Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Y1DA--652-22-704 WIFI NextGen Upgrades

Awarded
36C24626Q0469Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract pertains to the WIFI NextGen Upgrades project under solicitation number 36C24626Q0469, issued by the Department of Veterans Affairs, Network Contracting Office 6, with performance centered at Hampton, Virginia, specifically at the Richmond VAMC and associated trailers, excluding Fort Harrison. The work involves installing 39 designated WiFi access point sites with compatible conduit, armored CAT6E cabling, and proper penetrations and terminations using RJ-45 connectors only, adhering to strict VA standards and requiring written approval from the Contracting Officer for deviations such as surface-mounted conduit or alternative pathways. All materials must be delivered in original manufacturer packaging with proper labeling, unused materials inventoried and returned to the VA, and installations subject to ICRA protocols in patient areas with variable containment levels depending on the zone. The contract is a Firm-Fixed-Price RFQ under FAR Part 13, with no bid form but clear exclusion requirements for quotes, and all submittals must follow specified electronic formats transmitted to designated VA email addresses. Compliance with the Davis-Bacon Act is mandatory, requiring certified payroll, and the contract maintains its SDVOSB set-aside with no waivers to subcontracting limitations or pay percentage restrictions. A stringent CQC system is mandated, overseen by a CQC System Manager with 20+ years of experience or equivalent credentials, who must be on-site constantly and may also act as Superintendent, but the Safety and Health Safety Officer (SHSO) must be a separate, qualified individual distinct from the Superintendent and Quality Control Manager. The Superintendent must be OSHA-30 certified, and all personnel must have verified employment eligibility under FAR 52.222-54 and obtain proper facility badges. The contract includes the 52.222-90 clause prohibiting racially discriminatory DEI activities in all aspects of program participation, employment, and resource allocation, with mandatory inclusion in subcontracts and reporting obligations for any noncompliance, including potential contract termination and debarment. All data cables must be installed within approved conduit or raceways, with armored cabling permitted only as an alternative if approved in writing by the COR, and in-ground installations require professional marking and identification tape. The project requires full adherence to ASTM standards for firestop inspections, VAAR 852.239-75 for ICT accessibility, and compliance with the Buy American Act for materials. Payment must be submitted electronically via VA’s E

General Info

VA project for conduit and CAT6 installation at 39 WiFi sites, following federal and safety compliance.

Contract Value

$232,275

NAICS

238210 - Electrical Contractors and Other Wiring Installation Contractors

Place of Performance

VA, USA

Set-Aside

SDVOSBC

Award Issued Date

Documents

15

36C24626Q0469 Amendment 0001

DOCX, High priority: read this firstamendment
High

36C24626Q0469 - Conduit and CAT 6 Cabling Installation

DOCX, High priority: read this first62 pages · rfq
High

652-22-701 WIFI Upgrades Combined Specifications

PDF, High priority: read this first61 pages · specifications
High

652-22-704 WIFI NextGen Upgrades AP Location Install SOW

PDF, High priority: read this first6 pages · sow
High

Amendment 0002 to Solicitation 36C24626Q0469

PDF, High priority: read this first1 page · amendment
High

Amendment 0003 to RFQ 36C24626Q0469 for VA Network Contracting Office 6

DOCX, High priority: read this first9 pages · amendment
High

AP Site 66 - 2nd Floor Location Map

PDF, High priority: read this firstspecifications
High

Attachment D - Wage Determination

PDF, High priority: read this first6 pages · wage-determination
High

RFQ 36C24626Q0469 WIFI NextGen Upgrades Pre-Solicitation

DOCX, High priority: read this first2 pages · presolicitation
High

VAAR 852.219-75 Certificate of Compliance for Limitations on Subcontracting

DOCX, High priority: read this first2 pages · certificate-of-compliance
High

VA ENT Redesign - AP Locations (Richmond)

PDF, High priority: read this firstspecifications
High

VA Notice of Limitations on Subcontracting Certificate of Compliance (JAN 2023)

DOCX, High priority: read this first2 pages · certification
High

WiFi Access Point Locations List for Upgrades Phase 2

PDF, High priority: read this first1 page · specifications
High

36C24626C0047 - WIFI NextGen Upgrades Award

DOCX, Low priority1 page · award
Low

AP Site Location Shifts Canteen Area 1st floor 05122026

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

3 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 246-NETWORK Contracting Office 6 (36C246)
Contacts1 person available
OfficeHAMPTON, VA, 23667, USA
Office AddressHAMPTON, VA, 23667, USA
Contacts
Donteana GibbsContract Specialist

