Z--CA-FWS MODOC NWR-WATER MAIN REPAIR

Awarded
140FC326Q0024Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The U.S. Fish and Wildlife Service, through its Construction A/E Team 3, has issued a firm-fixed-price contract for the repair and replacement of the water main system at the Modoc National Wildlife Refuge located in Alturas, California. The work scope includes excavation, removal and disposal of the existing water main, installation of new piping with associated shutoff valves and connections, system testing, and full restoration of the site to meet Federal, State, and local regulatory standards. The contract is structured as a lowest price technically acceptable award with price as the sole evaluation factor, and performance must be completed within 124 calendar days after issuance of the notice to proceed, with a required performance period running from July 1 through November 1, 2026. The estimated cost range is $50,000 to $65,000, though actual pricing data is not provided in the solicitation, and the contract value remains unconfirmed until award. All work must be performed on-site at the refuge, with the delivery location code 0011280663 and mailing address designated for administrative purposes. The contract incorporates a comprehensive set of FAR clauses requiring strict compliance with labor standards, including the Davis-Bacon Act, as evidenced by the attached wage determination and specific provisions applying Davis-Bacon rates to truck drivers only when acting on-site or between the site and a dedicated nearby facility. The contractor is bound by clauses governing payment procedures, including mandatory electronic invoicing via the Invoice Processing Platform, prompt payment requirements, prohibition of claim assignments, and accelerated payments to small business subcontractors. Construction quality is governed by inspection and warranty provisions, with acceptance occurring at the project site and defective work requiring correction at no additional cost to the government. Special requirements mandate immediate notification of archaeological or historical discoveries, compliance with the Endangered Species Act, strict environmental and hazardous materials handling protocols under multiple federal statutes, and restriction of access to non-essential personnel. Subcontractors must flow down all applicable labor, environmental, and data preservation clauses, and any substitution of key personnel or materials requires prior written approval. The contractor must maintain a current Unique Entity Identifier and CAGE code in SAM.gov and provide all required representations regarding size, socioeconomic status, and compliance with federal prohibitions. The place of performance is a federal wildlife refuge, necessitating adherence to security restrictions, fire danger season rules, and controlled access protocols with potential for work stoppage if sensitive species or cultural resources are encountered.

General Info

Repair water main at Modoc National Wildlife Refuge under federal contract open to all bidders.

Contract Value

$57,000

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

VA, USA

Set-Aside

NONE

Award Issued Date

Documents

2

Solicitation 140FC326Q0024 Water Main Repair at Modoc National Wildlife Refuge

PDF, High priority: read this firstifb
High

SOW Water Main Replacement Modoc NWR Quarters 14

PDF, High priority: read this firstsow
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

Solicitation

Awarded

Contract was awarded

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Construction A/e Team 3 Fws
Contacts1 person available
OfficeFalls Church, VA, 22041, USA
Office AddressFalls Church, VA, 22041, USA
Contacts

Full Description

Show more
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes a solicitation for quotes/bids.

The U.S. Fish and Wildlife Service, U.S. Fish and Wildlife Service, at Modoc National Wildlife Refuge, has a project to replace and overhaul the existing water main system extending from the holding tank junction to Refuge Quarters 14. The water main currently serves the Headquarters office, visitor area, and residential house. The project also includes installation of a new shutoff system to improve water control and service access for the house and backyard area.

The construction magnitude is estimated to be between $50,000 to $65,000.00.

The office is located:
Modoc National Wildlife Refuge
5364 County Road 115,
Alturas, CA 96101-1610

The Government anticipates 124 days, period of performance from July 1, 2026, through November 1, 2026, issuance of the Notice to Proceed (NTP) or contingent upon contract award.

Wage Rates:
General Wage Rate Decision Number: CA20260007 01/23/2026
State: California
County: Alpine, Amador, Butte, Colusa, El Dorado, Glenn, Lassen, Marin, Modoc, Napa, Nevada, Placer, Plumas, Sacramento, Shasta, Sierra, Siskiyou, Solano, Sonoma, Sutter, Tehama, Trinity, Yolo and Yuba Counties in California

This Request for Proposal (RFP) is a TOTAL SMALL BUSINESS SET ASIDE and is conducted under the procedures of FAR Parts 12 and 13, incorporating provisions and clauses in effect through Federal Acquisition Circular 2024-03. The NAICS code is 237110 - Water and Sewer Line and Related Structures Construction and the small business size standard is $19.0m.

Instructions to offeror:
All responsible small business sources shall review all documentation and submit a quote, which shall be considered by the agency. The contractor must show within the proposal relevant Water Main Overhaul Meet or Exceed; experience by demonstrate the ability to successfully complete as follows; all state and local law; provides appropriate within the state of California.

Furthermore, review entity of the solicitation packet to include statement of work and associated attachments details to create bid to the standard terms and conditions of the solicitation that will be made as a firm-fixed-price contract. The basis of contract will be on Price, as acceptability for this requirement below. Award of the contract will be made to a responsible source pursuant to FAR subpart 9.1

Please submit your bid with solicitation document (showing unit and total price) on company letterhead; Pricing Form; SAM.gov UEI code; point of contact phone number and e- mail address. Refer to FAR provision 52.212-1 Instructions to Offerors ¿ Commercial Items for additional submission guidance and include a copy of FAR provision 52.212-3 Offeror Representations and Certifications -- Commercial Items with applicable sections completed.

Bond Requirements:
Contractors are reminded that any amount awarded over $35,000 requires submission of a Payment Bond. Any amount over $150,000.00 requires both payment and performance bonds. Bonds are due no later than 10 calendar days after award. Due to the project magnitude, both payment and performance bonds will be required.

Format for Quotes:
1. Quote shall be 8 ½¿x 11¿
2. A page is defined as one face of a sheet of paper containing information
3. Typing shall not be less than 12 pitches (Times New Roman/Ariel/Etc.), 1-inch border, no artistic script fonts for readability
4. Elaborate formats, bindings or color presentations are not desired or required

Any and all questions shall be submitted via email only; no verbal questions will be accepted. Please be sure to include the solicitation number in your proposal and in the subject line of any email submitted.
E-Mail Submission for Questions & Proposals: contact@example.gov

Site Visit: Friday, May 22 from 11 am to 3:30 pm PST & Thursday, May 28 from 11 am to 3:30 pm PST
Question Deadline Date: 12:00 PM PST ¿ Monday, June 1, 2026
Proposal Due: 12:00 pm PST ¿ Monday, June 15, 2026

Solicitation Package:
¿SF1449 - Solicitation
¿Pricing Form
¿Clauses & Provisions (Terms and Conditions) Wage Rate Determination
¿Statement of Work (SOW)
¿One (1) Attachments


In order to have a quote considered for award, respondent must be registered at the System for Award Management (SAM) website (https://www.sam.gov ) as an active vendor by the time an award decision is necessary.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business designations, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by the deadline of December 4, 2026. The scope of work involves comprehensive sewer installation and site development, including the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Key structural requirements include the installation of standard and doghouse manholes, interior drop assemblies, and a CSO regulator fit out. Specialized tasks include 24-inch DIP trenchless crossings with associated launch and receiving shafts, as well as the abandonment of existing pipes and manholes. Site work entails clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Critical project deliverables include the maintenance of flows and bypass for all pipes and manholes to ensure operational continuity, along with geotechnical instrumentation and monitoring. Additionally, the project requires specific railroad insurance. The bid schedule outlines various general and contingent items, including mobilization and extra depth excavation, though the total estimated contract value is not specified.
Cleary Construction, Inc.

POSTED

14 minutes ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer connections. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on responsiveness regarding the submission of MWBE documents, including the Good Faith Efforts Form and Table A. Performance is governed by EJCDC standard forms, including the C-700 General Conditions and C-800 Supplementary Conditions. The contractor is required to provide performance and payment bonds, as well as proof of insurance. Project timelines are triggered by a Notice to Proceed, and failure to achieve substantial completion will result in liquidated damages of 1,000 dollars per day. Payment is processed via applications for payment submitted to the Engineer, with terms due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

14 minutes ago

DEADLINE

in 11 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation and operation of a temporary 11 MGD pumped bypass. Additionally, the project entails the rehabilitation of reactor mixers and aerators, replacement of motor control center components, modifications to sluice and slide gates, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to various small business set-asides, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Subcontractors are specifically requested for lead abatement, metals fabrication, painting, coatings, FRP reinforcing systems, and access hatches. All subcontractors must utilize union labor and be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of bid for reimbursement. Quotes are due by November 17, 2026, and the final bid date is November 18, 2026. Contracts will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

14 minutes ago

DEADLINE

in 20 days
View Details

More opportunities from Department Of The Interior → Construction A/e Team 3 Fws

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS