Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of The Interior was posted on October 22, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y--ROMO 327127 Bridge Preservation

Awarded
140P2024R0146Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
CP25014
Solicitation # CP25014
Solicitation CP25014 is a unit price contract issued by the Port of Lake Charles (Lake Charles Harbor & Terminal District) for the Industrial Park East Rail Extension and Trans-loading Yard project located in Calcasieu Parish, Louisiana. The scope of work requires the contractor to provide all labor, materials, equipment, and supplies necessary to complete the project according to best industry practices and contract specifications. Key deliverables include mobilization, clearing and grubbing of 10 acres, drainage excavation, structural fill embankment, lime treatment of 37,000 square yards, and the installation of 602 linear feet of barbed wire fencing and double swinging driveway gates. The contract will be awarded to the lowest qualified bidder who complies with all requirements. Bidders must submit proposals by November 19, 2026, using the Louisiana Uniform Public Work Bid Form, ensuring every requested item has a unit price. The successful bidder must provide performance and payment bonds from an approved or A-rated Louisiana domiciled insurance company. Project administration includes a bi-monthly schedule update requirement and a retainage policy of 10 percent for contracts up to 500,000 dollars and 5 percent for those exceeding that amount. Compliance with the Clean Air Act, Federal Water Pollution Control Act, and Equal Opportunity clauses is required, with specific attention to FEMA assistance for subcontracts exceeding 150,000 dollars. Inspection and acceptance are managed by the Department, utilizing DOTD standards for earthwork and the International Roughness Index for concrete pavement.
Port of Lake Charles

POSTED

about 4 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The ROMO 327127 Bridge Preservation contract, issued by the Department of the Interior's Office of the DSC Contracting Services Division, is a solicitation aimed at securing services related to the preservation of bridges. The contract is posted under solicitation number 140P2024R0146 and was made available on October 4, 2024, with a response deadline set for October 24, 2024, at 8:00 PM. It falls under the NAICS code 237990, which pertains to other heavy and civil engineering construction, indicating that the work involves specialized infrastructure preservation activities. The contract is managed out of Denver, Colorado, and is open for responses from qualified entities interested in providing bridge preservation services within the specified scope. The contracting process emphasizes the importance of timely responses and provides a designated point of contact, Shellie Murphy, whose contact details include an email and phone number for inquiries. The project’s details, including specific performance locations, are not explicitly listed, but the overarching goal is to support the maintenance and preservation of bridges, ensuring their safety and longevity. Interested parties can access further information and the opportunity details through the provided link on SAM.gov, which offers a comprehensive view of the contract requirements and submission procedures.

General Info

Romo 327127 Bridge Preservation project solicitation by National Park Service, deadline November 8, 2024.

Contract Value

$3,853,117.68

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

CO, USA

Set-Aside

NONE

Award Issued Date

Documents

18

140P2024R0146 Amendment 0001

PDF, High priority: read this first1 page · amendment
High

140P2024R0146 Project Experience Questionnaire

DOCX, High priority: read this first1 page · questionnaire
High

140P2024R0146 ROMO 327127 Bridge Preservation IFB

PDF, High priority: read this first74 pages · ifb
High

Amendment 0002 - Solicitation 140P2024R0146

PDF, High priority: read this first1 page · amendment
High

Amendment 002 - Additional Material Storage - 327127 ROMO Bridge Preservation

PDF, High priority: read this firstamendment
High

B07 Attach 2 Drawings

PDF, High priority: read this firstspecifications
High

B08 Attach 1 Specifications - Bridge Preservation PMIS 327127

PDF, High priority: read this first284 pages · specifications
High

B08 Attach 3 Price Schedule - ROMO Bridge Preservation

XLSX, High priority: read this first2 pages · pricing-schedule
High

B09_Amend_001 Questions and Answers

PDF, High priority: read this first1 page · q-and-a
High

B09 Amend 001 ROMO 121 60124 Aspenglen

PDF, High priority: read this firstamendment
High

CO20240013 Wage Determination - Highway Construction

PDF, High priority: read this firstwage-determination
High

CO20240014 Wage Determination for Larimer/Mesa/Weld Counties

PDF, High priority: read this firstwage-determination
High

Limitations on Subcontracting Report Template

XLSX, High priority: read this first1 page · sow
High

RG2808 Big Thompson River Bridge Rehab Plan Sheet

PDF, High priority: read this first20 pages · sow
High

ROMO 327127 Amendment 0002 Q&A

PDF, High priority: read this first2 pages · q-and-a
High

ROMO 327127 Pre-Proposal Virtual Site Visit Transcript

PDF, High priority: read this first19 pages · presolicitation
High

ROMO 327127 Pre-Proposal Virtual Site Visit Attendance Report

PDF, Low priority1 page · other
Low

Solicitation 140P204R0146 Past Performance Questionnaire

DOCX, Low priority3 pages · past-performance
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseAwarded
Posted

Sources Sought

Type Changed

Sources Sought → Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice title changed.

Deadline changed

Response deadline changed from Oct 24, 2024 to Nov 8, 2024.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Dsc Contracting Services Division
Contacts1 person available
OfficeDenver, CO, 80225, USA
Office AddressDenver, CO, 80225, USA

Full Description

Show more
ROMO 327127 Bridge Preservation

More opportunities from Department Of The Interior → Dsc Contracting Services Division

Same awarding agency

NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is a Small Business Set-Aside, Firm-Fixed-Price contract issued by the National Park Service for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. The project, identified as TIMU-335507, aims to repair and extend a seawall damaged by Hurricane Ian to protect critical cultural and ecological resources. The scope of work is divided into three primary CLINs: the installation of a new weatherable rigid vinyl sheet pile wall with tie rods in front of the existing wall, the extension of the wall eastward using structural FRP composite sheet piles, and comprehensive site restoration including excavation, backfilling, sodding, sea grass restoration, and the installation of limestone riprap. The estimated construction magnitude is between 1 million and 5 million dollars, with a mandatory performance period of 259 calendar days. Award will be determined using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, schedule, and management approach—are significantly more important than price. Contractors must adhere to strict environmental protection protocols to safeguard aquatic species, wetlands, and endangered wildlife, including manatees and sea turtles, in compliance with the Marine Mammal Protection Act and the Endangered Species Act. Additional requirements include adherence to the Davis-Bacon Act for prevailing wages, ADA compliance for public dock walkways, and the use of biodegradable or recyclable packaging. Proposals must be submitted electronically in two volumes by November 13, 2026, and include a bid bond and detailed past performance data.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 15 days
View Details
NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. A critical requirement is that the existing plant must remain in permitted operation until the new facility is accepted by the government, and the contractor must provide a 12-month operational support period. The contract is a firm-fixed-price acquisition with a magnitude exceeding 100 million dollars. The mandatory period of performance is 1095 calendar days, scheduled from February 1, 2027, to February 1, 2030. Award will be based on a multi-factor, best-value tradeoff process evaluating technical experience, technical approach, key personnel experience, and price. Required deliverables include a detailed commissioning plan covering startup sequencing, operator training, and regulatory coordination. The contractor must furnish performance and payment bonds and comply with union prevailing wage rates, Department of the Interior cybersecurity requirements, and ADA/ABA accessibility standards.
Sewage Treatment Facilities

POSTED

1 day ago

DEADLINE

in 20 days
View Details
NAICS: 237310
Federal
Z--BRCA 310427 Southbound Shuttle Stop
Solicitation # 140P2026R0065
Solicitation 140P2026R0065 is a small business set-aside for the construction of the Southbound Shuttle Stop at Bryce Canyon National Park, Utah. Managed by the National Park Service Denver Service Center, this firm-fixed-price contract has an estimated value between $1,000,000 and $5,000,000. The scope of work includes shuttle stop improvements, the addition of lanes, culvert installation, trail realignment, retaining wall construction, ADA ramp and sidewalk installation, and the placement of shelters and MUTCD-compliant signage. Due to the project's location, the contractor must implement protective measures for the adjacent UT Prairie Dog Habitat and ensure all equipment is clean and free of contaminants. The performance period is scheduled from May 1, 2027, to September 28, 2027, with a total duration of 150 calendar days following the notice to proceed. Award will be determined using the Best Value Continuum Tradeoff Process, evaluating technical approach, schedule, project experience, key personnel, and past performance alongside proposed pricing. Requirements include the submission of bid, performance, and payment bonds, compliance with Davis-Bacon Act wage determinations, and adherence to OSHA safety standards. Proposals must be submitted electronically in separate technical and price volumes, with a final response deadline of November 3, 2026.
Highway, Street, and Bridge Construction

POSTED

13 days ago

DEADLINE

in 5 days
View Details
NAICS: 237110
Federal
Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment
Solicitation # 140P2026R0091
Solicitation 140P2026R0091 is a firm-fixed-price construction contract issued by the National Park Service Denver Service Center to rehabilitate the Rainshed and Water Treatment System at Hawaii Volcanoes National Park. The project scope includes the rehabilitation of the rainwater catchment and water treatment systems, the replacement of Building 43 with a new metal building, and the replacement of Building 241 with a new open-air and CMU structure. Additional optional requirements include replacing the perimeter fence, repairing the water treatment system, and replacing ground catchment pavement. The project has a mandatory performance period of 610 calendar days, with primary CLINs scheduled from November 1, 2026, to July 3, 2028. The government will award the contract using a best value tradeoff process, evaluating non-price factors such as project experience, technical approach, management approach, and construction schedule against proposed pricing. Bidders must comply with the Davis-Bacon Act for prevailing wages and adhere to Buy American Act and Build America Buy America standards. Technical requirements include ADA compliance, the implementation of a Quality Control Plan, and adherence to specific environmental standards regarding ozone-depleting substances and recycled content. Due to the site's nature, the project involves Section 106 mitigation for historic buildings and requires careful construction phasing to ensure water production is not compromised. Proposals must be submitted electronically, and the awardee will be required to provide performance and payment bonds within 10 days of award.
Water and Sewer Line and Related Structures Construction

POSTED

16 days ago

DEADLINE

in 8 days
View Details
NAICS: 237310
Federal
Z--YELL 338223 - Bridge Preservation
Solicitation # 140P2026R0073
Solicitation 140P2026R0073 is a Small Business Set-Aside for bridge preservation services at Yellowstone National Park, Wyoming, managed by the National Park Service Denver Service Center. The project involves the rehabilitation of three specific bridges: Lava Creek, Thumb Creek, and an Unnamed Creek bridge. The scope of work includes concrete spall and structural repairs, crack sealing, stone masonry repointing, bridge expansion joint maintenance, painting of railings, and the application of epoxy overlays via hydro-demolition. Additional requirements include erosion repair, pavement markings, and strict traffic control. The anticipated period of performance is 155 calendar days from the Notice to Proceed, with an estimated contract value between $1 million and $5 million. The contract will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, project experience, key personnel, and past performance—are significantly more important than price. Required key personnel include a Site Superintendent with at least five years of experience and OSHA 30 certification, and a Traffic Control Supervisor with three years of experience meeting MUTCD standards. Contractors must adhere to strict work hour restrictions from 7 AM to 7 PM and comply with environmental protections for wildlife and cultural resources. Performance and payment bonds are required at 100 percent of the contract price, and the project is subject to Davis-Bacon Act labor standards. Proposals are due by October 30, 2026.
Highway, Street, and Bridge Construction

POSTED

16 days ago

DEADLINE

in 1 day
View Details
NAICS: 237110
Federal
Y--GRTE 237343 - Rehab 4 Lazy F Ranch
Solicitation # 140P2026R0098
Solicitation 140P2026R0098 is a Total Small Business Set-Aside for the rehabilitation of the historic 4 Lazy F Ranch in Grand Teton National Park, Wyoming, to provide employee housing. The project scope includes the comprehensive rehabilitation of one lodge, eight cabins, one garage, two outbuildings, and a water well structure. Key technical requirements involve structural repairs, historic preservation, and the installation of new potable water and wastewater systems, including a sanitary sewer collection system and lift station. The project is estimated to exceed 10 million dollars and has a mandatory negotiable performance period of 170 calendar days, with work beginning within 10 days of award. The procurement will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—technical approach, project experience, schedule, and past performance—are collectively equal in importance to price. Contractors must adhere to strict environmental and safety standards, including the management of lead-based paint and asbestos, compliance with the Davis-Bacon Act, and mitigation of impacts on bald eagle nesting and roosting bats. Proposals must be submitted electronically by November 20, 2026, and must include a detailed technical approach and a phasing plan to minimize park operational disruptions. Required insurance includes general liability of 500,000 dollars and employer liability of 100,000 dollars.
Water and Sewer Line and Related Structures Construction

POSTED

24 days ago

DEADLINE

in 22 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS