Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on April 27, 2004. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y -- Rock Creek Trail Construction

Awarded
RFQ-IBET-03-04-049Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
CP25014
Solicitation # CP25014
Solicitation CP25014 is a unit price contract issued by the Port of Lake Charles (Lake Charles Harbor & Terminal District) for the Industrial Park East Rail Extension and Trans-loading Yard project located in Calcasieu Parish, Louisiana. The scope of work requires the contractor to provide all labor, materials, equipment, and supplies necessary to complete the project according to best industry practices and contract specifications. Key deliverables include mobilization, clearing and grubbing of 10 acres, drainage excavation, structural fill embankment, lime treatment of 37,000 square yards, and the installation of 602 linear feet of barbed wire fencing and double swinging driveway gates. The contract will be awarded to the lowest qualified bidder who complies with all requirements. Bidders must submit proposals by November 19, 2026, using the Louisiana Uniform Public Work Bid Form, ensuring every requested item has a unit price. The successful bidder must provide performance and payment bonds from an approved or A-rated Louisiana domiciled insurance company. Project administration includes a bi-monthly schedule update requirement and a retainage policy of 10 percent for contracts up to 500,000 dollars and 5 percent for those exceeding that amount. Compliance with the Clean Air Act, Federal Water Pollution Control Act, and Equal Opportunity clauses is required, with specific attention to FEMA assistance for subcontracts exceeding 150,000 dollars. Inspection and acceptance are managed by the Department, utilizing DOTD standards for earthwork and the International Roughness Index for concrete pavement.
Port of Lake Charles

POSTED

about 3 hours ago

DEADLINE

in 21 days
NAICS: 237990
New
International
CT4692 Programme Support Works Framework
Solicitation # CT4692
The East West Railway Company is procuring a multi-lot Programme Support Works Framework (CT4692) to deliver enabling, survey, and early-stage works necessary to prepare the route for main construction. The framework is designed to accelerate programme readiness and reduce delivery risk through six specialized lots: Lot 0 for a single Principal Contractor/Integrator to manage site safety and coordination; Lot 1 for historic environment and archaeological works; Lot 2 for ground investigation and monitoring; Lot 3 for environmental and ecological surveys; Lot 4 for environmental and ecological mitigation; and Lot 5 for enabling works. The estimated total value is up to 450 million pounds excluding VAT, though this figure is indicative and not a committed spend. The contract is structured with a four-year core term starting February 1, 2028, and optional extensions of two, one, and one year, totaling a potential eight-year duration ending January 31, 2036. Awards will be made using a competitive flexible procedure, with multiple suppliers appointed to most lots to encourage SME and Tier 2/3 participation, except for Lot 0. Evaluation is based on a 30 percent weighting for commercial price, with specific adjustments for social value and technical quality for SMEs. To maintain independence and avoid conflicts of interest, strict award restrictions and ethical wall agreements are implemented to prevent the excessive concentration of services within a single organization.
East West Rail Company Limited

POSTED

about 4 hours ago

DEADLINE

N/A

AI Contract Overview

Show more

This project involves the construction and restoration of Multiple Use Trails within the Rock Creek OHV Area, managed by the Eldorado National Forest. The scope of work includes the construction and restoration of 6,000 feet of 72-inch wide ATV trail on Trail 11E13, as well as the construction and reconstruction of 8,820 feet of 30-inch wide trail on Trail 011. Key technical requirements include the installation of a turnpike, switchback, grid pavement, and a concrete and gabion shall stream ford at the Martin Low Water Crossing. The government estimate for this contract is between 25,000 and 100,000 dollars. While no pre-bid meetings or tours are scheduled, vendors are encouraged to visit the sites located near Placerville, California. The solicitation package was made available on March 11, 2004, with a response deadline of April 8, 2004. Technical inquiries are directed to Bill Walker, while administrative matters are handled by Contracting Officer Denise L. Storms.

General Info

Contract Value

$73,835.5

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

CA

Set-Aside

NONE

Award Issued Date

Documents

1

20040312110350.zip

ZIP

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Eldorado National Forest
Contacts1 person available
OfficePLACERVILLE, CA, 95667, USA
Office AddressPLACERVILLE, CA, 95667, USA
Contacts
Denise L StormsContracting Officer

Full Description

Show more
CONTACT BILL WALKER, +1 (555) 000-0000, WITH TECHNICAL QUESTIONS CONCERNING THIS SOLICITATION. This project consists of the construction and restoration of Multiple Use Trails in the Rock Creek OHV Area. Trail 11E13 involves construction and restoration on 6000 feet of 72-inch wide ATV trail. Trail 011 involves construction and reconstruction of 8,820 feet of 30-inch wide trail. Major items of work are the turnpike, switchback, grid pavement, and a concrete and gabion shall stream ford (Martin Low Water Crossing). All trails are within the Rock Creek OHV Area. From Placerville, California, travel North on State Route 193 to Georgetown, California. Then travel East on Wentworth Springs Road approximately 6.8 miles until Rock Creek Road (12N70) is reached. Travel South on Rock Creek Road 3.5 miles to 12N70J. The 11E Trail begins at the end of 12N70J. The other trail, Trail 011 may be reached by traveling east on the Wentworth Springs Road, 10.4 miles from Georgetown. Take 12N71 (Bald Mountain Road) South to 12N72. Travel South on 12N72 to 12N38. Then take 12N38A to the beginning of the 011 Trail.The government estimate is between $25,000 and $100,000. There will be no pre-bid meeting or tour, but interested vendors are encouraged to visit the sites. The solicitation package will be available approximately March 11, 2004 with a response date of April 8, 2004 at close of business (4:30 pm).

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS