Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on September 20, 2007. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z -- Aquatic Organism Passages on Corral and Daniels Creeks, LEWIS and CLARK NATIONAL FOREST

Awarded
AG-03K0-S-07-0014Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Pennsauken Community Pool Improvements
Solicitation # 2026-BID-15
The Township of Pennsauken, New Jersey, is soliciting bids for the complete rehabilitation and improvement of the Pennsauken Community Pool under solicitation number 2026-BID-15. The scope of work includes significant structural improvements to the pool, the demolition and construction of the pool mechanical room, electrical upgrades, and the installation of plumbing and other general complex upgrades. Specific deliverables include reinforced concrete flooring and walls, sandblasting the pool interior, and the installation of two 25 by 25 foot shade structures. All work must adhere to the 2019 NJDOT Standard Specifications for Road and Bridge Construction, the Americans with Disabilities Act of 1990, and New Jersey Prevailing Wage Act requirements. Bids must be submitted electronically via the OpenGov Procurement Portal by November 10, 2026, at 10:30 AM. The contract will be awarded to the lowest qualified responsible bidder. Submission requirements include a bid bond of 10 percent not to exceed 20,000 dollars, a notarized Non-Collusion Affidavit, a Certificate of Non-Debarment, and signed acknowledgments for Addenda 01 and 02. The successful contractor must provide a performance bond within three days of the contract award. The initial contract period is one year, with a possible one-year extension upon mutual agreement. Payment will be processed through the Township Governing Body following certification by the Township Engineer and the submission of itemized invoices and certified payrolls.
Procurement

POSTED

about 12 hours ago

DEADLINE

in 11 days
NAICS: 237990
New
SLED
Seaview Vehicular Beach Access Ramp Reconstruction Project
Solicitation # 26-B-128CW
The Seaview Vehicular Beach Access Ramp Reconstruction Project, solicitation number 26-B-128CW, is an invitation for bid issued by the County of Volusia to reconstruct a beach access ramp in a residential section of Daytona Beach that was destroyed by Hurricane Ian in 2022. The project scope includes the demolition of storm-damaged infrastructure and the installation of a reinforced concrete vehicular ramp, a pedestrian sidewalk, a concrete cap, and composite sheet pile seawall panels and retaining walls. Additional site improvements include FDOT Type D curbing, an on-beach shower, pavement markings, signage, and full site restoration. The estimated construction cost is 1,213,413.00 dollars, with a total contract performance period of 150 days following the Notice to Proceed. Bids are due electronically via the OpenGov Procurement portal by November 5, 2026, at 3:01 pm, and will be awarded to the single lowest responsive and responsible respondent. The contractor must comply with various regulatory requirements, including permits from the FDEP, USACE, and U.S. Fish and Wildlife Service, as well as the Habitat Conservation Plan for the Protection of Sea Turtles. Mandatory requirements include the provision of payment and performance bonds, comprehensive insurance coverage, and adherence to federal contract provisions such as the Davis-Bacon Act and Equal Employment Opportunity standards. Payments are generally made within 30 days of receipt of an undisputed invoice, with specific sales tax exemption procedures in place for materials.
Coastal

POSTED

about 14 hours ago

DEADLINE

in 6 days

AI Contract Overview

Show more

This contract involves the installation of two steel, multiplate, bottomless arch Aquatic Organism Passage structures at road crossings on Daniels Creek and Corral Creek within the Lewis and Clark National Forest. The scope of work includes removing existing culverts, excavating for pre-cast concrete footings, and reconstructing the stream beds using native materials and machine-placed rocks for grade control. Additionally, the road bed at Corral Creek will be raised by 18 inches with government-furnished embankment and topped with a 4-inch layer of compacted gravel. Managed by the Custer Gallatin National Forest under the Department of Agriculture, the project has an estimated price range between 100,000 and 250,000 dollars. The work was scheduled to begin on August 1, 2007, with a projected completion date of September 1, 2008. The project is categorized under NAICS code 237990 and was administered through the office located in Bozeman, Montana.

General Info

Contract Value

$116,367.17

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

MT, USA

Set-Aside

NONE

Award Issued Date

Documents

1

20070803120251.zip

ZIP

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from Jul 16, 2007 to Sep 4, 2007. The point of contact changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Custer Gallatin National Forest
Contacts2 people available
OfficeBOZEMAN, MT, 59715, USA
Office AddressBOZEMAN, MT, 59715, USA
Contacts
Jan R WenaasContract Specialist
Lori A EbyProcurement Technician

Full Description

Show more
Install two Aquatic Organism Passage (AOP) structures on the Lewis and Clark National Forest. These structures are steel, multiplate, bottomless arch structures and will be located at the road crossings on Daniels Creek and Corral Creek. Work will entail removing existing cmp culverts, then excavation for the placement of pre-cast concrete footings which will support the multiplate strutures. Once the footings are in place, the stream bed between the footings will be constructed with native material to mimic the original stream bed. Large rocks for stream grade control will be machine placed inside the structures. The road bed at Corral Creek AOP will be raised approximately 18 inches with embankment and a 4 inch layer of compacted gravel will be placed on the road surface. The embankment and gravel for Corral Cr. will be Government furnished. Government estimated price range is between $100,000 and $250,000. Estimated start work date of August 1, 2007 with completion by September 1, 2008. Solicitation will be issued on or about June 15, 2007.

More opportunities from Department Of Agriculture → Custer Gallatin National Forest

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS