This Solicitation opportunity from Colorado was posted on July 21, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
PDF, High priority: read this firstwage-determination
HighAI Summary for Building CO20240001 Multi-County Wage Determination Modification 11: This document is Modification 11 to the Building Construction Wage Determination CO20240001 for multiple counties in Colorado, published on 11/22/2024. It supersedes General Decision Number C020230001 and covers wage rates and fringe benefits for various construction trades including asbestos workers, bricklayers, carpenters, electricians, elevator mechanics, ironworkers, laborers, glaziers, cement masons, and plumbers. The document specifies applicable minimum wage rates under Executive Orders 14026 and 13658 for contracts subject to the Davis-Bacon Act. It includes detailed wage rates by county and trade, effective dates for modifications, and notes on contractor requirements and worker protections.
DOCX
DOCX, High priority: read this firstcontract-document
HighAI Summary for Colorado State Buildings Program Contractor's Design/Bid/Build Agreement SC-6.21: This document is the Contractor's Agreement for a Design/Bid/Build (D/B/B) project under the Colorado State Buildings Program, identified as State Form SC-6.21. It outlines the contractual relationship between the State of Colorado and the contractor, including project identification, contract and project numbers, and parties involved. The agreement includes articles on performance of work, contract provisions, time of completion, and other essential conditions. It references attachments such as general conditions, bonds, insurance certificates, wage determinations, and compliance policies. The document requires signatures from authorized representatives of the contractor, state agency, and state controller, establishing the contract's effective date and enforceability.
DOCX
DOCX, High priority: read this firstafb
HighAI Summary for GJRA25-1 Yuma Campus Re-Roof Advertisement for Bids: This document is an Advertisement for Bids (AFB) for the Yuma Campus Re-Roof project at Northeastern Junior College, Colorado. It outlines the project scope, including full roof replacement and associated repairs, with an estimated cost of $650,000. The document details mandatory requirements for bidders, including bonding, experience, and attendance at a pre-bid conference scheduled for 07/31/2025. It also specifies compliance with Colorado labor laws, Buy Clean Colorado Act, and prevailing wage requirements. The schedule includes bid submission due by 08/21/2025 and anticipated construction start on 09/01/2025. The document serves as the official solicitation notice for qualified contractors to submit bids for this public construction project.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for NJC Yuma Re-Roof Addendum 1: This document is Addendum No. 1 for the NJC Yuma Re-Roof project (Project No. 2024-74), issued on May 6, 2025. It provides updated instructions and modifications to the original contract documents, including architectural sheet revisions, expanded alternates for elective options, and changes to roof demolition and roof plan notes. Specific details on metal roof and wall panel siding modifications are included, as well as updates to roof details such as fascia painting and gutter replacement. The addendum also references a supplemental mechanical document for roof-mounted mechanical systems assessment to support scope determination for base bid and alternates.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for Request for Modification - Yuma Campus Reroof Insulation: This document is a Request for Modification dated December 20, 2024, regarding the Yuma Campus Reroof Insulation at Northeastern Junior College. It addresses a conflict with provisions of the 2021 International Building Code and related codes concerning roof insulation thickness and structural integration challenges. The Office of the State Architect has reviewed and approved the modification as conforming to the intent and purpose of the code.
DOCX
DOCX, High priority: read this firstinformation-for-bidders
HighAI Summary for SBP6.12 Info for Bidders R5-2024 Yuma Campus Reroof: This document titled 'SBP6.12 Info for Bidders R5-2024 Yuma Campus Reroof' provides detailed instructions and requirements for bidders on the Yuma Campus Reroof project (Project No. GRJA24-2). It includes bid submission instructions, bid form requirements, applicable laws and regulations including apprenticeship and prevailing wage laws, bid security requirements, tax exclusions, 'or equal' material provisions, addenda procedures, and the method of award based on lowest responsible bidder with additive and deductible alternates. The document emphasizes compliance with Colorado state laws and environmental product declarations. It is a critical guide for bidders to prepare responsive bids for this public construction project.
DOCX
DOCX, High priority: read this firstbid-alternates
HighAI Summary for SBP6.131 Bid Alternates Form for Yuma Campus Reroof: This document is the SBP6.131 Bid Alternates Form for the Yuma Campus Reroof project (Project No. GJRA24-2) under the Colorado Department of Higher Education/Northeastern Junior College. It outlines additive and deductive bid alternates that bidders can use to modify the base bid amount. The form includes spaces for up to ten additive alternates and ten deductive alternates, with instructions that additive and deductive alternates are mutually exclusive. The document requires the bidder's company name, signature, and date to validate the bid alternates submitted.
DOCX
DOCX, High priority: read this firstunit-pricing
HighAI Summary for SBP6.133 Unit Pricing Form for Yuma Campus Reroof: This document is the SBP6.133 Unit Pricing Form version R7-2022 for the Yuma Campus Reroof project (Project No. GJRA24-2) under the Colorado Department of Higher Education/Northeastern Junior College. It establishes unit prices to be used for contract sum adjustments when changes in work occur. The prices include all costs for materials, equipment, disposal, overhead, profit, and bond as per Change Order Proposal form SC-6.312. The form includes placeholders for unit descriptions, units of measure, and unit prices, and requires bidder company name, signature, and date.
DOCX
DOCX, High priority: read this firstbid-form
HighAI Summary for SBP6.13 Bid Form R7-2022 Yuma Campus Reroof: This document is the SBP6.13 Bid Form for the Yuma Campus Reroof project (Project No. GJRA24-2) under the State of Colorado Office of the State Architect. It includes bidder acknowledgments, base bid amount, time of completion, and compliance requirements such as Colorado labor usage, service-disabled veteran-owned small business status, and bid guarantee details. The form requires bidders to confirm examination of bidding documents and site, certify interested parties, and agree to contract execution terms. It also references applicable state laws for apprenticeship and prevailing wage requirements. The form must be signed by an authorized representative of the bidding entity.
DOCX
DOCX, High priority: read this firstbid-bond
HighAI Summary for SBP6.14 Bid Bond R7-2022 Yuma Reroof: This document is a Bid Bond for the project GJRA24-2 at CDHE/Northeastern Junior College under the State of Colorado Office of the State Architect State Buildings Program. It guarantees that the Principal submitting a proposal will maintain the proposal for 30 days and, if awarded, will execute the required agreement and bonds. The bond amount is 5% of the total bid price, serving as liquidated damages if the Principal defaults. The document requires signatures from the Principal and Surety, including corporate seals and power of attorney. Failure to provide a properly executed bid bond and power of attorney will result in the bid being non-responsive.
DOCX
DOCX, High priority: read this firstlabor-burden-calculation
HighAI Summary for SBP6.18 Labor Burden Calculation for Yuma Campus Reroof: This document is a Labor Burden Calculation form required by the State of Colorado Office of the State Architect for the Yuma Campus Reroof project (Project No. GJRA24-2). It details the percentage components of total labor overhead including benefits such as taxes, pension costs, and insurance that contractors pay to employees. The form must be submitted and agreed upon by both the contractor and Principal Representative before executing a construction agreement. It will be included in the contract as Exhibit A and used for calculating future Change Order Proposals. Separate sheets are required for each contractor and major subcontractors. The state reserves the right to verify all information provided.
PDF
PDF, Low prioritydrawings
LowAI Summary for NJC Yuma Re-Roof Existing Condition Photos: This document titled 'NJC Yuma Re-Roof_Drawings_AD1_2025-05-06.pdf' contains existing condition photos of the NJC Yuma roofing project. The photos show various views and conditions of the existing EPDM, metal siding, metal roof, gutters, fascia, duct penetrations, and penthouse roof. The document is dated May 6, 2025, and includes copyright information from Season 3-1-24 FM. It serves as a visual record of the current state of the roofing and related structures prior to any re-roofing work.