Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Z--DEVA 318717 - Rehab Furnace&Cow Creeks W&WW System

Awarded
140P2025R0082Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract pertains to the comprehensive rehabilitation of water and wastewater treatment systems at Furnace Creek and Cow Creek within Death Valley National Park, under solicitation number 140P2025R0082, issued by the Department of the Interior’s DSC Contracting Services Division. The project encompasses a wide range of construction, demolition, and system upgrade activities including the rehabilitation and replacement of gravity and force main sewer lines, lift stations, RO plants, manholes, water service connections, and associated appurtenances such as valves, hydrants, backflow preventers, and chemical feed systems. Detailed engineering drawings and technical specifications outline construction requirements for all components, including precise alignment plans, profile elevations, manhole designs, fencing installations, and sensitive area protection measures to ensure compliance with environmental, archaeological, and tribal monitoring protocols. The scope includes both base work and multiple optional line items, with pricing structured across 27 contract line items and supported by detailed breakdowns of labor, equipment, and material costs. Compliance with federal construction standards is mandated through specifications referencing ASTM, NACE, SSPC, ACI, and other industry codes governing materials, testing, installation, and quality assurance procedures. The contract requires strict adherence to Davis-Bacon prevailing wage rates specific to Inyo, Kern, and Mono Counties, as updated through wage determinations CA20260020 Mod 2, and mandates full compliance with all applicable Federal Acquisition Regulation clauses, including those related to whistleblower rights, cybersecurity prohibitions, small business participation, and environmental protection. Proposals must be submitted electronically in two volumes—non-price and price—with Volume I containing narrative documentation on project experience, technical approach, management, past performance, and small business participation, and Volume II containing completed pricing worksheets, bonds, certifications, and references, all delivered via email within specified file size and formatting limits. The proposal deadline was extended to February 17, 2026, following multiple amendments clarifying technical requirements, site visit logistics, and clarifications on specifications for generators, waterproofing, wildlife protections, and SCADA system integration. Construction must commence within ten calendar days of notice to proceed and be fully completed within 915 calendar days, with inspection and acceptance occurring on-site. The award will be based on a best-value tradeoff process, evaluating technical competence, schedule realism, management capability, past performance, and small business subcontracting efforts equally against price, with the government retaining final authority for acceptance and the right to audit

General Info

Rehabilitation of water and wastewater systems at Death Valley National Park with strict regulatory compliance.

Agency

Department Of The Interior → Dsc Contracting Services DivisionView Agency

Contract Value

$69,535,671

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

CO

Set-Aside

NONE

Awardee

PERINI MANAGEMENT SERVICES, INC.View Profile

Award Issued Date

Documents

(110)

RFP No. 140P2025R0082 Attachment 4 - Detailed Contract Price Schedule Worksheet

XLSX12 pagescontract-price-schedule

Amendment 0009 to Solicitation 140P2025R0082

PDF2 pagesamendment

B09_Amd8_-_Drawing_01-X1_0_Jan2026_0008 Demolition Plan Furnace Creek

PDF1 pageamendment

B09 Amendment 8 Drawing 02-C6.15 Manhole Details

PDF1 pageamendment

RFP 140P2025R0082 Amendment Q&A Tracker - DEVA 318717

XLSX20 pagesamendment

Amendment 10 Attachment Drawing C1.40B 0010

PDF1 pageamendment

B09 Amendment 8 Drawing 02-C5.48 Jan 2026

PDF1 pageamendment

B09 Amendment 10 QR55 Drawing 01-C4.38 Jan 2026

PDF1 pageamendment

Amendment 10 Attachment Drawing C8.27 Site Fencing Details

PDF1 pageamendment

B09 Amendment 8 QR22 Drawing 00-C7.1 Jan 2026

PDF1 pagespecifications

B09_Amd8 Temporary Water Plan Drawing Furnace Creek Water System

PDF1 pagedrawing

Specification 33 31 05 - Manhole Lining and Rehabilitation Amendment 8

PDF8 pagesspecifications

Specification 33 31 11 - Gravity Sewer Pipeline and Manhole Installation Amendment 8

PDF12 pagesspecifications

Amendment 10 to Drawing G1.22.0010 Sensitive Area Protection Plan

PDF1 pageamendment

B09 Amendment 8 Drawing 01-C4_38 Jan2026

PDF1 pageamendment

Amendment 0007 to Solicitation 140P2025R0082 for DEVA 318717 Construction Project

PDF2 pagesamendment

RFP No. 140P2025R0082 Attachment 4 - Detailed Contract Price Schedule Worksheet

XLSX13 pagescontract-price-schedule

Amendment 8 Drawing 02-X1.2 Jan 2026 Demolition Plan

PDF1 pageamendment

B09 Amendment 6 QR No36 DEVA CCTV Inspection Report 11-03-22

PDF46 pagesreport

B09_Amd10 QR55 Attach Drawing 01-C4_40 Jan2026

PDF1 pagedrawing

B09_Amd8_-_Drawing_Coversheet_00_DEVA_318717_Jan2026_0008 - Construction Drawing Coversheet

PDF1 pageconstruction-drawing

B09_Amd8_Spec_33_14_19_Valves_and_Hydrants_for_Water_Utility_Service

PDF19 pagesspecifications

RFP 140P2025R0082 Amendment Q&A Tracker DEVA 318717

XLSX24 pagesamendment

B09_Amd6 QR No36 Attach4 DEVA-NP Inspection Report 06-08-2023

PDF9 pagesinspection-report

Amendment 0011 to RFP 140P2025R0082 - Construction Wage Determination Update

PDF2 pagesamendment

B09 Amendment 8 Drawing 02-C2.22 Jan 2026

PDF1 pageamendment

B09 Amendment 8 QR56 Attachment Drawing 02-C2 20 Dec 2025

PDF1 pageamendment

B09 Amendment 8 Drawing 01-C1.31 Jan 2026

PDF1 pageamendment

B09 Amendment 8 Drawing 02-C3.8 Water Service Connections

PDF1 pageamendment

B09_Amd8_-_Drawing_02-C5_33_Jan2026_0008 Engineering Drawing Amendment

PDF1 pageamendment

B09 Amendment 8 Drawing 02-C5 25 Jan 2026

PDF1 pageamendment

Amendment 8 - Specifications for Wastewater Pumping Stations

PDF14 pagesamendment

B09_Amd8_Spec_46_33_11_Chemical_Feed_Liquid_Systems

PDF5 pagesspecifications

Amendment 8 Drawing 02-C5.29 Skyline Drive Jan 2026

PDF1 pageamendment

B09 Amendment 8 Drawing 01-C1_42 Jan2026

PDF1 pageamendment

B09 Amendment 8 Drawing 01-C1.64 Jan2026

PDF1 pageamendment

B09 Amendment 10 Drawing Coversheet DEVA 318717 Jan2026

PDF1 pageamendment

B09 Amendment 8 Drawing 01-C3.6 Water Service Connections

PDF1 pageamendment

B09 Amendment 8 Demolition Footnotes Drawing 02-X1-1 Jan 2026

PDF1 pageamendment

B09 Amendment 8 Drawing 01-C1 22 Jan 2026

PDF1 pageamendment

B09_Amd8_-_QR63_Attach_Drawing_00-C3_16_Dec2025_0008 - Water and Sewer Line Details

PDF1 pagedrawing

B09_Amd6 QR No36 DEVA-NP 0006 Inspection Report 06-07-2023

PDF38 pagesinspection-report

Amendment 10 Drawing G1.2 Sheet Index for Death Valley National Park Project

PDF1 pageamendment

B09 Amendment 8 Drawing 02-C7.6 Lift Station Plan 6 Dec 2025

PDF1 pageamendment

Wage Determination CA20260020 Modification 2

PDF24 pageswage-determination

B09_Amd8_-_Drawing_01-C3_1_Dec2025_0008 - Water Fittings Drawing Amendment

PDF1 pageamendment

DEVA 318717 Temporary Facilities and Controls Specification

PDF5 pagesspecifications

B09_Amd6 QR No36 Attachment 2 Inspection Report 06_06_2023

PDF36 pagesinspection-report

B09 Amendment 10 QR55 Drawing 01-C4.42 Jan2026

PDF1 pageamendment

B09 Amendment 8 Drawing 00-G1.2 Jan 2026 Sheet Index

PDF1 pageamendment

B09 Amendment 8 Drawing 023-D101 Dec2025

PDF1 pageamendment

DEVA 318717 Pre-Proposal Site Visit Presentation

PDF13 pagespre-proposal-presentation

Amendment 0008 to Solicitation 140P2025R0082 for DEVA 318717 Construction Project

PDF3 pagesamendment

B09 Amendment 8 Drawing 00-C3.18 Water Details Dec 2025

PDF1 pageamendment

B09 Amendment 8 QR56 Attachment Drawing 02-C2 18 Dec 2025

PDF1 pageamendment

B09 Amendment 8 Drawing C3.15 Water Details Dec 2025

PDF1 pageamendment

B09 Amendment 10 Drawing G1.21.0010 Sensitive Area Protection Plan Furnace Creek

PDF1 pageamendment

B09 Amendment 8 Drawing 02-C5.64 Jan 2026

PDF1 pagedrawing

B09 Amendment 8 Drawing 02-C2.54 Dec2025

PDF1 pageamendment

B09 Amendment 6 QR No36 Attachment 1 DEVA 0006 Inspection Report 06-05-2023

PDF22 pagesinspection-report

Specification Section 22 11 23 Plumbing Pumps

PDF4 pagesspecifications

Amendment 8 Drawing 02-C6_7 Jan 2026 Manhole Details

PDF1 pageamendment

B09 Amendment 5 Pre-Proposal Sign-In Sheet DEVA 318717 0005

PDFamendment

B09_Amd8_-_Drawing_00-C3_20_Dec2025_0008 Water Details

PDF1 pagedrawing

B09 Amendment 10 QR86 Drawing C1.40.0010

PDF1 pageamendment

B09_Amd8 Drawing 02-G1 Temporary Water Plan Dec 2025

PDF1 pageamendment

B09 Amendment 8 Drawing 01-C1.67 Jan2026

PDF1 pageamendment

Amendment 0005 to Solicitation 140P2025R0082

PDF2 pagesamendment

B09 Amendment 8 Drawing 01-C1.29 Jan 29 2026

PDF1 pageamendment

DEVA 318717 Section 33 11 13 Potable Water Supply Wells Specifications Amendment 8

PDF12 pagesspecifications

B09 Amendment 8 Drawing 01-C3 3 Dec 2025

PDF1 pageamendment

Amendment 0006 to Solicitation 140P2025R0082

PDF2 pagesamendment

RFP 140P2025R0082 Amendment Q&A Tracker DEVA 318717

XLSX24 pagesamendment

Amendment 0010 to Solicitation 140P2025R0082 for DEVA 318717 Construction Project

PDF2 pagesamendment

Specification Section 08 33 22 Aluminum Rolling Overhead Doors Amendment 8

PDF10 pagesspecifications

B09 Amendment 8 Drawing 02-C7.5 Wastewater Lift Station Details

PDF1 pageamendment

B09 Amendment 8 Drawing 01-C1.47 Dec2025

PDF1 pageamendment

B09 Amendment 8 Drawing 00-C_19 Dec2025

PDF1 pagedrawing

B09 Amendment 8 Drawing 00-C8 Vault Toilet Details Death Valley National Park

PDF1 pageamendment

Amendment 8 Drawing 01-C4.42 Jan2026 Furnace Creek Wastewater Sewage Lagoon System Cell #3 Grading Plan

PDF1 pageamendment

B09_Amd8_-_Drawing_00-C7_2_Dec2025_0008 - Wastewater Details Drawing

PDF1 pagedrawing

B09_Amd5 Pre-Proposal Site Visit Agenda DEVA 318717

PDF3 pagespresolicitation

Solicitation 140P2025R0082 General References Form

DOC2 pagesgeneral-references

Specification 43 41 43 Polyethylene Chemical Tanks Amendment 8

PDF10 pagesspecifications

RFP 140P2025R0082 Amendment 6 Q&A Tracker

XLSX20 pagesamendment

B09 Amendment 10 QR55 Drawing 01-C4_39 Jan2026

PDF1 pageamendment

B09 Amendment 7 Q37 Attachment Project Management Specifications

PDF1 pagespecifications

RFP 140P2025R0082 Addendum Specification Section 01 50 00 Temporary Facilities and Controls

PDF1 pageamendment

B09 Amendment 2 Tenant Expectations Handbook DEVA 318717

PDF34 pagesamendment

Wage Determination CA20250020 Mod 15

PDF27 pageswage-determination

Solicitation 140P2025R0082 Project Experience Questionnaire

DOCX1 pageproject-experience-questionnaire

Amendment 0002 to RFP 140P2025R0082

PDF2 pagesamendment

B08_Attach2c_-_Drawings_DEVA_318717_Jan2025

PDF128 pagesother

Drawings DEVA 318717 Jan2025

PDF64 pagesother

Amendment 0004 to RFP 140P2025R0082 - DEVA 318717

XLSX4 pagesamendment

DEVA 318717 Division 01 Specifications - Rehabilitation of Water and Wastewater Systems at Furnace Creek and Cow Creek Areas

PDF152 pagesother

Amendment 0001 to RFP 140P2025R0082

PDF2 pagesamendment

Solicitation 140P2025R0082 Cow & Furnace Creeks W&WW Treatment Systems

PDF67 pagesrfp

Past Performance Questionnaire for Solicitation 140P2025R0082

DOCX3 pagespast-performance

B08_Attach2e Drawings DEVA 318717 Jan2025

PDF129 pagesother

Small Business Subcontracting Plan for Solicitation 140P2025R0082

DOCX7 pagesother

Amendment 0004 to RFP 140P2025R0082 for DEVA 318717

PDF2 pagesamendment

DEVA 318717 Brand-Name Justification and Approval for SCADA Software

PDF2 pagesjustification-and-authorization

Drawings DEVA 318717 Jan2025

PDF64 pagesdrawings

RFP 140P2025R0082 Amendment 0001 - Construction Admin Camp Q&A

PDF4 pagesamendment

DEVA Water and Wastewater System Rehab Drawings Jan 2025

PDF128 pagesother

RFP 140P2025R0082 Detailed Contract Price Schedule Attachment 4

XLSX8 pagesother

Solicitation 140P2025R0082 - Rehabilitate Furnace Creek and Cow Creek Water and Wastewater Treatment Systems

PDF2 pagesifb

Amendment 0003 to RFP 140P2025R0082 for Pre-Proposal Site Visit

PDF2 pagesamendment

DEVA 318717 Division 02-49 Specifications for Water and Wastewater Rehabilitation

PDF1487 pagesspecifications

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

7 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Amendment 3

Contract was updated

Amendment 4

Contract was updated

Amendment 5

Contract was updated

Amendment 6

Contract was updated

Amendment 7

Contract was updated

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Dsc Contracting Services Division
Contacts1 person available
OfficeDenver, CO, 80225, USA
Organization / Agency
Department Of The Interior → Dsc Contracting Services Division
View Agency Profile
Office AddressDenver, CO, 80225, USA

Full Description

Show more
DEVA 318717 - "Rehabilitate Furnace Creek and Cow Creek Water and Wastewater Treatment Systems."

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is seeking MBE, DBE, and WBE subcontractors and suppliers for a targeted green-street retrofit project in downtown Romney, West Virginia. The project involves the construction of approximately 343.59 linear feet of South Marsham Street between Gravel Lane and US Route 50. The scope of work includes the installation of 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and necessary drainage, underdrain, inlet, pipe, tie-in, and downspout work. Additionally, the project requires limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor, as well as the planting of six native trees and approximately 345 native plants. The goal is to treat approximately 1.7 acres of impervious surface within a 3.3-acre drainage area, concluding with final stabilization, cleanup, and restoration. This solicitation is open to various small business concerns, including veteran-owned, service-disabled veteran-owned, HUBZone, disadvantaged, woman-owned, and minority-owned businesses. To accommodate the project scale, these entities are encouraged to form consortiums if individual bid items are too large for a single firm to handle. Bids must be submitted by September 17, 2026, at 4:00 P.M. Interested parties should contact Jonah Leith or Jennifer Wilson for further details and must provide a response indicating their intent to bid.
Harbel, Inc.

POSTED

about 13 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, is a comprehensive infrastructure initiative issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches in diameter, as well as 54-inch and 145.5-inch diameter tie-ins and associated pipe fittings. Additional construction requirements include the delivery of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, and surface restoration, alongside the excavation of cobbles and large boulders. This solicitation, posted on September 11, 2026, with a response deadline of September 29, 2026, is open to small businesses, including certified service-disabled veteran-owned, minority, and women-owned enterprises. The prime contractor, J.W. Fowler, is actively seeking subcontractor pricing and offering support to M/W/DBE firms regarding bonding, insurance, and equipment procurement to maximize participation.
James W. Fowler Co.

POSTED

about 13 hours ago

DEADLINE

in 16 days
View Details

More opportunities from Department Of The Interior → Dsc Contracting Services Division

Same awarding agency

NAICS: 237110
New
Federal
Y--Rehabilitation of Water and Wastewater System
Solicitation # 140P2026B0003
Solicitation 140P2026B0003 is a sealed bid invitation for bid issued by the National Park Service Denver Service Center for the rehabilitation of water and wastewater systems at the Curecanti National Recreation Area in Colorado. This total small business set-aside project focuses on replacing and upgrading critical infrastructure at Elk Creek and Lake Fork, including primary and secondary water distribution, wastewater collection, septic tanks, leach fields, and lift stations. The scope also encompasses electrical and mechanical upgrades, the installation of a supervisory control and data acquisition (SCADA) system for remote monitoring, and the creation of a potable water truck filling station. The estimated project value ranges from 5 million to 15 million dollars, with a performance period extending from July 20, 2026, to October 31, 2028. The contract will be awarded to the lowest responsible bidder based on a proposal consisting of five base line items and four optional line items. Key requirements include the submission of original bid bonds, the maintenance of comprehensive liability and workers compensation insurance, and the implementation of a written accident prevention plan compliant with OSHA standards. Technical specifications mandate adherence to various regulatory standards, including ADA compliance for entry ramps and specific cybersecurity protocols for facility equipment. Administrative requirements include electronic invoicing via the Treasury's Invoice Processing Platform and strict limitations on the substitution of key personnel during the first 120 days of performance. Bids must be submitted by 1400 local time on September 29, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 17 days
View Details
NAICS: 237110
New
Federal
Z--Yellowstone - Mammoth Water Line Replacement
Solicitation # 140P2026B0005
Solicitation 140P2026B0005 is a construction project for the National Park Service, Department of the Interior, to replace the water line in the Mammoth Housing Area of Yellowstone National Park, Wyoming. The project aims to re-establish a looped water system and ensure year-round water service to apartments. The scope of work includes installing approximately 750 linear feet of 6-inch HDPE water main and new water services to apartments, reconnecting and relocating fire hydrants, and rehabilitating or replacing faulty pressure-regulating valves. The estimated contract value ranges from 250,000 to 500,000 dollars, though it is currently noted as an unfunded requirement with a high expectation that funds will become available. This procurement is set aside for SBA Certified Women-Owned Small Businesses under NAICS code 237110, with a size standard of 45 million dollars. The estimated period of performance is 120 calendar days, which may include winter construction and weather-related shutdowns. Due to the rural location and the fact that the park remains open, contractors must implement unique material delivery logistics and schedule activities to minimize visitor impact. Bids are to be submitted via sam.gov by September 15, 2026, and will be opened and read according to FAR Part 14 procedures. The primary point of contact for this effort is Vicki Freese-Supler.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS