Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Yolo County TSS PTC Well Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Yolo County TSS PTC Well Installation project, managed by the California Department of Water Resources, involves the installation of six multi-completion groundwater monitoring wells in the Winters and Davis areas of Yolo County. This effort is part of the Statewide Groundwater Monitoring initiative and is designed to provide high-resolution measurements for subsidence monitoring. The project is overseen by a Professional Geologist or Geologist-In-Training from the Geology and Groundwater Investigations unit. Technical specifications for the wells include a 12 inch diameter with two 2 inch diameter well casings and a 4 foot by 4 foot completion footprint. The project has been granted a Notice of Exemption under Class 6, Section 15306, as the data collection and resource evaluation activities are expected to have no significant environmental impact. Ky Dupuis serves as the primary engineering geologist and lead agency contact for the installation.

General Info

Six groundwater monitoring wells installed in Yolo County for subsidence monitoring under state oversight.

Agency

California Water Resources, Department of

NAICS

N/A

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

NOE_YoloTSS_PTC_Wells Signed - Notice of Exemption for Yolo County TSS PTC Well Installation

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Water Resources, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Water Resources, Department of
Office AddressN/A
Contacts
Ky DupuisEngineering Geologist

Full Description

Show more
NCRO’s Geology and Groundwater Investigations’ (GGI) Professional Geologist (PG) or Geologist-In-Training (GIT) will oversee a contractor in the installation of six (6) multi-completion Groundwater Monitoring Wells (Figure 1). The wells will be 12” diameter with two 2” diameter well casings and a 4’x4’ completion footprint.

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS