Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on October 21, 2005. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y -- TORTILLA CAMPGROUND REHABILITATION

Awarded
IFB-R3-WZ-4-44Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex located at 28 Bare Cove Park Drive. This fixed-price lump sum project has an estimated construction cost of $1,300,000. The scope of work includes site preparation such as the removal of trees, shrubs, and stumps, re-grading the site, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the contractor is responsible for a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor must coordinate with the Town and the demolition contractor, Pasquazzi Bros, Inc., and is responsible for maintaining construction fencing and erosion control throughout the project duration. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or paved athletic facilities. Bidders must submit their proposals electronically via the OpenGov portal by November 3, 2026, including a 5% bid security and a Statement of Qualifications with at least three similar public project references. Awarded contractors must provide a payment bond equal to 50% of the total project cost and adhere to Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code. The project includes a minimum one-year warranty for labor and a two-year warranty for materials. Final payment is contingent upon the submission of AIA affidavits for the payment of debts and release of liens.
Recreation

POSTED

about 5 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
Pre-Qualification For Construction Of Park, Recreation & Libraries Parks And Facilities For 2027
Solicitation # 13-202
Solicitation 13-202 is a pre-qualification process issued by the City of Roseville, California, for the construction of park, recreation, and library facilities scheduled for 2027. The objective is to identify qualified contractors with the capacity and experience to execute new park construction and rehabilitation projects. Interested parties must submit their pre-qualification packages via email to the City Clerk’s Office by 3:00 p.m. on November 23, 2026. Submissions are limited to 25 megabytes and must include a signed questionnaire, DIR registration for all contractors and subcontractors, and current workers' compensation certificates of insurance. To achieve pre-qualified status, applicants must meet essential qualifications, including a valid California Contractor's license and specific insurance limits of 1,000,000 dollars per occurrence and 2,000,000 dollars aggregate. Experience requirements mandate the completion of at least six new park construction projects for public agencies within the last three years, with a maximum of three rehabilitation projects allowed toward this total. Financial solvency is verified through third-party credit checks, where a score of 650 or less may lead to disqualification. Evaluation also considers compliance with California apprenticeship laws, Davis-Bacon prevailing wage requirements, and CAL OSHA safety standards.
City of Roseville, Parks, Recreation & Libraries Department (PRL)

POSTED

about 5 hours ago

DEADLINE

in 25 days

AI Contract Overview

Show more

The Tortilla Campground Rehabilitation project is a 100 percent small business set-aside contract managed by the Department of Agriculture's Western Zone. Located at the Tortilla Flat Campground on the Mesa Ranger District of the Tonto National Forest, the scope of work involves extensive infrastructure improvements. Key tasks include pulverizing, grading, compacting, and repaving roadways, as well as installing new water service lines, hose bibbs, and RV sewer access ports. Additionally, the project requires the installation of new picnic tables, campfire rings, decomposed granite, concrete curbing, and solar lighting systems for six toilet buildings. The government estimated the project value to be between 250,000 and 500,000 dollars. The solicitation process began in May 2004, with bids opening around June 9, 2004, and a response deadline of June 10, 2004. This award notice falls under NAICS code 237990 and was administered through the office located in Phoenix, Arizona.

General Info

Contract Value

$373,485

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

AZ

Set-Aside

NONE

Award Issued Date

Documents

3

specifications.rtf

RTF

tortillapdf.pdf

PDF

tortilla.solicitation.doc

DOC

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Western Zone
Contacts1 person available
OfficePHOENIX, AZ, 85006, USA
Office AddressPHOENIX, AZ, 85006, USA
Contacts
Elbert H. HuntProcurement Assistant

Full Description

Show more
THIS IS A 100% SMALL BUSINESS SET ASIDE/CONCERN The Tortilla Rehabilitation project consist of pulverizing, grading, compacting and repaving existing paved roadways. Removal of obstructions, removal of existing hose bibbs, and installation of new water service lines and hose bibbs. Removal of existing RV sewer access ports, and installation of new RV sewer access ports. Removal and re-installation of existing campfire rings and, installation of new campfire rings, Installation of new picnic tables, installation of decomposed granite, installation of solar lighting systems for six existing toilet buildings, and installation of concrete curbing. The Solicitation will issue on or about May 10, 2004 with Bids opening on or about June 9, 2004. The project is located at the Tortilla Flat Campground on the Mesa Ranger District of the Tonto National Forest, approximatley 10 miles from the Forest Boundary on SR 88, a Per-Bid Meeting will be scheduled on or about May 26, 2004. The Governments range is between $250,000.00 and $500,000.00.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS