This Solicitation opportunity from Department Of The Interior was posted on April 26, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y--WRST 248940 - Replace Deficient WTP/Systems.

Closed
140P2024R0034Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and transportation necessary to furnish, install, commission, and deliver a fully functional project. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete pipes and structures. Specialized services required for the project include traffic control, SWPPP, construction surveying, electrical work, welding, and preconstruction video. Norstar Plumbing and Engineering, Inc. is the prime contractor seeking certified and qualified DBE, MBE, SBE, and WBE subcontractors and suppliers to support these efforts. The solicitation is categorized under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications are available through the Inland Empire Utilities Agency bidding website. Primary points of contact for this opportunity are Nathan Plummer and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 1 hour ago

DEADLINE

in 5 days
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction effort for the City of Belmont, North Carolina, with a project estimate of 16,690,000 dollars. The scope of work involves the installation of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key station improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also requires the installation of new gravity sewers, manholes, and related site work including excavation, paving, and erosion control. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on qualifications, financial ability, and MWBE compliance. Bidders must submit a signed EJCDC C-410 Bid Form, a bid bond, and evidence of authority to sign. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and insurance with an A.M. Best rating of A-VII or better. Performance begins upon the issuance of a Notice to Proceed, and payments are processed monthly via applications for payment submitted to the Engineer, becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 17 days
NAICS: 237110
New
Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Contract K-27-2470-DBB-3-C
Solicitation # K-27-2470-DBB-3-C
Flatiron Dragados Constructors, Inc. is soliciting bids for the Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Project No. K-27-2470-DBB-3-C, for the City of San Diego. This CASRF and EPA funded project is located in California and seeks quotes from subcontractors and suppliers for a wide range of services, including infrastructure and utilities such as electrical work, pipe supply, and water truck services; material supply for aggregate, geotextile, and ready mix concrete; and professional services including surveying, QC testing, and biological services. The solicitation is set aside for SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. Bids must be submitted via email or fax by October 28, 2026, at 2:00 PM and must remain valid for 120 days. All subcontractors are required to hold a valid California contractor license and be registered with the California Department of Industrial Relations per Public Contract Code Section I725.5. The project is subject to a Project Labor Agreement. Additionally, Flatiron Dragados reserves the right to require payment and performance bonds equal to 100 percent of the contract value, with actual bond premium costs reimbursed up to a maximum of 3 percent. Primary contact for this solicitation is Veronica Garcia.
Flatiron Dragados Constructors, Inc.

POSTED

about 1 hour ago

DEADLINE

in 4 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing, restoration, and the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation and operation of a temporary 11 MGD pumped bypass. Additionally, the project entails the rehabilitation of reactor mixers and aerators, modifications to sluice and slide gates, rerouting of sump pump discharge lines, excavation, trench work, and surveying. Electrical and instrumentation work includes the installation of new systems, improvements to existing instrumentation, and the rehabilitation and replacement of motor control center components. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of bid for reimbursement. Quotes for services and supplies, including lead abatement, metals fabrication, and painting and coatings, are due by November 17, 2026, with the final bid date set for November 18, 2026.
Garney Pacific, Inc.

POSTED

about 1 hour ago

DEADLINE

in 25 days

General Info

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

CO

Set-Aside

8A

Documents

30

140P2024R0034 Replace Deficient VC/HQ Water Treatment System

PDF, High priority: read this first54 pages · rfp
High

B08 Attachment 9 - Detailed Contract Price Schedule

XLSX, High priority: read this first2 pages · specifications
High

B09_240424-HQ-ADEC Revisions Amd6

PDF, High priority: read this firstamendment
High

B09 Mechanical Drawings Bidder Questions Amd5

PDF, High priority: read this firstspecifications
High

B09 Rev1 Drawing Shts C3_1 C3_2 - Elias National Park & Preserve

PDF, High priority: read this firstspecifications
High

B09 Updated Spec Section 46 20 10 Addendum April 9 2024 Amd3

PDF, High priority: read this firstamendment
High

CBGCW1KS Installation Instructions Rev C

PDF, High priority: read this first2 pages · specifications
High

Electrical Site and Power Plans - Glennallen Water Treatment System

PDF, High priority: read this first3 pages · specifications
High

Final Drawings - Replace Deficient VC/HQ Water Treatment System WRST

PDF, High priority: read this firstspecifications
High

RFP 140P2024R0034 - WRST 248940 Q&A Tracker

XLSX, High priority: read this first12 pages · q-and-a
High

RFP 140P2024R0034 - WRST 248940 Question and Response Tracker

XLSX, High priority: read this first12 pages · q-and-a
High

RFP 140P2024R0034 - WRST 248940 Question and Response Tracker

XLSX, High priority: read this first12 pages · q-and-a
High

Section 23 52 39 - Fire Tube Boilers (Amd 5)

PDF, High priority: read this first5 pages · specifications
High

Section 46 20 10 - Treatment Equipment (Amd 2)

PDF, High priority: read this firstspecifications
High

Solicitation 140P2024R0034 Amd 1 - Replace Deficient VC/H Q Water Treatment System

PDF, High priority: read this firstamendment
High

Solicitation 140P2024R0034 Amendment 0001

PDF, High priority: read this firstamendment
High

Solicitation 140P2024R0034 Amendment 0002

PDF, High priority: read this first2 pages · amendment
High

Solicitation 140P2024R0034 Amendment 0003

PDF, High priority: read this firstamendment
High

Solicitation 140P2024R0034 Amendment 0004

PDF, High priority: read this firstamendment
High

Solicitation 140P2024R0034 Amendment 0005

PDF, High priority: read this firstamendment
High

Solicitation 140P2024R0034 Amendment 0006

PDF, High priority: read this firstamendment
High

Solicitation 140P2024R0034 - Project Experience Questionnaire

DOCX, High priority: read this first1 page · past-performance
High

Solicitation 140P2024R0034 - Replace Deficient Visitor Center/Headquarters Water Treatment System

PDF, High priority: read this firstrfp
High

Wage Determination AK20240001 (Feb 2024)

PDF, High priority: read this first14 pages · wage-determination
High

Wrangell-St. Elias National Park & Preserve - Replace Deficient VC/HQ Water Treatment System - Site and Utility Layout (C3.0, C3.1)

PDF, High priority: read this first2 pages · specifications
High

WRST 248940 Final Construction Specifications - Wrangell St Elias National Park & Preserve

PDF, High priority: read this first741 pages · specifications
High

Attachment 5 - Limit On Subcontracting Worksheet (Solicitation 140P2024R0043)

XLSX, Low priority1 page · supporting-document
Low

Attachment 6 - General References (Solicitation 140P2024R0034)

DOC, Low priority2 pages · past-performance
Low

Construction Contract Administration Provision

PDF, Low priority1 page · specifications
Low

Solicitation 140P2024R0034 - Past Performance Questionnaire

DOCX, Low priority3 pages · past-performance
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

6 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice title changed.

Deadline changed

Response deadline changed from Apr 16, 2024 to Apr 23, 2024.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Apr 23, 2024 to Apr 30, 2024.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Dsc Contracting Services Division
Contacts1 person available
OfficeDenver, CO, 80225, USA
Office AddressDenver, CO, 80225, USA
Contacts

Full Description

Show more
WRST 248940 - Replace Deficient Visitor Center / Headquarters Water Treatment System

More opportunities from Department Of The Interior → Dsc Contracting Services Division

Same awarding agency

NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is a Small Business Set-Aside, Firm-Fixed-Price contract issued by the National Park Service for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. The project, with an estimated construction magnitude between $1 million and $5 million, involves three primary components: the selective demolition and installation of a new weatherable rigid vinyl sheet pile wall with tie rods and a deadman wall, the eastward extension of the wall using structural FRP composite sheet piles, and comprehensive site restoration including excavation, backfilling, sodding, limestone riprap installation, and spartina sea grass restoration. The mandatory performance period is 259 calendar days, with work required to begin within 10 days of award. The government will utilize the Best Value Continuum Tradeoff Process for award, where non-price factors—specifically technical approach, schedule, and management approach—are significantly more important than price. Contractors must adhere to strict environmental protection protocols to protect marine mammals and endangered species, and comply with the Davis-Bacon Act and various ASTM standards for recycling and packaging. Key requirements include the submission of a Contractor Quality Control plan, the assignment of specific key personnel, and the provision of performance and payment bonds. Invoicing must be processed electronically through the U.S. Department of the Treasury's Invoice Processing Platform following a draft review by the Contracting Officer's Representative.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 21 days
View Details
NAICS: 237310
Federal
Z--BRCA 310427 Southbound Shuttle Stop
Solicitation # 140P2026R0065
Solicitation 140P2026R0065 is a small business set-aside for the construction of the Southbound Shuttle Stop at Bryce Canyon National Park, Utah. Managed by the National Park Service Denver Service Center, this firm-fixed-price contract has an estimated value between $1,000,000 and $5,000,000. The scope of work includes shuttle stop improvements, the addition of lanes, culvert installation, trail realignment, retaining wall construction, ADA ramp and sidewalk installation, and the placement of shelters and MUTCD-compliant signage. Due to the project's location, the contractor must implement protective measures for the adjacent UT Prairie Dog Habitat and ensure all equipment is clean and free of contaminants. The performance period is scheduled from May 1, 2027, to September 28, 2027, with a total duration of 150 calendar days following the notice to proceed. Award will be determined using the Best Value Continuum Tradeoff Process, evaluating technical approach, schedule, project experience, key personnel, and past performance alongside proposed pricing. Requirements include the submission of bid, performance, and payment bonds, compliance with Davis-Bacon Act wage determinations, and adherence to OSHA safety standards. Proposals must be submitted electronically in separate technical and price volumes, with a final response deadline of November 3, 2026.
Highway, Street, and Bridge Construction

POSTED

7 days ago

DEADLINE

in 11 days
View Details
NAICS: 221320
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. The project is estimated to exceed 100 million dollars, with a period of performance from February 1, 2027, to February 1, 2030, and a revised assumed Notice to Proceed date of April 1, 2027. The government will utilize a multi-factor, best-value tradeoff process for award, evaluating technical experience, technical approach, key personnel experience, and price. Key requirements include the provision of performance and payment bonds, adherence to union prevailing wage rates, and a 12-month operational support period following construction. Technical specifications emphasize strict cybersecurity hygiene for SCADA/MES equipment, full government rights to supplied software and source code, and compliance with ADA standards. Proposals must be submitted electronically in separate volumes, with specific evaluations focusing on the contractor's ability to manage complex wastewater plant commissioning and regulatory approvals.
Sewage Treatment Facilities

POSTED

7 days ago

DEADLINE

in 26 days
View Details
NAICS: 237110
Federal
Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment
Solicitation # 140P2026R0091
Solicitation 140P2026R0091 is a firm-fixed-price construction contract issued by the National Park Service Denver Service Center to rehabilitate the Rainshed and Water Treatment System at Hawaii Volcanoes National Park. The project scope includes the rehabilitation of the rainwater catchment and water treatment systems, the replacement of Building 43 with a new metal building, and the replacement of Building 241 with a new open-air and CMU structure. Additional optional requirements include replacing the perimeter fence, repairing the water treatment system, and replacing ground catchment pavement. The project has a mandatory performance period of 610 calendar days, with primary CLINs scheduled from November 1, 2026, to July 3, 2028. The government will award the contract using a best value tradeoff process, evaluating non-price factors such as project experience, technical approach, management approach, and construction schedule against proposed pricing. Bidders must comply with the Davis-Bacon Act for prevailing wages and adhere to Buy American Act and Build America Buy America standards. Technical requirements include ADA compliance, the implementation of a Quality Control Plan, and adherence to specific environmental standards regarding ozone-depleting substances and recycled content. Due to the site's nature, the project involves Section 106 mitigation for historic buildings and requires careful construction phasing to ensure water production is not compromised. Proposals must be submitted electronically, and the awardee will be required to provide performance and payment bonds within 10 days of award.
Water and Sewer Line and Related Structures Construction

POSTED

10 days ago

DEADLINE

in 14 days
View Details
NAICS: 237310
Federal
Z--YELL 338223 - Bridge Preservation
Solicitation # 140P2026R0073
Solicitation 140P2026R0073 is a Small Business Set-Aside for bridge preservation services at Yellowstone National Park, Wyoming, managed by the National Park Service Denver Service Center. The project involves the rehabilitation of three specific bridges: Lava Creek, Thumb Creek, and an Unnamed Creek bridge. The scope of work includes concrete spall and structural repairs, crack sealing, stone masonry repointing, bridge expansion joint maintenance, painting of railings, and the application of epoxy overlays via hydro-demolition. Additional requirements include erosion repair, pavement markings, and strict traffic control. The anticipated period of performance is 155 calendar days from the Notice to Proceed, with an estimated contract value between $1 million and $5 million. The contract will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, project experience, key personnel, and past performance—are significantly more important than price. Required key personnel include a Site Superintendent with at least five years of experience and OSHA 30 certification, and a Traffic Control Supervisor with three years of experience meeting MUTCD standards. Contractors must adhere to strict work hour restrictions from 7 AM to 7 PM and comply with environmental protections for wildlife and cultural resources. Performance and payment bonds are required at 100 percent of the contract price, and the project is subject to Davis-Bacon Act labor standards. Proposals are due by October 30, 2026.
Highway, Street, and Bridge Construction

POSTED

10 days ago

DEADLINE

in 7 days
View Details
NAICS: 237110
Federal
Y--GRTE 237343 - Rehab 4 Lazy F Ranch
Solicitation # 140P2026R0098
Solicitation 140P2026R0098 is a Total Small Business Set-Aside for the rehabilitation of the historic 4 Lazy F Ranch in Grand Teton National Park, Wyoming, to provide employee housing. The project scope includes the comprehensive rehabilitation of one lodge, eight cabins, one garage, two outbuildings, and a water well structure. Key technical requirements involve structural repairs, historic preservation, and the installation of new potable water and wastewater systems, including a sanitary sewer collection system and lift station. The project is estimated to exceed 10 million dollars and has a mandatory negotiable performance period of 170 calendar days, with work beginning within 10 days of award. The procurement will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—technical approach, project experience, schedule, and past performance—are collectively equal in importance to price. Contractors must adhere to strict environmental and safety standards, including the management of lead-based paint and asbestos, compliance with the Davis-Bacon Act, and mitigation of impacts on bald eagle nesting and roosting bats. Proposals must be submitted electronically by November 20, 2026, and must include a detailed technical approach and a phasing plan to minimize park operational disruptions. Required insurance includes general liability of 500,000 dollars and employer liability of 100,000 dollars.
Water and Sewer Line and Related Structures Construction

POSTED

18 days ago

DEADLINE

in 28 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS