Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity was posted on September 19, 2007. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z -- Commisary SMAP Floor install

Closed
Reference-Number-F1A3D37232A008Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238330
New
SLED
Taylor Center - Bresnan Wood Floor Replacement
Solicitation # SRC-MNSU-2027-000651-RFB
Solicitation SRC-MNSU-2027-000651-RFB is a request for bids from the Minnesota State Colleges and Universities System for the replacement of the wood floor at the Taylor Center Bresnan Arena Court at Minnesota State University, Mankato. The scope of work involves the removal and disposal of existing maple flooring, the installation of 25/32” x 2-1/4” 2nd and better grade maple, and the application of a water-based seal and oil modified gloss finish. The selected vendor will also assist in redesigning graphics and game lines and will be responsible for the final cleaning and protection of the entire arena, including the seating area. Any necessary subfloor repairs will be handled on a time and material basis, requiring the vendor to provide an hourly rate in their bid. The project is scheduled to begin on May 17, 2027, with substantial completion by June 28, 2027, and final completion by July 9, 2027. The contract will be awarded to the lowest priced, qualified bidder who meets all technical requirements, timeline constraints, and terms and conditions. Bidders must submit a lump sum total bid and provide required documentation, including an Affidavit of Non-Collusion, an Affirmative Action declaration, and a Supplier Diversity Form. All submissions must be made electronically through the Minnesota State e-procurement system by the deadline of November 12, 2026. Compliance with prevailing wage standards is mandatory for this project.
Minnesota State Colleges and Universities System

POSTED

about 22 hours ago

DEADLINE

in 23 days
NAICS: 238330
New
Federal
USMC Stair Runner Replacement for Home of the Commandant
Solicitation # M0026427RFI002
The Department of Defense, through the Marine Corps, has issued a sources sought announcement under solicitation M0026427RFI002 to conduct market research for the replacement of the stair runner at the Home of the Commandant in Washington D.C. This project requires a custom, like-for-like replacement for three flights of stairs and associated landings, designed to replicate the existing runner's appearance, color, pattern, and texture to maintain the residence's historic architectural character. The scope of work includes field measurements, the provision of material samples for government approval, fabrication of a professional-quality runner with finished edges, and full installation. The project must be completed by April 16, 2027, with work typically performed Monday through Friday from 7:00 AM to 4:00 PM. This opportunity is designated as a total small business set-aside under NAICS code 238330. Interested vendors must demonstrate experience in custom carpet fabrication and professional installation. Key requirements include the use of protective coverings to safeguard historic woodwork and architectural features, the removal of all contractor-generated debris, and compliance with security and access-control protocols at Marine Barracks Washington. Responses must be submitted to Sergeant Jacob Espinosa by 10:00 AM EST on October 22, 2026, and should include the company name, address, phone number, point of contact, CAGE code, company size status, and ownership nationality.
Commander

POSTED

about 23 hours ago

DEADLINE

in 2 days

General Info

Agency

N/A

NAICS

238330 - Flooring Contractors

Place of Performance

200 Luke Ave SWBolling AFB, DC 20032

Set-Aside

SDVOSBC

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Notice updated

Response deadline changed from Sep 21, 2007 to Sep 26, 2007. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
William T McGrewContract Administrator

Full Description

Show more
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR subpart 12.603, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation, and a written solicitation will not be issued. The solicitation document and incorporated provisions and clauses are in effect through Federal Acquisition Circular (FAC) 2005-18. This solicitation is a Service Disabled Veteran-Owned Small Business set-aside. The North American Industry Classification System code is 238330 at $13 million size standard. The contractor shall remove and replace approximately 1,950 square feet of quarry tile and replace with new Seamless Monolithic Aggregate-matrix Polymer (SMAP) in accordance with Statement of Work. *****THIS REQUIREMENT IS CURRENTLY UNFUNDED AND IS SUBJECT TO AVAILABILITY OF FUNDS***** DESCRIPTION OF SERVICES. The contractor shall provide all labor, equipment, tools, materials, transportation, supervision, and other items and services necessary to remove existing quarry tile and install a new SMAP floor system in building 4570, Bolling Air Force Base, Washington, DC. The following work description shall serve as general information only and shall not limit the contractor?s responsibility or obligations to conform to all state, local laws and manufacturer?s recommendations. The estimated area for installation is approximately 1,950 square feet of SMAP floor covering area. All measurements and quantities are approximate. The contractor is responsible for verifying all quantities and measurements. The performance period shall start 30 working days after contract award. Work schedule shall be coordinated with Civil Engineer Squadron?s Quality Assurance Personnel prior to start of work. REMOVAL/INSTALLATION.The contractor shall take up and remove the existing quarry tile floor covering and any loose concrete. Prepare concrete floor by shotblast and/or grinding. Ensure bare floors are flash patched, leveled, and that all floor drains are clear and prepared for installation with the SMAP floor system. Furnish and install new red seamless monolithic aggregate matrix polymer (SMAP) flooring. The finished flooring shall slope towards existing floor drains. Provide smooth transition strips to adjacent floor materials (wrapping room, storage room, and hallway at doors). The contractor shall remove doors, appliances, and fixtures, such as the compartmental sink, prior to working on the floor and reinstall them after completion of the floor work. As required, adjust door glides and doors, using existing hardware to allow for doors to operate with new flooring elevation. Store management will remove the operational equipment, i.e. cutters, grinders, etc. prior to contractor work. PRE-INSTALLATION REQUIREMENTS: Before project start, the contractor shall inspect the work site and ascertain all information necessary to deliver complete performance of services. The contractor shall notify the Contracting Officer of any conditions that prevent the completion of these services. Contractor shall provide Material Safety Data Sheets (MSDS?s). SINGLE SOURCE RESPONSIBILITY: Contractor shall install materials produced by a single manufacturer for all required material, including adhesives. Materials shall be delivered to project site in original factory wrappings and containers, clearly labeled with identification of manufacturer, brand name, and pattern name, quality of grade, fire hazard classification and lot number. Material shall be delivered undamaged to the site. All damages incurred during delivery or installation shall be the sole liability of the contractor. Contractor shall comply with instructions and recommendations of manufacturer for special delivery, storage, handling and installation requirements. REMOVAL AND DISPOSAL. All floors shall be thoroughly cleaned; all existing adhesive residue, debris and cuttings left from the old tile shall be disposed of. Disposal. Existing tile and product installation waste shall be disposed of by the contractor at an off base reclamation site that meets all local, County, State and Federal regulations. After removing existing tile; inspect and prepare the sub-floor surfaces to achieve satisfactory conditions free from cracks, holes, ridges, coating preventing adhesive bond and other defects impairing performance or appearance. Contractor shall repair minor holes, cracks, depressions, and rough areas using leveling and patching compounds as recommended by flooring manufacturer. Contractor shall ensure large debris and tile are removed from floor prior to glue application. INSTALLATION: Installation of SMAP floor system shall be in accordance with the recommendations, instructions and requirements of the manufacturer so as not to void any material warranty. The contractor shall be held liable for any loss of material warranty as a result of not following manufacturer?s required procedures. Contractor shall scribe, cut and fit floor system around permanent fixtures, built-in furniture and cabinets, pipes, outlets, and permanent columns, walls and partitions. Contractor is responsible for replacing cove base throughout area where tile is installed. All newly installed cove base shall have no obvious gaps from the wall if necessary. When installation is completed, all SMAP floor system shall have no bulges, wrinkles, bubbles, open seams or other irregularities affecting the appearance and serviceability. Provide transition strips or protective edges where the floor system meets other flooring materials. CLEANING: Contractor shall mop area if necessary at the end of the operation; removing all cuttings and scrap materials. Residue shall be cleaned from the newly installed floor surface and cove base using manufacturer?s suggested cleaning products. DISPOSAL: It shall be the responsibility of the contractor to remove and dispose of discarded materials at an off base site that meet all local, County, State and Federal regulations. The contractor shall not use any installation dumpster for disposal. CONTRACTOR REQUIREMENTS: All work shall be performed by contractor/installers who are CFI Certified Floor covering Installers (International Certified Floor covering Installer Association). THE GOVERNMENT SHALL NOT REIMBURSE RESPONDENTS FOR ANY COSTS ASSOCIATED WITH SUBMISSION OF THE INFORMATION BEING REQUESTED OR REIMBURSE EXPENSES INCURRED TO INTERESTED PARTIES FOR RESPONSES TO THIS SOLICITATION. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION, EITHER BEFORE OR AFTER THE CLOSING DATE. INSPECTON AND ACCEPTANCE TERMS: Contractors standard inspection procedures shall be used. Delivery/Acceptance will be at Building 4570, Bolling AFB, Washington DC 20332. Delivery of all supplies will be no later than 30 days ADC, to Building 4570, Bolling AFB, Washington DC 20332. Contractor shall offer to the Government the same warranty commonly accepted in similar commercial purchases. All interested contractors are to submit a copy of their quotation by the solicitation due date. Quotes should list individual items (i.e., labor, price per square foot, price per linear foot, etc.) for evaluation purposes. FAR PROVISIONS INCORPORATED BY REFERENCE: 52.212-1 Instructions to Offerors-Commercial Items, 52.215-1 Alt I Instructions to Offerors ? Competitive, 52.215-5 Facsimile Proposals, 52.237-1 Site Visit. FAR PROVISIONS INCORPORATED BY FULL TEXT: 52.212-2 Evaluation-Commercial Items (Jan 1999) applies to this acquisition, specifically the following criteria: The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforms to the solicitation and is determined to be the most advantageous to the government, price and other factors considered. However, when combined, Past Performance is significantly more important than price alone.. 52.212-3 Offerors Representations and Certifications-Commercial Items, 52.219-1 Alt I Small Business Program Representation, 52.222-22 Previous Contracts and Compliance Reports, 52.222-25 Affirmative Action Compliance, 52.252-1 Solicitation Provisions Incorporated by Reference, 52.252-3 Alterations in Solicitation. Offeror must include, with its offer, a completed copy of provision FAR 52.212-3 in full text. FAR CLAUSES INCORPORATED BY REFERENCE: 52.204-7 Central Contractor Registration, 52.204-9 Personal Identity Verification of Contractor Personnel, 52.212-4 Contract Terms and Conditions ? Commercial Items, 52.219-6 Notice of Total Small Business Set-Aside, 52.222-3 Convict Labor, 52.222-19 Child Labor ? Cooperation with Authorities and Remedies, 52.222-21 Prohibition of Segregated Facilities, 52.222-26 Equal Opportunity, 52.222-36 Affirmative Action for Workers with Disabilities, 52.222-41 Service Contract Act of 1965, as Amended, 52.223-3 Hazardous Material Identification and Material Safety Data, 52.223-5 Pollution Prevention and Right-to-Know Information, 52.223-6 Drug-Free Workplace, 52.223-10 Waste Reduction Program, 52.223-11 Ozone-Depleting Substances, 52.225-13 Restrictions on Certain Foreign Purchases, 52.232-33 Payment by electronic Funds Transfer ? Central Contractor Registration, 52.233-1 Disputes, 52.233-3 Protest After Award, 52.233-4 Applicable Law for Breach of Contract Claim, 52.237-2 Protection of Government Building, Equipment, and Vegetation, 52.242-15 Stop-Work Order, 52.246-1 Contractor Inspection Requirements, 52.247-34 F.o.b. Destination, 52.253-1 Computer Generated Forms, 252.212-7001 Contract Terms and Conditions Required to Implement Statutes or Executive Orders Applicable to Defense Acquisitions of Commercial Items, 252.223-7001 Hazard Warning Labels, 252.225-7001 Buy American Act and Balance of Payments Program, 252.225-7002 Qualifying Country sources as Subcontractors, 252.232-7003 Electronic Submission of Payment Requests, 252.232-7010 Levies on Contract Payments, 252.243-7001 Pricing of Contract Modifications, 252.246-7000 Material Inspection and Receiving Report, 252.247-7006 Removal of Contractor's Employees, 252.247-7007 Liability and Insurance. FAR CLAUSES INCORPORATED BY FULL TEXT: 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders, 52.219-28 Post-Award Small Business Program Representation, 52.222-42 Statement of Equivalent Rates for Federal Hires, 52.223-11 Ozone- Depleting Substances, 52.252-2 Clauses Incorporated by Reference, 52.252-4 Alterations in Contracts, 252.212-7001 Contract Terms and Conditions Required to Implement Statutes of Executive Orders Applicable to Defense Acquisitions of Commercial Items, 5352.242-9000 Contractor access to Air Force installations, 5352.223-9001 Health and Safety on Government Installations. All responses must be received no later than 4:30pm Eastern Standard Time, 26 September 2007 to 11th CONS/LGCF 110 Luke Ave, Bldg 5681, Bolling AFB, DC 20032 by mail, facsimile, or e-mail to william.mcgrew@bolling.af.mil. An official authorized to bind your company shall sign the offer. Proposals received after the due date will not be considered. THERE WILL BE A SITE VISIT AT BUILDING 4570 ON BOLLING AFB ON 19 SEPTEMBER 2007 AT 0900. PLEASE CONTACT SRA WILLIAM MCGREW IF YOU ARE PLANNING TO ATTEND NO LATER THAN 1500 ON 18 SEPTEMBER 2007. The incorporated wage determination WD 05-2103 (Rev -4) dated 5 July 2007 is applicable. The website for this wage determination is http://www.wdol.gov/wdol/scafiles/std/05-2103.txt. To be eligible for an award, all contractors must be registered in the Central Contractor Registration (CCR). A contractor can contact the CCR by calling 1-888-227-2423 or via the internet at www.ccr.gov. The FAR clause web site is http://farsite.hill.af.mil. Questions concerning this solicitation should be addressed to SrA William McGrew, Contract Specialist, Phone (202) 767-8090, FAX (202) 767-7896, E-mail to william.mcgrew@bolling.af.mil.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS