Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Award Notice opportunity from Department Of Defense was posted on September 21, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z--C-1 Wharf Concrete repairs at Naval Station Mayport, Florida.

Awarded
Federal
Submission Closed
Solicitation #
N6945014D5075X023

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This construction project involves comprehensive concrete and structural repairs at Wharf C1 at Naval Station Mayport, Florida, under solicitation N6945014D5075X023. The contractor is responsible for providing all labor, materials, and equipment necessary to deliver a complete and maintainable final product. Key technical requirements include replacing the wale beam at the southwestern corner, replacing sea pile attachment brackets and bolts per record drawings, and performing tremie pours of 4,000 psi concrete to restore pile integrity. Additionally, the scope includes repairing concrete bullrails using 6,000 psi concrete with a corrosion inhibiting admixture. Operational guidelines require the contractor to coordinate with designated personnel before deploying any vessels. Trailerable vessels may use the onsite boat ramp but must be removed from the water daily, while larger vessels entering from the river are subject to K-9 and Military Police inspections. The contractor maintains full responsibility for securing all equipment and materials stored on government property, as the government assumes no liability for losses. All work must align with the findings detailed in the Site Visit Report regarding vessel impact damage.

General Info

Contract Value

$59,910

NAICS

238110 - Poured Concrete Foundation and Structure Contractors

Place of Performance

FL, USA

Set-Aside

NONE

Award Issued Date

Potential End Date

January 17, 2017

Documents

0

No documents available

This contract was awarded without public documents.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26_1208 – Lumber Bridge-NCOpen now, due in 6 days
  • ASO-0953-00 Construction of standalone DME at Paulding Northwest Atlanta Airport (PUJ), Dallas, GAOpen now, due in 33 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navfacsyscom Southeast
ContactsNo contacts available
OfficeNAS JACKSONVILLE, FL, 32212-0030, USA
Office AddressNAS JACKSONVILLE, FL, 32212-0030, USA
ContactsNo contact information available

Full Description

Show more
This is a Construction project intended to perform repairs at Wharf C1. The contractor shall provide all labor, material, equipment, and other incidental work required to complete this project. Other incidental work required includes any and all items necessary to ensure a complete, usable and maintainable final product including the demolition work not specifically stated elsewhere in this Statement of Work (SOW). Work includes, but is not limited to, the following: 1.The report titled “Site Visit Report, Vessel Impact at wharf C1? describes Wharf damage and provides site pictures. 2.Replace wale beam from free end at the southwestern corner of the wharf and extending two feet past the last cracked portion. The new wale beam shall match the existing. 3.Replace sea pile attachment brackets and bolts as needed. The hardware shall match the record drawing sheet # S-506. 4.Adjust top of pile to bring it back in round using straps or bands. Tremie pour 4,000 psi concrete from the mud line to the top of the pile and allow concrete to cure for a minimum of 7 days before removing bands. 5.Repair concrete bullrails by saw cutting down one inch into the concrete approximately 6 inches past the observed damaged area. Remove concrete to one inch behind the reinforcement and remove loose concrete from the reinforcement. Any reinforcement that has damage to the coating shall be repaired prior to placement of concrete. Form the bullrails and place 6,000 psi concrete with a corrosion inhibiting admixture. Ensure proper placement and curing of the patched area. 6.If using a vessel, the Contractor and crew will have to be briefed once by Bob Reeder, B-2078, 3rd floor, prior to putting a vessel in the water for the first time. Contractor can use the boat ramp in front of B-2078 for trailer able vessels; the vessel shall be removed from the water at the end of each work day but can be left on site by Harbor Ops overnight. Contractor is responsible for securing vessel, equipment, and materials if stored on Government property. The Government shall not be held responsible for any losses. If a vessel is too large to be trailered and has to enter from the river then the vessel will be inspected by K-9, Military Police, etc. Once in the basin a berthing can be provided for the duration of the project.

More opportunities from Department Of Defense → Navfacsyscom Southeast

Same awarding agency

NAICS: 1131
Federal
Salvage Timber Sale at Naval Air Station Whiting Field Santa Rosa County, Florida
Solicitation # N69450-27-RP-00056
The Naval Facilities Engineering Systems Command Southeast is soliciting bids for a salvage timber sale at Naval Air Station Whiting Field in Santa Rosa County, Florida. The project involves the removal of standing and salvage storm-damaged timber—including dead, dying, damaged, or green timber—across approximately 220 acres. The estimated harvest volumes include 6,500 tons of pine pulpwood, 300 tons of hardwood pulpwood, 700 tons of pine chip-n-saw (10-12 inches), and 1,500 tons of pine sawtimber (14 inches and larger), with actual quantities potentially varying from -100% to +150%. This is a sale of surplus contract with no set-aside used. The contract term is 12 months from the date of award, and the property is offered on an as is and where is basis. The contract will be awarded to the responsible purchaser who submits the highest conforming bid. Bidders must submit their proposals in paper media by December 1, 2026, including a bid security of 20% of the bid price. The successful purchaser must provide a performance bond equal to 10% of the contract price and maintain comprehensive general liability insurance of $1,000,000 per occurrence. Performance requirements include strict adherence to USACE EM 385-1-1 safety standards, the submission of an Accident Prevention Plan and Activity Hazard Analysis, and the removal of logging slash from roads and structures. All hazardous material spills must be reported within four hours, and the site must be cleared of all tools and materials upon completion.
Timber Tract Operations

POSTED

8 days ago

DEADLINE

in 4 days
View Details
NAICS: 236220
Federal
HANGAR 140 RENOVATIONS AT NAVAL AIR STATON (NAS) JACKSONVILLE (JAX), JACKSONVILLE, FLORIDA
Solicitation # N6945027RH140
This is a sources sought announcement for a design-bid-build construction project to renovate Hangar 140 at Naval Air Station Jacksonville in Florida. The project scope covers a 111,000 square foot facility, including the administration, shops, and maintenance wings, as well as the organizational hangar. Key work includes space reconfiguration, replacement of finishes, ceiling systems, lighting, plumbing fixtures, and sliding steel hangar bay doors. The project also involves replacing roofing systems, repairing the building envelope for hurricane resistance and Anti-Terrorism Force Protection compliance, removing hazardous materials, and replacing three bridge cranes. The estimated magnitude of construction is between $50 million and $100 million, with an anticipated performance period of 945 calendar days and an expected award date in the fourth quarter of FY 27. The project falls under NAICS code 236220 for Commercial and Institutional Building Construction. There is no set aside used for this procurement. Interested parties must provide capability statements demonstrating the ability to self-perform at least 15 percent of the work and possess a bonding capacity of at least $50 million per project. The government is also gathering industry feedback via a questionnaire regarding the potential implementation of a Project Labor Agreement.
Commercial and Institutional Building Construction

POSTED

8 days ago

DEADLINE

in 3 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS