Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, June 24 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of The Interior was posted on May 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y--Sources Sought YOSE Water & Sewer piping

Closed
140P2026R0083Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
SLED
Foster Township - 2026 Road Program (0326-609021.03)Foster Township is soliciting sealed bids for the 2026 Road Program Project, which includes a bituminous overlay and full-depth reconstruction of various roadways and a bituminous overlay of a walking path around a baseball field within Foster Township, Schuylkill County, Pennsylvania. All bids must be submitted electronically via the PennBid platform by July 1, 2026, at 11:00 A.M., with public announcement of bid results the same day during the Township Supervisors Regular Meeting. The entire project will be awarded to a single contractor, who must provide a certified bid bond or equivalent for 10% of the total bid amount and, upon award, furnish performance and payment bonds each equal to 100% of the contract price. The project is subject to Pennsylvania prevailing wage laws and compliance with the Public Works Employment Verification Act, requiring submission of a verification form with all bids. The contract stipulates adherence to specific erosion and sediment controls, including installation and daily inspection of filter bags meeting ASTM standards to manage sediment-laden runoff during construction. Pump discharge rates are capped at 750 gallons per minute or half the pump’s rated capacity, with strict placement criteria for filter bags. While the solicitation adopts local municipal procurement practices and does not utilize formal federal FAR clauses, it incorporates standard bonding, labor compliance, and public works requirements. The award will be made to the lowest responsive and responsible bidder based on sealed bids. No designated key personnel or special clause alternates are included, and bids must remain valid for 60 days post-opening. Complete project details, specifications, and bid submission instructions are provided at no cost on the PennBid platform.
Schuylkill County

POSTED

about 20 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The project involves a comprehensive upgrade and extension of the water and sewer systems near the Big Oak Flat Entrance and Hodgdon Meadow Campground in Yosemite National Park. It includes replacing the existing water source, supply, and distribution infrastructure with approximately 1,200 linear feet of raw water line, 7,900 linear feet of water supply line, and 8,100 linear feet of water distribution piping, along with related appurtenances servicing the Big Oak Flat Welcome Center, Hodgdon Meadow Campground, and staff housing. Key components also encompass demolition of the current 100,000-gallon welded steel water storage tank and construction of a larger 210,000-gallon tank with an access road, installation of a new water source well and pump, a new water treatment and control building, nearly 3,200 linear feet of electrical distribution, and 3,800 linear feet of communications lines. The existing asbestos cement water main will be abandoned in place. Additionally, the contract addresses improvements to the wastewater system by connecting the Big Oak Flat sanitary sewer to the Hodgdon Meadow Campground sewage system. This includes constructing approximately 3,500 linear feet of 6-inch sanitary sewer line, 20 sewer manholes, and three service laterals to enhance sewage management capabilities. The solicitation for this project falls under NAICS code 237110 and is issued by the Department of the Interior’s DSC Contracting Services Division. The deadline for responses is June 1, 2026, and key coordination is through the designated point of contact at the National Park Service. The overall effort aims to modernize essential water and sewer infrastructure to improve reliability and service in this heavily visited park area.

General Info

Upgrade and expand Yosemite water, sewer systems; new pipelines, tank, treatment, and sewage connections.

Agency

Department Of The Interior → Dsc Contracting Services Division

NAICS

237110 - Water and Sewer Line and Related Structures Construction View NAICS

Place of Performance

CO

Set-Aside

NONE

Documents

(2)

Sources Sought Notice Survey Questionnaire Solicitation No.140P2026R0083

DOCXsources-sought

Sources Sought Notice Survey Questionnaire Solicitation No.140P2026R0083

DOCXsources-sought

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

special-notice

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Dsc Contracting Services Division
Contacts1 person available
OfficeDenver, CO, 80225, USA
Organization / Agency
Department Of The Interior → Dsc Contracting Services Division
Office AddressDenver, CO, 80225, USA

Full Description

Show more
Hodgdon Meadow Water Distribution System (PMIS 228661) Extend Hodgdon Meadow Campground Sewer (PMIS 196755)This project is located in Yosemite National Park, CA in the vicinity of the Big Oak Flat Entrance (Information) Station and Hodgdon Meadow Campground following along Tuolumne Grove Road and is to replace the existing water source, supply, and distribution system. The scope of the construction contract includes construction of 1,200 LF raw water line, 7,900 LF water supply, and 8,100 LF water distribution system and related appurtenances serving the Big Oak Flat Welcome Center, Hodgdon Meadow Campground, and staff housing areas; demolition of the existing 100,000-gallon welded steel water storage tank and construction of a new 210,000-gallon steel water storage tank and access road; construction of a new water source well and pump; construction of a new water treatment and control building; construction of 3,200 LF of electrical distribution and service; and construction of 3,800 LF of communications service. Existing asbestos cement water main will be abandoned in place.
This project is located in Yosemite National Park, CA in the vicinity of the Big Oak Flat Entrance (Information) Station and Hodgdon Meadow Campground following along Tuolumne Grove Road. The scope of the construction contract is for connection of the Big Oak Flat sanitary sewer to the Hodgdon Meadow Campground wastewater system and includes construction of approximately 3,500 LF of 6¿ sanitary sewer line, 20 sanitary sewer manholes, and 3 service laterals.