Full Description

Show more
04/29/2026 Site Visit Attendance and Photos

52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS (APR 2026) (DEVIATION) (a) Definitions. As used in this clause Program participation means membership or participation in, or access or admission to: training, mentoring, or leadership development programs; educational opportunities; clubs; associations; or similar opportunities that are sponsored or established by the contractor or subcontractor. Racially discriminatory diversity, equity, and inclusion (DEI) activities means disparate treatment based on race or ethnicity in the recruitment, employment (e.g., hiring, promotions), contracting (e.g., vendor agreements), program participation, or allocation or deployment of an entity's resources. (b) In connection with the performance of work under this contract, the Contractor agrees as follows: (1) The Contractor will not engage in any racially discriminatory DEI activities; (2) The Contractor will furnish all information and reports, including providing access to books, records, and accounts, as required by the Contracting Officer, for purposes of ascertaining compliance with this clause; (3) In the event of the Contractor's or a subcontractor's noncompliance with this clause, this contract may be canceled, terminated, or suspended in whole or in part, and the Contractor or subcontractor may be declared ineligible for further Government contracts; (4) The Contractor will report any subcontractor's known or reasonably knowable conduct that may violate this clause to the Contracting Officer and take any appropriate remedial actions directed by the Contracting Officer; and (5) The Contractor will inform the Contracting Officer if a subcontractor sues the Contractor and the suit puts at issue, in any way, the validity of this clause. (6) The Contractor recognizes that compliance with the requirements of this clause are material to the Government's payment decisions for purposes of 31 U.S.C. 3729(b)(4). (c) The Contractor must include the substance of this clause, including this paragraph (c), in subcontracts at any tier, including those for commercial products and commercial services, except those where the place of delivery or performance is outside the United States. (End of clause) RFI s Please confirm that the roles of Superintendent and SSHO must be two different individuals. VA Response: As per 01 35 26 1.9 C of the specifications, the SSHO has [to] be a separate qualified individual from the Prime Contractor s Superintendent and/or Quality Control Manager with duties only as the SSHO.
Is this project an RFP or an IFB? VA Response: Neither. This is a Request for Quote (RFQ) under FAR Part 13.
Is Submittal Exchange a requirement for this project? VA Response: Submittals are to be submitted in accordance with section 01 33 24 1.6 SUBMITTAL FORMAT AND TRANSMISSION of the specifications. Submit electronic submittal documents to the COR and cc both the Contracting Officer and Contract Specialist. Email addresses will be provided during the kick-off meeting.
Page 5 of the Solicitation states Exclusions must be clearly stated on the quote . Isn t it against FAR to put exclusions on a bid form? Please confirm if exclusions are permitted and how evaluations between quotes can be performed if some firms provide different exclusions. VA Response: This is a Request for Quote (RFQ) under FAR Part 13, not an IFB. There is no bid form.
In areas that conduit cannot be placed behind the wall, is surface mounted conduit acceptable? VA Response: Surface mounted hardware is not the VA standard but may be approved (such as the mall area AP sites) in writing only by the COR when this occurs on a case by case basis.
Are the CAT6 cables to be terminated using CAST6 or RJ-45 s? VA Response: RJ-45 only.
Where there are hard ceilings, is an outlet box required where the AP device will be installed? VA Response: No the AP site brackets mount to the existing ceilings or walls, cat6 cables are to be punched through (3-4 inches exposed for connection) and penetration cleanly sealed to prevent space contamination.
Is the VA providing and installing the actual AP devices? VA Response: Connection to network and AP install is to be accomplished after this AP Site prep project is completed, the VA will handle who accomplishes this.
In the Scope of Work under 507E, 516, and 517 trailers, it states to install watertight ARMORED conduit . Do these locations require armored CAT6 cabling? VA Response: IAW scope, the conduit is intended to have resistance to water and impact, the cabling can be armored as listed in materials to be provided as required.
The SOW shows to install conduit and cable for 39 WiFi locations, however, the WiFi upgrades Phase 2 sheet shows 29 locations in B500, 1 in B507, 13 in the trailers and 1 in Southpoint, which totals 44. Please advise as to which is correct. VA Response: Only the 39 listed locations in the SOW are correct.
Is AP17 at Southpoint part of this install? VA Response: No, Only the 39 listed locations in the SOW are correct.
Where there are multiple AP locations in close proximity, are we allowed to run a larger conduit as the trunk and then run ¾ conduit to the actual locations to save space? VA Response: Pathways are to be approved on a case by case basis if other than listed, typically multiple cat 6 cables can be pulled in a single conduit, in a tray or larger conduit.
Will ICRA be required and if so, to what extent? VA Response: An ICRA is always required for work in patient areas that may cause dust/penetrations as this is a hospital the level of ICRA may vary from 1-4 dependent on location and services impacted.
The Solicitation mentions Fort Harrison. Please confirm Fort Harrison is not a part of this project. VA Response: It is not, Only the 39 listed locations in the SOW are correct.
The Solicitation lists the project number being both 652-22-701 and 652-22-704. So that the quote is correct, which project number should we use? VA Response: 652-22-701.
How can AP sites in store area (34, 65, 66, 68) be connected to the closet in their check out area? VA Response: Surface mounted white cable molds to match existing and approved through submittal process may be used in this instance due to no interstitial space for pathway.
What do we do with unused conduit, cabling that is on the materials list? VA Response: Once completed, all unused materials are to be inventoried and turned over to the VA.
Do all of the materials on the SOW required list have to be delivered and inventoried all at once before construction? VA Response: Not necessarily, it is up to the contractor but expected receipt should match billing line items, or at least by percentages received.
Which Cat 6 cabling is preferred for installation at the VA? VA Response: Cat 6E.
Second floor AP 66 appears to be already completed, what is the expected location for this AP if it already completed or will it descoped? VA Response: Second floor AP 66 is to be located on the Hard ceiling portion of the construction area in 2A as shown in provided clarification pdf drawings with these RFI s.
Are all AP sites in building 500 hard ceiling installations? VA Response: No, but a majority of them are.
For in ground installation are there any extra services required to complete? VA Response: Yes, professional marking servies required (Such as Accumark) before any digging is permitted, and Identification tape must be used for all in ground installations on the VA campus.
How exact are the stickers in relation to final placement of AP sites? VA Response: Stickers considered accurate but may be adjusted due to conditions- any change to the placement from where they are indicated will be approved by COR in writing.
Superintendent Requirement- Please confirm whether the project Superintendent is required to be a direct employee of the Prime Contractor, or if a qualified subcontractor employee may fulfill this role. VA Response: Subcontractor employee may fulfill this role. The Contractor shall furnish in writing the name and contact information of the Project Superintendent who has authority to act on behalf of the Contractor.
Combined Roles (Superintendent / SSHO / QCM)- Please confirm if one individual may serve in multiple roles (Superintendent, SSHO, and/or QCM), provided all qualification and certification requirements are met. VA Response: As per 01 35 26 1.9 C of the specifications, the SSHO has [to] be a separate qualified individual from the Prime Contractor s Superintendent and/or Quality Control Manager with duties only as the SSHO. As per 01 45 00 2.4 C of the specifications, [the] CQC System Manager but may also have duties as project superintendent in addition to quality control.
Competent Person Designation- Can the Superintendent also serve as the OSHA Competent Person for this project if properly qualified? VA Response: The Contractor s Superintendent shall be OSHA-30 certified.
Badging and Access- Are there any citizenship or badging requirements for workers accessing the facility? U.S. citizenship or lawful permanent residency? VA Response: Contractors are required to verify employment eligibility of all employees assigned to the contract in accordance with FAR 52.222-54 Employment Eligibility Verification, incorporated by reference on page 25. Employees will also require badges in accordance with the facility s security requirements.
Refine Scope- Are you removing the three Aps for Ft. Harrison from this bid as mentioned on the walkthrough? VA Response: Only the 39 listed locations in the SOW are correct.
CAT 6/Conduit- Do we need to run the category 6 cable in conduit in the lower level (basement) or can it be run in the existing cable tray? VA Response: A lot of cables seem to be in cable trays already. Cable tray usage can approved in writing on a case by case basis, though this does alleviate the requirement to provide the conduit as listed in the contract.
AP45- Do we need to put the cable for AP45 on Richmond Building 500 - Floor 1 Section D HD/LBS in conduit? VA Response: The security camera looks to be free-ran already. This is typically not an issue as existing conduit may be used on a case by case basis but must be approved by COR.
Floor Plans- Will you be updating the plans for the change in placement for AP 66, 68, and 35 on the Richmond Building 500 - Floor 1 Section C HD/LBS diagram since those will be moved? VA Response: A new PDF drawing will be provided showing the updated locations for these sites.
Data Drop- AP12 on Richmond Building 500 - Floor 1 Section C HD/LBS has an existing angle bracket and data drop. Will this data drop still be replaced and at the same location as the existing data drop? VA Response: This is typically approved but existing conduit and pathways can used with COR approval on a case by case basis.
Accessibility- Does interstitial space exist for floors 1,2,4, and 5 for conduit to be run in? VA Response: Yes, most spaces in building 500 have some sort of interstitial except in rare occurrences (such as the Lower level or Canteen areas).
Data Drops- Are there any data drop runs that do not require conduit? VA Response: All data cables must be in a conduit or approved tray/raceway, but armored cabling as listed in the materials to be provided in place of conduit may be approved in writing by the COR.
Conduit- Could sleeves be put in from IT rooms into the drop ceiling space and free run the data drop to the AP location in lieu of conduit? VA Response: No, all data cables must be in an approved conduit or tray/raceway, unless armored cabling is approved for use.
ICRA Requirements- Do all areas require ICRA standards and HEPA filtration units? If no, which areas require it? If yes, can we utilize the units that the hospital already has on-site? VA Response: Typically the sites should not require HEPA units but in specific cases such as the OR it is a possible requirement that may include a filtered vacuum for drilling, if containment units are provided by contractor- ICRA requirements are dependent on the areas that they are installed, Contractor must provide HEPA units as required for ICRA compliance.
Armored CAT 6 Cable-The SOW calls for armored CAT6 cable to be used at the outside trailer locations (507E, 516, and 517) and installed in conduit. Is the conduit necessary if we utilize the armored CAT6 cable? VA Response: The scope of work calls for watertight armored conduit- acceptable materials that are within the Means and methods can approved through submittals if they meet contract and material (moisture and impact resistant) requirements.
Conduit Runs- There seems to be above ground conduits ran between the HAS Trailers T516 already. The SOW calls for digging and trenching the conduit runs at this location. Do the new conduits need to be run underground, or can they be placed above ground like the existing conduits are? VA Response: On ground conduit runs are not approved, the conduit runs need to be run underground below the frost layer (18 ) in accordance with the Scope of work. An excavation permit is required from Safety Department.
Digging and Trenching- There are conduits running between each trailer at Telehealth Trailers T517 underneath the wooden decking. Can the new conduits be run and attached to the underside of the decking as well, or do we follow the digging and trenching per the SOW? VA Response: The expected route is in ground but if material approved is specifically weather and impact resistant with a route and suspension under the deck between the trailers- this means and methods can be approved by the COR. Would the VA consider removing the SDVOSB set aside requirements for the solicitation (including the pay percentage restrictions)? VA Response: No, SDVOSB will remain the set-aside.
Alternatively, if the prime SDVOSB set aside is kept, would the VA consider removing the additional small business requirements for the sub consulting described in 4.2 52.219-14 LIMITATIONS ON SUBCONTRACTING on page 26 of the solicitation (including the pay percentage restrictions)? VA Response: SDVOSB set aside remains.
Lastly, would the VA remove the requirements for the Davis-Bacon Act and any other mentions of certified payroll? VA Response: Davis-Bacon Act remains in place; this is a construction related solicitation.
END OF AMENDMENT 36C24626Q0469 0003

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
26-140 Installation of Emergency Shut Off Switches
Solicitation # 26-140
Solicitation 26-140 is a subcontracting opportunity with Atterbury Job Corps Center and Adams & Associates for the installation of emergency shut-off switches on equipment in Edinburgh, Indiana. The scope of work focuses on addressing safety deficiencies for rotating equipment in the Facility Engineering Storage and Glazing/Welding/Heavy Mechanics shops. Requirements include the installation of mushroom-head push-button switches and 60A shunt-trip branch circuit panels in both areas, ensuring a manual reset is required following power failures. All work must comply with OSHA, EPA, and Indiana state and local codes, with a one-year guarantee on workmanship and manufacturer products. The contract will be awarded based on best value, with evaluation weighted toward price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must submit a single lump sum proposal on company letterhead, including a detailed cost breakdown, a timeline for completion, and proof of a valid Indiana Contractor's License. Mandatory requirements include attendance at the site pre-bid walk-through and the provision of a 90-day bid guarantee. Administrative requirements include Net 30 payment terms, compliance with Davis-Bacon Act wage rates, and the submission of SF 1413 and certified payroll records prior to final payment. This opportunity is set aside for various small business categories, including VOSB, SDVOSB, WOSB, and HUBZone certified firms.
Atterbury Job Corps. – Adams & Associates

POSTED

about 1 hour ago

DEADLINE

in 22 days
View Details
NAICS: 238210
New
26-138 Main grounding electrode conductor is not provided
Solicitation # 26-138
Solicitation 26-138 is a request for a licensed electrical contractor to inspect and correct grounding system deficiencies at the Atterbury Job Corps Center in Edinburgh, Indiana. The primary scope of work involves establishing an effective ground-fault current return path by connecting main grounding electrode conductors from incoming water pipes to service distribution panels. Specific requirements include installing a new #4AWG conductor from the water main to the 200A service panelboard in the Staff Lounge, providing two supplemental 5/8 inch by 8 foot grounding electrodes connected via #6AWG bare copper conductor, and ensuring all work conforms to NEC 2020, 250, as well as current EPA and OSHA regulations. The contract is a small business set-aside and will be awarded based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must submit a single lump sum proposal including a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, and certification of compliance with Davis Bacon Act wage rates. Mandatory requirements for submission include a valid Indiana Contractor's License, a completed W9, and attendance at the mandatory pre-bid site visit. The contractor must also provide proof of automobile liability and workers compensation insurance, naming Adams and Associates, Inc. as an additional insured. Payment terms are set at Net 30.
Atterbury Job Corps. – Adams & Associates

POSTED

about 1 hour ago

DEADLINE

in 22 days
View Details
NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency is soliciting proposals under RFP-VC-26-010 for professional transformer oil testing services to enhance the reliability, safety, and maintainability of its transformers. The scope of work is divided into three primary areas: conducting visual and infrared thermographic inspections on energized transformers to identify thermal anomalies, installing standardized external oil sampling devices for safer collection, and performing detailed oil testing analysis. Additionally, the selected contractor must evaluate existing nitrogen blanket systems to ensure positive pressure and provide on-site training for up to 20 agency staff members on inspection methods and defect identification. All work must adhere to strict industry standards, including NETA MTS, IEEE, NFPA 70E, and ASTM D923, with infrared inspections performed by ASNT Level 1 certified technicians or higher. The agency intends to make a single award to the most capable offeror based on their past performance, staffing plan, personnel availability, and cost-effectiveness. Qualified proposers must have completed at least two similar projects within the last five years, including at least one for a utility or industrial facility. Proposals must be submitted electronically via PlanetBids by December 23, 2026, and must include a detailed project approach, company profile, and required certifications such as a Non-Collusion Statement and Workers Compensation Certificate. The resulting contract will utilize fixed pricing with a not-to-exceed limit, and payments will be processed electronically via ACH within 30 days of invoice approval by the Project Manager.
Inland Empire Utilities Agency

POSTED

about 1 hour ago

DEADLINE

in about 2 months
View Details
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management and Training Corporation is soliciting bids for a fixed-price, single lump sum contract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The estimated value of the project ranges between $25,000 and $100,000. The selected electrical contractor will be responsible for locating and inventorying all emergency light fixtures, performing functional testing by simulating utility outages, conducting necessary repairs, and certifying the system's readiness. All work must comply with NFPA 101 (2024 Edition), NFPA 70, and OSHA safety regulations. Key deliverables include the application of durable tracking labels to fixtures, integration of maintenance requirements into the facility's Computerized Maintenance Management System, and the provision of certificates of disposal for hazardous materials. Bids are due by December 1, 2026, and must be submitted via email to Sandra Clore. A mandatory physical site visit and signature on the attendance roster are required prior to bid submission. For bids of $25,000 or more, a bid bond guarantee of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. The contract is set aside for small businesses and various SBA-certified categories. Award decisions will be based on overall best value. Compliance requirements include adherence to Construction Wage Rate Requirements, the Davis-Bacon Act, and FAR 52.222-4 regarding overtime compensation and safety standards. Final acceptance is contingent upon a substantial completion inspection and the submission of operation and maintenance manuals, warranties, and a one-year guarantee of workmanship.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 1 hour ago

DEADLINE

in about 1 month
View Details

More opportunities from Department Of Veterans Affairs → 246-NETWORK Contracting Office 6 (36C246)

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS