owned Concrete Batch Plant, concrete delivery system, and ancillary items will be required. Maintenance of the batch plant will include repair and/or replacement of various items necessary for continued operation of the plant. Disposal of suitable excavated materials and concrete rubble without embedded ferrous material will be required. The offloading area at Victory Hollow (VH), approximately 7 miles downstream of Charleroi Locks and Dam, will be utilized to stockpile and dispose of the suitable materials from the construction activities. Ferrous and other construction waste material will be disposed at a commercially permitted facility licensed to accept the waste or recycled if applicable Overlapping contract work - A portion of the new middle wall M22-M27 is being constructed concurrently with the River Chamber completion contract. The overlap will be incorporated into the River Chamber Completion Contract as follows: Concrete - While the M22-M27 contract is ongoing, all concrete will be produced by the M22-M27 contractor. As such, the concrete for the subject contract will be provided as Government Furnished Material and the contractor will only be paid costs associated with transporting and placing the concrete. After the M22-M27 contract is complete, the contractor will take over operation and maintenance of the Government owned Concrete Batch Plant, concrete delivery system, and ancillary items. The contractor will also be responsible for maintenance of the batch plant to include repair and/or replacement of various items necessary for continued operation of the plant. It is anticipated the contract documents will be structured using a base contract and multiple awardable options for various features of the project. At the end of the contract, a single fully operational 84 ft by 720 ft lock chamber will occur. The magnitude of the project is between $250,000,000 and $500,000,000. This procurement will be advertised on an Unrestricted basis. The Invitation for Bid (IFB) will be issued approximately June 5, 2015 online only through the Federal Business Opportunities website; therefore, requests for hardcopies of the specifications and drawings will not be honored.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
CP25014
Solicitation # CP25014
Solicitation CP25014 is a unit price contract issued by the Port of Lake Charles (Lake Charles Harbor & Terminal District) for the Industrial Park East Rail Extension and Trans-loading Yard project located in Calcasieu Parish, Louisiana. The scope of work requires the contractor to provide all labor, materials, equipment, and supplies necessary to complete the project according to best industry practices and contract specifications. Key deliverables include mobilization, clearing and grubbing of 10 acres, drainage excavation, structural fill embankment, lime treatment of 37,000 square yards, and the installation of 602 linear feet of barbed wire fencing and double swinging driveway gates. The contract will be awarded to the lowest qualified bidder who complies with all requirements. Bidders must submit proposals by November 19, 2026, using the Louisiana Uniform Public Work Bid Form, ensuring every requested item has a unit price. The successful bidder must provide performance and payment bonds from an approved or A-rated Louisiana domiciled insurance company. Project administration includes a bi-monthly schedule update requirement and a retainage policy of 10 percent for contracts up to 500,000 dollars and 5 percent for those exceeding that amount. Compliance with the Clean Air Act, Federal Water Pollution Control Act, and Equal Opportunity clauses is required, with specific attention to FEMA assistance for subcontracts exceeding 150,000 dollars. Inspection and acceptance are managed by the Department, utilizing DOTD standards for earthwork and the International Roughness Index for concrete pavement.
Port of Lake Charles

POSTED

about 1 hour ago

DEADLINE

in 21 days
View Details
NAICS: 237990
New
SLED
Agricultural INNOVATION Farm Project for San Marcos Unified SD
Solicitation # 2026-21
The San Marcos Unified School District is soliciting bids for the Agricultural INNOVATION Farm Project (Solicitation 2026-21) located at 99 Cassou Rd, San Marcos, California. The project scope involves the demolition of an abandoned electrical pole, water pump, and fencing, followed by the installation of underground water and electrical utilities, irrigation lines, a gravel service road, shade structures, storage containers, arbors, and designated planting areas. Work must be performed in strict accordance with the technical specifications, project drawings, and soil report. The estimated period of performance begins December 1, 2026, with a required completion date of April 1, 2027. The contract will be awarded to the lowest responsible bidder. Qualified bidders must hold a valid California Contractor's License and be registered with the California Department of Industrial Relations (DIR), as the project is subject to prevailing wage requirements. Submission requirements include a bid bond for 10 percent of the contract amount, a non-collusion declaration, and references, all submitted via the OpenGov e-procurement portal by November 2, 2026. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract value and adhere to a 3 percent Disabled Veteran Business Enterprise (DVBE) participation goal. All materials must be delivered in original packaging and comply with UL 969 marking and labeling standards.
Curriculum and Instruction

POSTED

about 15 hours ago

DEADLINE

in 4 days
View Details

More opportunities from Department Of Defense → W072 Endist Pittsburgh

Same awarding agency

NAICS: 237990
New
Federal
JP Murtha Float Mooring Bitts Retrofit
Solicitation # W911WN27BA001
The United States Army Corps of Engineers, Pittsburgh District, is soliciting a Firm-Fixed-Price construction contract for the John P. Murtha Floating Mooring Bitts Retrofit at the John P. Murtha Locks and Dam in Westmoreland County, Pennsylvania. This project requires complex in-the-wet construction to install Government-furnished floating mooring bitts into contractor-fabricated embedded frames on the existing river chamber middle wall. The scope of work includes engineering design, the fabrication and installation of two structural steel dewatering boxes with a maximum 90-day duration, heavy concrete demolition using wire-sawing and core drilling, and the integration of cast-in-place concrete. The contractor must provide a fully compliant floating plant, certified commercial dive teams for underwater rigging and sealing, and adhere to EM 385-1-1 safety standards. The total period of performance is 730 calendar days following the Notice to Proceed. This is an unrestricted full and open solicitation under NAICS code 237990, with a small business size standard of 45 million dollars. Award will be granted to the lowest responsive and responsible offeror, with a 10 percent price evaluation preference provided to HUBZone firms. Bidders must be registered in the System for Award Management and the Procurement Integrated Enterprise Environment, where all electronic bids must be submitted. The contract is subject to the Davis-Bacon Act for wage determinations and requires a three-phase Quality Control System. Key deliverables include the fully operational mooring bitt assemblies and comprehensive quality control documentation. Performance and payment bonds are required, with the performance bond set at 100 percent of the original contract price.
Other Heavy and Civil Engineering Construction

POSTED

2 days ago

DEADLINE

in 7 days
View Details
NAICS: 238210
New
Federal
RFI - Survey for Advance Contract Initiative Temporary Emergency Power
Solicitation # ACI-TEP-Survey
The Department of Defense, through the USACE Pittsburgh District, is conducting a sources-sought fact-finding exercise for an Advance Contract Initiative regarding Temporary Emergency Power. This initiative aims to establish a contract prior to federal declared emergencies to ensure rapid response capabilities across the United States and its territories. The current objective is to gather industry feedback on logistics, mobilization sequencing, subcontractor relationships, and cost drivers to inform future scope considerations and efficiency improvements. The scope of work involves providing all labor, equipment, and materials to support temporary emergency power activities through three phases: Mission Readiness, Mission Mobilization, and Mission Execution. Key responsibilities include conducting pre-installation inspections to determine generator sizing and connection methods, managing equipment at staging areas, and executing the installation of generators and external fuel tanks. Contractors must adhere to specific FEMA Bill of Materials standards and maintain 24-hour response operations. Operational requirements include the potential deployment of a five-person Advanced Echelon team and the appointment of a Site Safety and Health Officer. Performance is measured by the accuracy of installation assessments and the ability to mobilize assets to staging areas in a fully operational status. The process is governed by strict reporting timelines, including a 30-minute voice communication response standard and a 60-minute notification window for mishaps or incidents.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 238160
New
Federal
Mosquito Lake Control Tower Structural Standing Seam Metal Roof Replacement
Solicitation # W911WN26QA062
The U.S. Army Corps of Engineers, Pittsburgh District, is soliciting quotes for a 100% Small Business Set-Aside project to replace the structural standing seam metal roof on the Control Tower Building at Mosquito Creek Lake in Cortland, Ohio. This non-commercial construction project, categorized under NAICS 238160, has a rough estimate between $150,000.00 and $350,000.00. The scope of work includes the demolition and disposal of the existing roof system, box gutters, scuppers, and lightning protection, as well as the refurbishment of up to 95 linear feet of cold-formed metal sub-framing. Additional requirements include rerouting vent and exhaust pipes through the masonry side wall, sealing and insulating the concrete roof slab to R-30, and installing a new gutter system and a certified, non-penetrating Lightning Protection System compliant with LPI 175, NFPA 780, and UL 96A. The project will be awarded as a single Firm-Fixed Price contract based on best value, evaluating both price and past performance. The performance period is 365 calendar days from the written Notice to Proceed, with work hours restricted to Monday through Friday, 7:00 AM to 4:00 PM. Key personnel requirements include a Project Superintendent and a Quality Control System Manager, each with at least five years of relevant experience, and a Site Safety and Health Officer meeting EM 385-1-1 qualifications. Performance and payment bonds are required if the contract price exceeds $150,000. Final acceptance is contingent upon successful watertightness testing per AAMA 501:2 procedures and the delivery of a UL Master Label or LPI Certificate of Conformance.
Roofing Contractors

POSTED

6 days ago

DEADLINE

in 1 day
View Details
NAICS: 237990
Federal
Canonsburg-Houston, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation
Solicitation # W911WN27QA005
The U.S. Army Corps of Engineers, Pittsburgh District, is soliciting a Firm-Fixed-Price purchase order for the rehabilitation of the Canonsburg-Houston Local Protection Project in Strabane, Washington County, Pennsylvania. This total small business set-aside project, under NAICS 237990, focuses on restoring federal project integrity and design conveyance capacity along Chartiers Creek following severe storm damage. The scope of work includes vegetation clearing, the installation of erosion and sediment controls, the creation of temporary water diversions, and the removal and replacement of damaged geotextile fabric and riprap. The anticipated construction cost is between $150,000.00 and $350,000.00, with an expected award date of December 11, 2026. The project must be completed within 365 calendar days after the written Notice to Proceed, with a performance start window of 10 days. Work is restricted to weekdays from 7:30 AM to 4:00 PM. The government will award the contract based on best value, evaluating quotes on price and past performance. Key requirements include the provision of a Project Superintendent, a CQMC-certified Quality Control System Manager, and a dedicated Site Safety and Health Officer. Compliance with USACE EM 385-1-1 (2024) and the Davis-Bacon Act is mandatory. Performance and payment bonds are required at 100 percent of the original contract price, and liquidated damages for delays are set at $566.00 per calendar day.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in 25 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS